The Executive Officer,
Imphal Municipal Council, Imphal
Sub : Building Plan Application.
Sir/Madam,
I/We hereby apply for permission to undertake development and carry out :
Construction of....storied building.
Re-construction of an existing building.
Alteration/addition to the existing building.
Revalidation/Renewal of plan for construction of all.....storied building.
Certificate of Undertaking as per Form I(d)
....(if any other please specify)
In respect of Patta No....Dag No....Village No....at....Ward No....of Imphal Municipal Council. The said land and building shall be used for....purpose.
Name of Owner(s)
I/We enclosed herewith the following 4 (four) plans, other details and specifications duly signed by me and the Architect/Engineer/Group Agency....bearing Registered No...... Licence No...... who has/have prepared the plan, designs etc. And who will supervise the developments.
I/We the owner(s) of every part of the land/building to which this application relates. Request, permission for the above development may kindly be considered.
The Building permit fee as required under bye-laws....has been deposited vide receipt....dated....(photocopy enclosed).
Place :
Signature of Owner(s)
Date :
[53]
General Notes
A certificate to the effect that this report will be completed and submitted at least one month before commencement of construction shall be submitted with the application for Building Development Permission.
In addition to the completed report following additional information shall be submitted, at the latest, one month before commencement of construction.
2.1 Foundations.
2.1.1 In case raft foundation has been adopted indicate K value used for analysis of the raft.
2.1.2 In case pile foundations have used give full particulars of the piles, type, dia, length, capacity.
2.1.3 In case of high water table indicate system of countering water pressure, and indicate the existing water table, and that assumed to design foundations.
2.2 Idealization for earthquake analysis.
2.2.1 In case of a composite system of shear walls and rigid frames, give distribution of base shear in the two systems on the basis of analysis and that used for design of each system.
2.2.2 Indicate the idealization of frames and shear walls adopted in the analysis with the help of sketches.
2.3 Submit framing plants of each floor.
2.4 In case of basements, Indicate the system used to contain earth pressures.
[50]
Part 4 Buildings in structural steel
1
Adopted method of Design
O SimpleO Semi-rigidO Rigid
IS:00;CL.3.4.4IS:800;CL.3.4.5IS:800;CL.3.4.6
2
Design based on
O Elastic analysisO Plastic analysis
IS:00;Section-9SP:6(6)
3
Floor construction
O CompositeO Non compositeO Boarded
4
Roof construction
O CompositeO Non-compositeO MetalO Any other
5
Horizontal force resisting system adopted
O FramesO Braced framesO Frames and shear Walls
Note:Seismic forceAs per IS:1893 would depend on system
6
Slenderness ratios maintained
Members defined in Table 3.1, IS:800
IS:800;CL.3.7
7
Member of deflection limited to
Beams, Rafters Crane Girders Purlins Top of columns
IS:800;CL.3.13
8
Structural members
O Encased in concreteO Not encased
IS:800;Section-10
9
Proposed thickness Specified for corrosion materials
O General weld-ableO High strengthO Cold formedO Tubular
IS:2062IS:8500IS:801,811IS:806
10
Minimum metal protection
O Hot rolled sectionsO Cold formed sectionsO Tubes
IS:800;CL.3.8CL.3.8.1 to CL.3.8.4CL.3.8.5CL.3.8.5
11
Structural connections
O RivetsO CT BoltsO SHFG BoltsO Black Bolts
IS:800;Section-8IS:1929,2155,1149
[51]
O Welding-filedShop (Specifywelding typeproposed)O Composite
O Rating......hoursO Method proposed-- In tumescent painting- Spraying- Quilting- Fire retardant boarding
IS : 1641, 1642,1643
[52]
FORM I
Appendix BStructural Design Basis Report
This report to accompany the application for Building Permission.
In case information on items 3, 10, 17, 18 and 19 cannot be given at this time, it should be submitted at least one week before commencement of construction.
Part 1 General Data
Sl.No.
Description
Information
Notes
1
Address of the building* Name of the building* Plot number* Subplot number* TPS schemea. Nameb. Number* Locality/Township* District
2
Name of the owner
3
Name of builder on record
4
Name of Architect/Engineer on record
[44]
5.
Name of Structural Engineer on record
6.
Use of the building
7.
Number of storeys above ground level(including storey to be added later, if any)
8.
Number of basements below ground level
9.
Type of structure■ Load bearing■ R.C.C. frame■ R.C.C. frame and shear walls■ Steel frame
10.
