(1) Every person who intends to occupy such a building or part thereof shall apply for the occupation certificate in Form BR-IV(A) or BR-IV(B), which shall be accompanied by certificates in relevant Form BR-V(1) or BR-V(2) duly signed by the Architect and/ or the Engineer and along with following documents:
(i) Detail of sanctionable violations from the approved building plans, if any in the building, jointly signed by the owner, Architect and Engineer.
(ii) Complete Completion drawings or as-built drawingsalong with completion certificate from Architect as perForm BR-VI.
(iii) Photographs of front, side, rear setbacks, front and rear elevation of the building shall be submitted along with photographs of essential areas like cut outs and shafts from the roof top. An un-editable compact disc/ DVD/ any other electronic media containing all photographs shall also be submitted.
11 Inserted/amended vide Misc-138A-Loose/7/5/2006-2TCP dated 22.12.2017
[29]
(iv) Completion certificate from Bureau of Energy Efficiency (BEE)Certified Energy Auditor for installation of Rooftop Solar Photo Voltaic Power Plant in accordance to orders/ policies issued by the Renewable Energy Department from time to time.
(v) Completion Certificate from HAREDA or Bureau of Energy Efficiency (BEE) Certified Energy Auditor for constructing building in accordance to the provision of ECBC, wherever applicable.
(vi) No Objection Certificate (NOC) of fire safety of building from concerned Chief Fire Officer or an officer authorized for the purpose.
(2) No owner/ applicant shall occupy or allow any other person to occupy new building or part of a new building or any portion whatsoever, until such building or part thereof has been certified by the Competent Authority or by any officer authorized by him in this behalf as having been completed in accordance with the permission granted and an ‘Occupation Certificate’ has been issued in Form BR-VII.However, Competent Authority may also seek composition charges of compoundable violations which are compoundable before issuance of Form BR-VII. Further, the water, sewer and electricity connection be released only after issuance of said occupation certificate by the Competent Authority.
(3) The ‘Occupation Certificate’ shall be issued on the basis of parameters mentioned below:-
12(i)(a) For residential plots, minimum 25% of the total permissible ground coverage, shall be essential to be constructed to obtain occupation certificate, wherein one habitable room, a kitchen and a toilet forming part of submitted building plan is completed.
(b)For Inland Container Depot (ICD) minimum area for considering approval of grant of occupation certificate shall be 2.5% of the permissible ground coverage.
(c)For other buildings, the minimum area norm for grant of occupation certificate shall be as under:-
| Sr. | Area of site | Minimum area required for |
|---|
12 Substituted vide Misc-2339(ULB)-Vol-III/SD(DK)/2019/7/19/2019-2TCP dated 04.06.2019
[30]
| No. | approval of building plan and grant of occupation certificate. | |
|---|---|---|
| 1 | Upto 1 acre | 25% of permitted coverage on all floors i.e. total permissible FAR. |
| 2 | Above 1 acre and upto 5 acres | 20% of permitted coverage on all floors i.e. total permissible FAR. |
| 3 | Above 5 acres and upto 10 acres | 15% of permitted coverage on all floors i.e. total permissible FAR. |
| 4 | Above 10 acres | 10% of permitted coverage on all floors i.e. total permissible FAR. |
Note:- The area to be constructed in all types of cases under category (i) (a), (b) and (c) above can be achieved either at ground floor or at subsequent floors.”
(ii) The debris and rubbish consequent upon the construction has been cleared from the site and its surroundings.
(4) 13[After receipt of application, the Competent Authority shall communicate in writing within eighteen days, his decision for grant/ refusal of such permission for occupation of the building in Form BR-VII. The E-register shall be maintained as specified in Code-4.8 for maintaining record in respect of Occupation Certificate..
(5) If no communication is received from the Competent Authority within 60 days of submitting the application for “Occupation Certificate”, the owner is permitted to occupy building, considering deemed issuance of “Occupation certificate” and the application Form BR-IV (A) or BR-IV(B) shall act as “Occupation Certificate”. However, the competent authority may check the violations made by the owner and take suitable action.
mentioned in Code 4.10(1)(i), (iv) and (v) as the case may be, submits a wrong report while making application under this Code or if any additional construction or violation is reported to exist at site or has concealed any fact or mis-represented regarding completion of construction of building along with its eligibility for seeking occupation certificate or before the completion of such report, he shall be jointly and severally held responsible for such omission and complaint against the
13 Inserted/amended vide Misc-138A-Loose/7/5/2006-2TCP dated 22.12.2017
[31]
Architect for suspension of his registration and the owner shall be liable to pay for the penalty as may be decided by the competent authority after giving an opportunity of hearing. Further, if it is emerged that the information is concealed by Engineer/ Consultant/ Owner, necessary penal proceedings will be initiated along with debarring Engineer/ Consultant/ Architect from practicing in the State of Haryana.
(7) 14The cases where building plans have been approved under Punjab Scheduled Roads & Controlled Areas Restriction of Unregulated Development Rules, 1965 i.e. prior to implementation of Building Code, and their applications for Occupation Certificates are being considered now as per Building Code, 2017, in such cases building plans should be considered as deemed approved as per the provisions of Haryana Building Code, 2017, subject to payment of composition charges