Following receipt of the Notice of Completion of Construction, the BPIA shall undertake final inspection of construction for ensuring compliance to sanctioned design and specifications. The BPIA shall communicate the date and time of inspection to the owner within 15 working days of receipt of Notice of Completion of Construction, through designated online Building Permission Portal. The inspection shall be recorded digitally along with geo-tagged photographs. The report shall be uploaded along with geo-tagged photographs and final decision within 15 days from the date of inspection shall be communicated through system. Non-submission of the inspection report within the stipulated period shall be deemed as no objection from the BPIA.
If, on inspection, BPIA is satisfied that the construction of the building complies with the sanctioned design and specifications, it shall grant a Building Use Permit and sanctioned use may be made of the building strictly within 30 days .
9. In clause 2.9, a new sub clause shall be inserted after 2.9.2 as “sub clause 2.9.2 A” as under:
Notice/Application:
Application for Revalidating a Lapsed Building Permit shall be made by the owner of the plot on which building is proposed through the Designated online
Q
Building Permission Portal of the Housing & Urban Development Department (H&UDD).
7. Clause 2.9.1 shall be replaced with the following:
Notice of Completion of Construction and Application for Occupancy-cum-Completion Certificate:
The applicant shall apply online for the Occupancy-cum-Completion Certificate through the Designated Building Permission Portal of the Housing & Urban Development Department (H&UDD), Government of Jammu & Kashmir, upon completion of construction of the building along with the following details:.
i. A certificate of completion duly signed by the owner and the registered professional certifying that the construction has been carried out in conformity with the sanctioned plan and structural safety norms.
ii. As-built drawings in digital format, showing any minor deviations (if within permissible limits).
iii. Photographic evidence of the completed structure and mandatory on-site facilities such as parking, setbacks, rainwater harvesting, sanitation, and fire safety provisions.
iv. Certificate of structural stability and compliance with energy efficiency and green building norms, wherever applicable
The BPIA shall, after conducting field verification of the site and obtaining the digital inspection report from the designated inspection team, issue the Occupancy-cum-Completion Certificate online through the same portal within 15 days of the application submission.
The digital issuance of the Occupancy-cum-Completion Certificate by the BPIA shall have the same legal validity as a physically signed certificate and shall be deemed a conclusive proof of completion of construction and authorization for occupancy as per the approved building plans.
Temporary Occupancy:
Where only a part of the building has been completed and is fit for occupation, the BPIA may grant a temporary occupancy certificate for such part, subject to fulfilment of all safety and utility requirements.
Refusal of Occupancy / Building Use Permit:
If the construction is found in violation of the sanctioned plan or provisions of these bye-laws, the Competent Authority may refuse to issue the Occupancy / Building Use Permit, recording reasons in writing and notifying the applicant through the designated Online Building Permission Portal.
8. Sub-Clause 2.9.2 shall be replaced as following:
Chapter 2Grant of Building Permit:
a) Where the system determines full compliance with all applicable provisions, the application shall be auto-forwarded to the Competent Authority for digital approval and grant of Building Permission through the online Portal.
b) The permit shall be issued electronically with digital signatures of the BPIA, accompanied by the approved building plan and relevant conditions of sanction.
c) The approval shall be deemed valid only for the plot and parameters verified under the online portal and linked land records, if any.
3. Refusal of Building Permit:
a) If BPIA identifies deviations, deficiencies, or non-conformities with the provisions of the bye-laws, it shall generate a Deviation Report and notify the applicant or architect to correct and re-submit the plan.
b) Where deviations remain unresolved or non-compliance persists, the BPIA may refuse the building permission, recording reasons for such refusal in the portal.
c) A digitally signed Refusal Order with reasons, if any, shall be issued through the system and communicated to the applicant electronically.
4. Record and Transparency:
All building permits, refusal orders, and related scrutiny reports shall be stored in a tamper-proof digital repository, accessible to both applicants and the approving authority for audit and monitoring purposes.
5. Sub clause 2.7.1: Notice/Application shall be replaced as under:
Notice/Application for revised building permits:
Application for Revising a Building Permit shall be made by the Owner of the plot through Registered Technical Person via designated online Building permission portal of H&UDD.
6. Clause 2.8.3 shall be replaced by the following:
2.9.2A: Third-Party Verification, Inspection and Certification\
a. The Registered Technical Person (RTP) shall act as a Third-Party Agency for the purposes of coordinating joint inspections, field verifications, and other
[Figure]
technical procedures required for grant of Building Permission and Occupancy-cum-Completion Certificates under these Bye-Laws.
b. Once registered on the Designated online Building Permission Portal of H&UDD, the RTP shall be eligible to apply for and undertake building permission-related activities in any Urban Local Body (ULB), Development Authority, or agency functioning under the administrative control of the Housing & Urban Development Department, without the need for separate registration in individual jurisdictions
Chief Architect, Architects Organization or notified Authority by Housing and Urban Development Department ARTP prescribed.