Soil data■ Type of soil■ Design safe bearing capacity
IS: 1893 CI.6.3.5.2IS: 1904
11.
Dead load (unit weight adopted)■ Earth■ Water■ Brick masonry■ Plain cement concrete■ Reinforced cement concrete■ Floor finish■ Other fill materials■ Piazza floor fill and landscape
IS: 875 Part 1
12.
Imposed (Live) loads■ Piazza floor accessible to Fire Tender■ Piazza floor not accessible to Fire Tender■ Floor loads
IS: 875 Part 2
13.
Cyclone/Wind■ Speed■ Design pressure intensity
IS: 875 Part 3
14.
Seismic zone
IS: 1893 (2002)
15.
Importance factor
IS: 1893 (2002) Table 6
16.
Seismic zone factor (Z)
IS: 1893 Table 2
17.
Response reduction factor
IS: 1893 Table 7
18.
Fundamental natural period-approximate
IS: 1893 CL. 7.6
19.
Design horizontal acceleration spectrum value (Ah)
IS: 1893 CL. 6.4.2
20.
■ Expansion/Separation joints
■ Enclose small scale plants of each floor on A4 sheets.
In case terrace garden is provided, indicate additional fill load and live load.
■ Indicate on a small scale plan on A4 sheet.
[45]
Part 2 Laod bearing masonry buildings
Sl. No.
Description
Information
Notes
1
■ BuildingCategory
IS:4326 CL. 7 read with IS:1893
Zone II Bldg III IV V
Ordinary B C D E
Important C D E E
2
Basement provided
3
Number of floors including ground floor (all floors including stepped floors in hill slopes)
4
Type of wall masonry
5
Type and mix of mortar
IS:4326 CL. 8.1.2
6
Re : size and position on openings (see note No. 1)■ Minimum distance (b5)■ Ratio (b1+b2+b3)/11 or (b6+b7)12 Minimum pier width between consequent opening (b4)■ Vertical distance (h3)■ Ratio of wall height to thickness 4■ Ratio of wall length between cross wall to thickness
IS:4326 Table 4, Fig. 7
[46]
1
2
3
4
7
Horizontal seismic bandAt plinth levelAt window sil levelAt lintel levelAt ceiling levelAt eave level of sloping roofAt top of gable wallsAt top of ridge walls
Vertical reinforcing barAt corners and T junction of wallsAt jambs of doors and window openings
IS:4326 CL 8.4.8IS:4326 CL 8.4.9
9
Integration of prefab roofing/flooring elements through reinforced concrete screed
☐ ☐☐
IS:4326 CL 9.1.4
10
Horizontal bracings in pitched trussIn horizontal plane at the level of tiesin the slopes of pitched roofs
☐ ☐☐☐ ☐☐
Notes :
Information in item 6 should be given on separate A4 sized sheets for all walls with large number of openings
IP. Indicated "Information Provided"
TP indicates "Information to be provided"
NA indicates "Not applicable"
Tick mark one bax.
[47]
APPENDIX-B (continued)
Part 3 Reinforced concrete framed buildings
Sl.No.
Description
Information
Notes
1
Type of building ■ Regular frames ■ Regular frames with shear walls ■ Irregular frames ■ Irregular frames with shear walls ■ Soft storey
IS: 1893 CL. 7.1
2
Number of basements
3
Number of floors including ground floor
4
Horizontal floor system ■ Beams and slabs ■ Waffles ■ Ribbed floor ■ Flat slab with drops ■ Flat plate without drops
5
Soil Data ■ Type of soil ■ Recommended type of foundation -Independent footings -Raft -Piles ■ Recommended bearing capacity of soil ■ Recommended, type, length, diameter and load capacity of piles ■ Depth of water table ■ Chemical analysis of ground water ■ Chemical analysis of soil
Ductile detailing of RC frame■ Type of reinforced used■ Minimum dimension of beans■ Minimum dimension of columns■ Minimum percentage of reinforcement of beans at any cross section■ Maximum percentage of reinforcement at any section of beam■ Spacing of transverse reinforcement in 2-d length of beams near the ends.■ Ratio of capacity of beams in shear to capacity of beams in flexure■ Maximum percentage of reinforcement in column
■ confining stirrups near ends of columns and in beam-column jointsa. Diameterb. Spacing■ Ration of shear capacity of columns to maximum seismic shear in the storey
IS : 456 CL.26.5.3.1IS : 13920CL. 7.4
Form II Certificate of Undertaking by Architect
With respect to the building work of erection, re-erection or for making alteration in the building located at....Patta No....Dag No....Village No....of Ward No....of Imphal Municipal Council, I certify that I am a Licensed Architect duly registered with the Council Vide Registration No....or that I am an Architect by profession and duly registered with the Council of Architecture, New Delhi vide Registration No....
