Compliance through Building Envelope Trade-off method
Envelope performance factor (EPF) for the Standard Building and Proposed Building must be compared. As per the Building Envelope Trade-off method, the envelope performance factor (EPF) shall be calculated using the following equations:
Equation 11.1 E P F T o t a l = E P F R o o f + E P F W a l l + E P F F e n e s t
Where,
Standard Building EPF will be derived from U-factors, SHGCs and VLTs of walls, roofs and fenestration Table 4-4, Table 4-7, Table 4-10 and § 4.3.3 for a daytime use building in the hot and dry climate
zone. Values of C are from daytime Office building in hot and dry climatic zone for each class of construction fromTable 4-17. Since There is no shading for the windows, S E F w will not be considered.
Step 1: Calculation of EPF Proposed Building from actual envelope properties
= 4 3. 9 × 0. 4 0 × 1, 0 0 0 = 1 7, 5 6 0
Hence,
E P F F e n e s t, N o r t h = 2 3. 7 × 1. 8 × 3 0 + 2 3 8. 2 × 0. 2 5 × 3 0 = 1, 2 7 9. 8 + 1, 7 8 6. 5 = 3, 0 6 6. 3
E P F F e n e s t, S o u t h = 2 2. 8 × 1. 8 × 3 0 + 3 8 9. 7 × 0. 2 5 × 3 0 = 1, 2 3 1. 2 + 2, 9 2 2. 7 5 = 4, 1 5 3. 9 5
E P F F e n e s t, E a s t = 2 1. 6 × 1. 8 × 4 8 + 3 4 7. 4 × 0. 2 5 × 4 8 = 1, 8 6 6. 2 4 + 4, 1 6 8. 8 = 6, 0 3 5. 0 4
E P F F e n e s t, W e s t = 2 1. 7 × 1. 8 × 4 8 + 3 5 4. 1 × 0. 2 5 × 4 8 = 1, 8 7 4. 8 8 + 4, 2 4 9. 2 = 6, 1 2 4. 0 8
Therefore,
E P F F e n e s t = 1 9, 3 7 9. 3 7
E P F P r o p o s e d = 1 7, 5 6 0 + 1, 5 9 7. 0 5 + 1 9, 3 7 9. 3 7 = 3 8, 5 3 6. 4 2
Step 2: Calculating EPF Standard Building from prescriptive envelope requirements
= 4 3. 9 × 0. 3 3 × 1 0 0 0 = 1 4, 4 8 7
E P F F e n e s t = E P F F e n e s t, N o r t h + E P F F e n e s t, S o u t h + E P F F e n e s t, E a s t + E P F F e n e s t, W e s t
Now,
E P F F e n e s t, N o r t h = 2 3. 7 × 3. 0 × 3 0 + 2 3 8. 2 × 0. 5 × 3 0 = 2, 1 3 3 + 3, 5 7 3 = 5, 7 0 6
E P F F e n e s t, South = 2 2. 8 × 3. 0 × 3 0 + 3 8 9. 7 × 0. 2 7 × 3 0 = 2, 0 5 2 + 3, 1 5 6. 5 7 = 5, 2 0 8. 5 7
E P F F e n e s t, E a s t = 2 1. 6 × 3. 0 × 4 8 + 3 4 7. 4 × 0. 2 7 × 4 8 = 3, 1 1 0. 4 + 4, 5 0 2. 3 = 7, 6 1 2. 7
E P F F e n e s t, W e s t = 2 1. 7 × 3. 0 × 4 8 + 3 5 4. 1 × 0. 2 7 × 4 8 = 3, 1 2 4. 8 + 4, 5 8 9. 1 4 = 7, 7 1 3. 9 4
Therefore, E P F F e n e s t = 2 6 , 2 4 1 . 2 1
E P F Baseline = 1 4, 4 8 7 + 4, 0 2 4. 5 7 + 2 6, 2 4 1. 2 1 = 4 4, 7 5 2. 7 8
Since E P F B a s e l i n e > E P F P r o p o s e d therefore the building is compliant with ECBC building envelope requirements.