the owner shall be allowed to construct an extra floor with an equivalent built up area for the area surrendered, subject to mandated public safety requirements.
15. GRANT OF TRANSFERABLE DEVELOPMENT RIGHT:
Grant of Transferable Development Right (TDR) may be considered by the Competent Authority for the following areas subject to the owner complying with the conditions of development above, as per the following norms:
(a) For the Master Plan road network undertaken and developed: equivalent to 100 % of built up area of such area surrendered.
(b) For conservation and development of lakes / water bodies / nalas foreshores & Recreational buffer development with greenery, etc: equivalent to 50 % of built up area of such recreational buffer area developed at his cost.
(c) For Heritage buildings and heritage precincts maintained with adaptive reuse: equivalent to 50 % of built up area of such site area.
The TDR may be arrived at on the basis of relative land value and equivalent amount in both export and import areas, as per the Registration Department records. The Competent authority shall have the discretion in the matter of applicability of TDR. The TDR shall not be allowed in unauthorized buildings/structures/constructions. The TDR Certificate would be issued by the Competent authority would be valid or utilized/ disposed only within the concerned local body area and as per guidelines and conditions prescribed by the Competent Authority.
16. LEVY OF SPECIAL FEES AND OTHER PROVISIONS FOR CERTAIN AREAS:
The Sanctioning Authority with the specific approval of the Government may, when implementing such Projects, levy Special fees and other fees / charges for lands / sites / premises abutting or in the vicinity of the Ring Road or other highways / major roads or the Mass Rail Transit System / Light Rail Transit / MMTS route indicated in the Master Plan, at the rates and procedure prescribed by the Government.
17. CITY LEVEL INFRASTRUCTURE IMPACT FEES APPLICABLE IN CERTAIN CASES:
(1) With a view to ensuring development of City Level Infrastructure facilities and levy of Impact Fees, buildings are categorized as follows:
Type I : Buildings up to height 15 m excluding stilt parking floor
Type II : Buildings of height above 15 m (excluding stilt floor)
The City level Infrastructure Impact Fees would be levied for Buildings under Type II above as follows:
First 15 m or 5 floors (whichever is less): No levy of Impact fee
For any additional floors or part thereof: at differential rates specified in Table below:
| Occupancy / Use | Height of Building (in metres) and rate in Rs. per sq m of built up area | |||
| Above 15 m & up to 21 m | Above 21 m & up to 30 m | Above 30 m & up to 50 m | Above 50 m | |
| Residential | Municipal Corporation Area | |||
| 500 | 750 | 1500 | 3000 | |
| Other areas of UDA Area | ||||
| 250 | 500 | 1000 | 2000 | |
| Commercial, Offices, ITES | Municipal Corporation Area | |||
| 1000 | 1500 | 2500 | 5000 | |
| Other areas of UDA Area | ||||
| 500 | 1000 | 2000 | 4000 | |
| Institutional, educational & Others (except Industrial sheds) | Municipal Corporation Area | |||
| 300 | 500 | 1000 | 2000 | |
| Other areas of UDA Area | ||||
| 100 | 200 | 400 | 800 | |
(2) Alternatively, the owner may be allowed to utilize TDR given in Rule 14 above, for such built up area to the extent permissible wholly or use the same in combination of both TDR and the differential impact fee for the proposed additional built up area that is permissible under these Rules / Provisions. The Government may revise the above rates from time to time.
(3) The above rates shall not be applicable for Government Departments and public agencies like Urban Development Authority, APIIC, local bodies and HMWSSB.
(4) The amount levied and collected under above Rule shall be credited and maintained in a separate escrow account by the concerned sanctioning authority and 50% utilised for development of infrastructure in the same area and balance utilised towards improvement of city level capital infrastructure in the area. An Infrastructure Plan and Action Plan for implementation is required to be undertaken by the Competent authority and the said Fund utilised accordingly.
(5) The Premium on F.A.R. charges leviable in CDA area and the impact fees being levied in MCH area are dispensed with.
18. INCENTIVES FOR OWNERS LEAVING MORE SETBACKS / INSTALLING SOLAR HEATING SYSTEM / LIGHTING / RAIN WATER HARVESTING / RECYCLING OF WASTE WATER:
The following incentives in terms of rebate in Property tax will be given by the local authority for owners or their successors-in-interest who:
(a) Construct the building /blocks by leaving more setbacks than the minimal stipulated in these Rules:
Leaving 1.5 times the minimum setbacks in all sides: 10 % rebate*
Leaving 2.0 times the minimum setbacks on all sides : 20 % rebate*
* The setbacks has to be on all sides to qualify for the rebate. Leaving more on one side and the minimum on other sides would not qualify for such rebate.
(b) Install and use solar heating and lighting system : 10 % rebate.
(c) Undertake both recycling of waste water and rain water harvesting structures: 10 % rebate
d) Where owners provide at least 25% additional parking space over and above the minimum specified in Rule 11, they would be allowed for a rebate of 10 % in property tax.
19. BUILDING PERMIT/LICENSE FEES & UNDERTAKING:
a) The Sanctioning Authority shall along with the Building Application levy and collect 2% of the Building Permit / License fees, subject to a maximum of Rs.10,000 as initial fees. The balance building permit / License Fees together with other fees and Charges shall be levied and collected before the issue of permission/sanction. In case of rejection of application, the above initial fees would be forfeited.
b) No fees and charges would be levied for parking spaces provided in stilt/cellar
floors.