That I have been engaged as an Architect for preparing the Building plans and to supervise construction in respect of building of Shri/Smt....situated at ward No....of Imphal Municipal Council.
That I have personally inspected that site. The plot has been demarcated at site and the size, shape and area of plot available at site tallies with the land document.
That there is no construction in existence at the plot and no construction shall be started before sanction of the building plans.
That there is no encroachment on the Municipal land/road/other property and road widths as shown in the layout plan are available at site.
That the proposal have been prepared strictly in accordance with the Building Byelaws/rules/regulation and practice of the Council and no misinterpretation on inference of provision of Building Bye-law has been done while preparing the plans.
The construction shall be carried out strictly in accordance with the sanctioned building plans and in case any deviation is carried out, I shall inform the Council within 48 hours.
That in case the owner dispenses with my services at any stage whatsoever, I shall inform the Council within 48 hours.
That mandatory setbacks have been proposed and shall be maintained in accordance with the setbacks marked in the layout plan/Master Plan/byelaws.
That nothing has been concealed and no misrepresentation has been made while preparing and submitting the building plans.
That in case anything contrary to the above is found or established at any stage, the Council shall be at liberty to take any action as it may deem fit including revocation of sanction of building plans and debarring me for submission of building plans with the Council and also lodge a complaint with the Council of Architecture for appropriate action/take action as deemed fit. (Strike out whichever is inapplicable).
Signature of owner with date
Name :
Address :
Signature of the Registered Architect/Architect on Record with Registration No. & date.
[54]
Form III
CERTIFICATE OF UNDERTAKING BY STRUCTURAL ENGINEER ON RECORD (SER)
(Only in respect of Lifeline & Special Building and Special Structures)
With respect to the building work of erection, re-erection or for making alteration in the building located at.... Patta No.... Dag No.... Village No.... of Ward No.... of Imphal Municipal Council, I certify that I am a Licensed/ Registered Structural Engineer duly registered with the Council vide Registration No....
That I have been engaged as a Registered Structural Engineer for preparing the Structural Design Basis Report, detailed structural design and detailed structural drawings for preparing the Building plans of Shri/Smt....situated at ward No. ....of Imphal Municipal Council.
That I am fully conversant of my duties and responsibilities under the regulations and assure that I shall fulfil them in all respects.
That I have prepared and signed a structural design basis report (SDBR).
That I undertake to carry out a detailed structural design and prepare structural drawings of the proposed building as per the latest Indian standard Specifications, ther structural safety requirements for all situations including natural disasters like cyclone & earthquake etc., as applicable, as stipulated under Chapter VII of this Bye-law, Part-6 (Structural Design) of the National Building Code of India, 2005 and other relevant codes.
That undertake to supply the owner and the Registered Construction Engineer the detailed structural drawings. If my services are terminated, I undertake to intimate the Council in writing.
Name :
Address :
Tel. No.:
Signature of owner with date
Signature of the Structural Engineer on Record with Registration No. & date.
[55]
Form IV
CERTIFICATE FOR STRUCTURAL SAFETY
With respect to the building work of erection, re-erection or for making alteration in the building located at....Patta No....Dag No....and Village No....of Ward No....of Imphal Municipal Council, I certify that the structural plans and details of the building submitted for approval satisfy the structural safety requirements for all situations including natural disasters like cyclone & earth quake etc., as applicable, as stipulated under Chapter VII of this Bye-law, Part-6 (Structural Design) of the National Building Code of India, 2005 and other relevant codes; and the information given therein is factually correct to the best of my knowledge. I will be responsible and liable for action by the Council if the plan/design contain misrepresentation or fraudulent information and the construction is made in deviation of approved plan or if there is any structural failure due to wrong/unsafe structural design. If my services are terminated, I undertake to intimate the Council in writing.
Signature of owner with date
Signature of the Registered Structural Engineer on Record with Registration & date.
Name :
Address :
[56]
FORM V
CERTIFICATE OF UNDERTAKING BY CONSTRUCTION ENGINEER ON RECORD (CER)
With respect to the building work of erection, re-erection or for making alteration in the building located at....Patta No....Dag No....Village No....of Ward No.... of Imphal Municipal Council, I certify that I am a Licensed/Registered Construction Engineer on Record duly registered with the Council vide Registration No.....
