(Sr. No. 2, 9,10,11,19 in ANNEXURE "1")
(At right top corner of site/building plan at Ground Floor Level)
I. Area Statement
Square meter
- Area of plot
a) Area of Reservation in plot
b) Area of Road Set back
c) Area of D P Road
- Deductions for.
(A)For Reservation/Road Area
(a) Road set-back area to be handed over (100%) (Regulation No 16)
(b) Proposed D P road to be handed over (100%) (Regulation No 16)
(c) (i) Reservation area to be handed over (Regulation No 17)
(ii) Reservation area to be handed over as per AR (Regulation No 17)
(B) For Amenity area
(a) Area of amenity plot/plots to be handed over as per DCR 14(A)
(b) Area of amenity plot/plots to be handed over as per DCR 14(B)
APPENDICES AND ANNEXURES
DCPR-2034
(c) Area of amenity plot/plots to be handed over as per DCR 35(abeyance)
(C)Deductions for Existing Built up area to be retained if any/ Land component of Existing BUA / Existing BUA as per Regulation under which the development was allowed.
-
Total deductions: [ 2(A) +2(B) +2(C) as and when applicable.]
-
Balance area of plot (1 minus 3)
-
Plot area under Development after areas to be handed over to MCGM / Appropriate Authority as per Sr. No. 4 above.
-
Zonal (basic) FSI (0.50 or 0.75 or 1 or 1.33)
-
Built up Area as per Zonal(basic) FSI (5 * 6)
(In case of Mill land Permissible BUA kept in abeyance)
- Built up area equal to area of land handed over as per Regulation 30(A)
(i) As per 2(A) and 2(B) except 2(A)(c)(ii) above with in cap of “Admissible TDR as column6 of Table – 12 on remaining / balance plot
(ii) In case of 2(A) (c)(ii) permissible over and above permissible BUA on remaining / balance plot.
-
Built up Area In lieu of Cost of construction of built up amenity to be handed over (within the limit of permissible BUA on remaining plot)
-
Built up area due to “Additional FSI on Payment of Premium” as per Table No 12 of Regulation No 30 (A) on remaining / balance plot
-
Built up area due to admissible “TDR” as per Table No 12 of Regulation No 30(A) and 32 on remaining / balance plot
-
Permissible Built up Area {as the case may be with /without BUA as per 2( c)}
-
Proposed Built Up Area{as the case may be with /without BUA as per 2( c)}
-
TDR generated if any as per regulation 30 (A) and 32
-
Fungible Compensatory Area as per Regulation No 31(3)
a) i)Permissible Fungible Compensatory area for Rehab component without charging premium ii) Fungible Compensatory area availed for Rehab component without charging premium
b) i) Permissible Fungible Compensatory area by charging premium.
ii) Fungible Compensatory area availed on payment of premium
-
Total Built up Area proposed including Fungible Compensatory Area [13 +15(a)(ii) +15(b)(ii)]
-
FSI consumed on Net Plot [13/ 4]