20. COMPLIANCE BY OWNER FOR ENSURING CONSTRUCTION IS UNDERTAKEN AS PER SANCTIONED PLAN:
a) The owner and builder/developer shall give an Affidavit duly notarized to the effect that in the case of any violation from the sanctioned building plan, the Enforcement Authority can summarily demolish the violated portion. In respect of Apartment Buildings, the owner or builder shall give a Declaration duly specifying the number of floors permitted, the number of flats/apartments in each floor along with the extent of each flat. In case of any violation with regard to the Declaration, the Enforcement Authority can demolish the violations.
b) Before the release of the building sanction by the sanctioning authority, the owner of the plot/site is not only required to produce the original Sale Deed, registered under the provisions of the Indian Registration Act, 1908 for the perusal of the sanctioning authority and cross verification with the attested copy submitted with the building application.
c) The owner is required to hand over the ground floor area or first floor or the second floor area, as the case may be, to the sanctioning authority by way of a Notarised Affidavit and after the setbacks and open spaces are demarcated on the site. The Notarised Affidavit shall be got entered by the sanctioning authority in the Prohibitory Property Watch Register of the Registration Department. Then only the Building sanction will be released and the owner shall be allowed to commence the construction.
The system of taking a Security Deposit is dispensed with.
(i) The sale or disposal of such built up area under the said Notarised Affidavit by way of sale, lease and registration of such buildings shall be allowed by the Registration Authority only after an Occupancy Certificate is obtained from the sanctioning authority.
(ii) In case of any violation of building construction onto the setbacks or open space or area to be left for any road widening, shall be removed by the owner within one week of issue of Notice by the Enforcement Authority.
(iii) Upon failure to comply with the above direction of the Enforcement Authority, the Sanctioning Authority may dispose the handed over portion of the building by public auction duly removing the violated portion.
(iv) The sanctioned plans giving other details along with sanction date, built up area permitted, area handed over to the sanctioning authority, and insurance policy details shall be displayed by the owner/builder on Board at the site.
(v) A comprehensive building compliance insurance policy has to be taken covering aspects of building services, fire safety, maintaining mandatory setbacks /open spaces, and landscaping of the site (the terms and conditions and other details of which would be separately worked out) before commencement of construction,
21. OCCUPANCY CERTIFICATE:
(i) Occupancy Certificate shall be mandatory for all buildings. No person shall occupy or allow any other person to occupy any building or part of a building for any purpose unless such building has been granted an Occupancy Certificate by the Sanctioning Authority.
(ii) The owner shall submit a notice of completion through the registered architect and licenced builder/developer along with prescribed documents and plans to the Sanctioning Authority. The Sanctioning Authority on receipt of such notice of completion shall undertake inspection with regard to the following aspects:
(a) Number of floors
(b) External setbacks
(c) Parking space provision
(d) Abutting road width
and shall communicate the approval or refusal of the Occupancy Certificate within 15 days or may issue the same after levying and collecting compounding fee, if any, as follows:
(iii) The sanctioning authority is empowered to compound the offence in relation to setbacks violations (other than the front setback) upto 10%, duly recording thereon the violations in writing. The rate of Compounding fee shall be a minimum rate of Rs.1000 per sq m of built up area on each floor in Municipal Corporation areas and at the rate of Rs.500 per sq m in case of other Municipal areas and UDA areas, and the Government may revise this rate from time to time. Compounding of such violation shall not be considered for
buildings constructed without obtaining any sanctioned plan. This shall be maintained in a separate escrow account and utilised towards improvement of the roads and public open spaces development in the area.
(iv) For all high rise buildings, the work shall be subject to inspection by the Fire service Department and the Occupancy Certificate shall be issued only after clearance from the Fire Services Department with regard to Fire Safety and Protection requirements.
(v) The functional/line agencies dealing with electric power, water supply, drainage and sewerage shall not give regular connections to the building unless such Occupancy Certificate is produced, or alternatively may charge 3 times the rate in the absence of Occupation Certificate for such buildings. In addition to the above, the local body shall collect every year two times the property tax as penalty from the owner/occupier.
(vi) The Registration Authority shall register only the permitted built up area as per the sanctioned building plan and only upon producing and filing a copy of such sanctioned building plan. On the Registration Document it should be clearly mentioned that the registration is in accordance with the sanctioned building plan in respect of setbacks and number of floors.
(vii) The financial agencies/institutions shall extend loan facilities only to the permitted built up area as per the sanctioned building plan.
22. ENFORCEMENT
A) In addition to the enforcement powers and responsibilities given in the respective laws of the local authority, in respect of these Rules:
(i) The Enforcement Authority concerned shall be wholly and severally responsible for ensuring and maintaining the road right of way/width and building restrictions as given in these Rules. The Enforcement Authority shall particularly check all buildings/structures for any violations along all main roads/public roads and take action to remove these.
(ii) The Enforcement authority shall summarily remove any violation or deviation in building construction in maintaining the road widths and building line.
B) Constitution of Town Planning and Building Tribunal:
The Government shall constitute a Town Planning and Building Tribunal for dealing with all town planning, enforcement and building issues by making necessary amendment to the AP Urban Areas (Development) Act, 1975.