That I have been engaged as a Construction Engineer on Record for Building plans of Shri/Smt....situated at Ward No....of Imphal Municipal Council.
That I am fully conversant of my duties and responsibilities under the regulations and assure that all the works under my charge shall be executed in accordance with the drawings and specifications prepared for this project.
Signature of owner with date
Name :
Signature of the Construction Engineer on Record with Registration No. & date.
Address :
Tel. No..
[57]
FORM VI STATEMENT OF THE PROPOSAL AND CERTIFICATE By the owner and Registered Architect
With respect to the building work of erection, re-erection or for making alteration in the building located at....of Shri/Smt....Patta No....Dag No....of Village No....of Ward No....of Imphal Municipal Plot Area :....Square Metre.
AREA STATEMENT
DESCRIPTION
PERMISSIBLE
PROPOSED SQ. MT.
REMARKS SQ. MT.
Maximum Ground Coverage
Basement
Ground Floor
First Floor
Second Floor
Third Floor
Total Floor Area
Floor Area Ratio
Maximum height (in metres) Permissible : Proposed :
Setbacks PERMISSIBLE PROPOSED (in metres)
Front
Rear
Left
Right
Parking Spaces
Parking Spaces
Parking (No. of Cars)
Ground Floor covered parking
Open Space Parking
We hereby certify that
Plot is lying vacant and no construction shall be started before sanction.
The plot is free from all encumbrances.
Signature of Owners(s)
Signature of Registered Architect
Name....
Name.
(in block letters)
Address....
(in block letters)
Dated :
Dated :
To,
[58]
FORM VII
BPS No.
OFFICE OF THE
IMPHAL MUNICIPAL COUNCIL
Imphal, the 00/00/0000
Subject : Building Permission Sanction
Sir/Madam,
With reference to your application dated....for the grant of sanction to construction/re-construction/alteration/addition in the building to carry out the development specified in the said application situated in/at....Ward No....of Imphal Municipal Council, I am to state that the Council subject to the following conditions and corrections done in the plans has sanctioned the same on....
(1) The plans are valid upto....day....months....year.
(2) The construction will be undertaken as per sanctioned plan only and no deviation from the bye-laws will be permitted without prior sanction. Any deviation done against the bye-laws is liable to be demolished and the supervising licensed Architect/Engineer on Record engaged on the job will run the risk of being black listed.
(3) It will be the duty of the owner of the plot and the Architect/Engineer preparing the plans to ensure that the sanctioned plans are as per prevalent Master Plan/Zonal Plan/Building Bye-laws. If any infringement of bye-laws remains unnoticed, the Council reserves the right to amend the plants as and when infringement come to the notice and Council will stand indemnified against any claim on this account.
(4) A Notice in writing shall be sent to Council before commencement of the constructions of the building as per bye-laws. Similar notice will be sent to Council when the building has reached upto foundation/foundation base/plinth level and at any other level as desired by the Council.
(5) The owner shall not occupy or permit to occupy the building or use or permit to use the building or any part thereof affected by any such work until occupany certificate is issued by the Council.
[59]
(6) Council will stand indemnified and kept harmless from all proceedings in court and before other authorities of all expenses/claims which the Council may incur or become liable to pay as a result or in consequences of the sanction accorded by it to these building plans.
(7) Building permission accorded cannot be construed as evidence in respect of right title interest of the plot over which the plan is approved.
(8) Any dispute arising out of the land record or in respect of right/title/interest after this approval, the plan shall be treated automatically cancelled during the period of dispute.
(9) The doors and window leaves shall be fixed in such a way that they shall not, when open project on any street.
(10) The owner will not convert the house into more dwelling units on each floor than the sanctioned.
(11) The building shall not be constructed within minimum distance as specified in Indian Electric Rules from voltage lines running on side of the plot.
(12) The sanction will be void if auxiliary conditions mentioned above and other conditions imposed hereunder are not complied.
(13) The owner will use the premises for the use, which has been sanctioned.
(14) The owner will not proceed with the construction without having the supervision of an Architect/Engineer as the case may be. If he/she changes his Architect/Engineer he/she shall inform the Council about the appointment of new Architect/Engineer within 48 hours, with a proper certificate from him.
(15) The permission is valid for a period of one year with effect from the date of issue.
(16) Other conditions, if any..
Yours faithfully,
Encl: 2 sets of sanctioned plan.
Executive Officer,
Imphal Municipal Council.
[60]
BPS No.
FORM VIII
OFFICE OF THE
IMPHAL MUNICIPAL COUNCIL
Imphal, the 00/00/0000
Subject : Refusal of Building Permission Sanction
Sir/Madam,
With reference to your application dated....for the grant of sanction to construction/re-construction/alteration/addition in the building to carry out the development specified in the said application situated in/at....Ward No....of Imphal Municipal Council, I am to inform you that the sanction has been refused by Council as the work does not comply with the following provisions of Manipur Municipality Act, 1994 and Bye-laws made there under.
Executive Officer,
Imphal Municipal Council.
Encl: A set of plan.
Yours faithfully,
[61]
Address
FORM IX
Form for Notice for Commencement of Building Work
Imphal, the 00,....0000
The Executive Officer,
Imphal Municipal Council,
Imphal
Sub : Notice for commencement of work.
I/We hereby certify that the building work of erection, re-erection or for making alteration in the building located at........Patta No........Dag No........Village No........of Ward No.......of Imphal Municipal Council will commence on 00.00.0000 as per your permission vide office communication No. BPS/0000/0000-IMC dated 00.00.0000 under the supervision of Shri/Smt........Architect/Construction Engineer on Record/Supervisor/Group, License No........and in accordance with the plans sanctioned.
Signature of Owner(s)
Name(s) of the Owners (in block letters):
[62]
FORM X
Office of the Imphal Municipal Council
BPS Revalidation No.
Imphal, the 00/00/0000
Subject : Revalidation of Building Plans
Sir/Madam,
With reference to your application dated....for the grant of sanction to construction/re-construction/alteration/addition in the building to carry out the development specified in the said application situated in/at....Ward No....of Imphal Municipal Council, I am directed to inform you that your building plan which were sanctioned on....vide this office BPS No....have been revalidated up to....
Original sanctioned plan submitted by you is also returned herewith and kindly acknowledge receipt.
Yours faithfully,
Encl: A set of plan.
Executive Officer,
Imphal Municipal Council.
FORM XI
[63]
INTIMATION OF COMPLETION AT DIFFERENT STAGES OF CONSTRUCTION WORK
Imphal, the 00,......,0000
The Executive Officer, Imphal Municipal Council, Imphal
Sub: Intimation of completion at different stages of construction work.
I/We hereby certify that the building work of erection, re-erection or for making alteration in the building of Shri/Smt....located at....Patta No....Dag No....Village No....of Ward No....of Imphal Municipal Council has been completed up to footing trench/column up to plinth/plinth/slab level in accordance with your permission vide office communication No. BPS/0000/0000-IMC dated 00.00.0000 under my supervision and in accordance with the sanctioned plan.
You may please fix a convenient date and time to confirm the same.
Yours faithfully,
Signature of Licensed Architect/Engineer/Supervisor
Name :...........
(in block letters)
Address :...........
FORM XII
Form of Notice of Completion
Imphal, the 00,......, 0000
The Executive Officer,
Imphal Municipal Council,
Imphal
Sub: Notice of Completion.
I/We hereby give notice that I/We have completed the erection of building/execution of the building situated at....Patta No....Dag No....Village No....of Ward No....of Imphal Municipal Council in pursuance of the sanction granted by the Council vide office communication No. BPS/0000/0000-IMC dated 00.00.0000.
Permission to occupy or use the building may be granted.
Yours faithfully,
Name of Owner:...........
(in Block letters)
Address of the owner :
Signature of owner :
[65]
FORM XIII
FORM FOR CERTIFICATE OF ARCHITECT/ENGINEER/SUPERVISOR (To be submitted along with notice of completion)
To,
The Executive Officer,
Imphal Municipal Council,
Imphal
Sub: Notice of Completion.
Dear Sir,
I/We hereby certify that the erection, re-erection or material alteration in/at building of Shri/Smt....situated at....Ward No....of Imphal Municipal Council has been supervised by me and has been completed on 00.00.0000 according to the plans sanctioned, sanction granted by the Council vide office communication No. BPS/0000/0000-IMC dated 00.00.0000. The work has been completed to our best satisfaction, the workmanship and all the materials (type & grade) have been used strictly in accordance with general and detailed specifications under our supervision and as per Building Bye-Laws. No provisions of the building Bye-Laws and condition prescribed or order issued there under have been transgressed in the course of the work. The building is fit for use for which it has been erected/re-erected or altered and constructed.