Scope of Third-Party Functions:
The RTPs may be assigned any or all of the following functions—
(i) Pre-Approval Site Verification: Verification of site boundaries, existing structures, and access before plan approval.
(ii) Technical Scrutiny Support: Verification of scrutiny reports in complex or high-rise projects.
(iii) During Construction Inspection: Periodic field checks to ensure conformity of construction with sanctioned plans and building bye-laws.
(iv) Completion / Occupancy Verification: Independent inspection before grant of Completion or Occupancy Certificate.
Integration with designated online building permission portal:
(a) The designated online building permission portal shall include a Third-Party Inspection Module for automated assignment of inspection tasks to empanelled RTPs/recognized institutes through random or rotational allocation.
(b) RTPs shall upload digitally signed, time-stamped, and geo-tagged inspection reports directly into the designated online building permission portal, linked with the unique application ID.
(c) The inspection report shall form part of the final approval record of the BPIA.
Accountability and Independence:
a) RTPs shall have no conflict of interest in the projects they inspect.
b) Any misconduct, collusion, or negligence shall invite suspension, debarment, and other disciplinary or legal action as per Government guidelines.
b. The RTP shall certify that:
i. The drawings submitted for building permission conform to all relevant bye-laws and regulations;
ii. The structural design has been prepared in accordance with the latest Bureau of Indian Standards (BIS) codes for safety against structural failure, fire, seismic, and wind loads;
iii. The construction is being executed under his/her supervision as per the sanctioned plan and approved structural drawings.
c. The RTP shall submit a Progress Report / Supervision Certificate at stages as prescribed by the Competent Authority and shall notify any violation or unauthorized construction immediately to the Authority.
d. On completion of construction, the RTP shall issue a Completion Certificate confirming that the building has been completed in accordance with the sanctioned plan and all safety norms.
e. Any RTP found guilty of professional misconduct, negligence, or issuing false certificates shall be liable for disciplinary action, including suspension or cancellation of registration, blacklisting, and initiation of legal proceedings as per law.
3. Joint Liability:
The owner and the concerned RTP(s) shall be jointly and severally responsible for:
[Signature]
i. Any deviation from the sanctioned plan,
ii. Violation of these bye-laws,
iii. Structural instability due to defective design or construction,
iv. Misrepresentation of facts or submission of false documents.
4. Change of RTP:
a. The owner may, during construction, change the appointed RTP with prior intimation to the BPIA through the designated online Building Permission portal system, with a consent letter from the new RTP.
b. The outgoing RTP shall be relieved of responsibility only after submission of a formal notice of disengagement and acceptance thereof by the BPIA.
13. Clause 2.14.2 shall be replaced as follows:
1. Grounds for Revocation:
The Competent Authority may, at any time, revoke a building permit issued under bye-laws, if it is found that:
(a) The permit has been obtained by misrepresentation of facts, submission of false documents, or suppression of material information;
(b) The approval has been granted due to clerical error, misinterpretation, or technical defect the scrutiny process;
Qualifications for Registered Technical Persons:
a) Minimum Qualifications and Competence Requirements:
The authority shall empanel Town Planners, Architects, Civil Engineers,
Structural Engineers, Geotechnical Engineers, Urban Designers, Landscape Architects, Electric Engineers as Town Planners on Record, Architects on Record (AoR), Engineers on Record (EoR), Structural Engineers on Record (SEoR), Geotechnical Engineers on Record (GTEoR), Urban Designers on Record (UDoR), Landscape Architects on Record (LAoR), Electric Engineers on Record (EEoR), Surveyor 1 & Surveyor II etc respectively. Applications for empanelment should be made through online designated building permission portal to Chief Architect, Architects Organization, Jammu and Kashmir or as any other authority as notified by the Housing and Urban Development Department.
In Section 2.19 – Qualifications for Registered Technical Persons, under Table 2-4: Minimum Qualifications and Competence Requirements, after the existing entry at S. No. 12 (Fire Consultant on Record - FCoR), the following new entry shall be inserted:
In Section 2.19 – Registration of Technical Personnel, in sub-clause (a),
S.No.
Professional Category
Qualification / Eligibility
Competence / Functions
13
Others
As may be notified by Architects organisation or authority notified by the Housing & Urban Development Department (H&UDD) from time to time.
The inclusion of such professionals or authorities under this category shall be at the discretion of the designated authority notified by H&UDD. These professionals shall be eligible for registration as Registered Technical Persons (RTPs) on the Designated Building Permission Portal, subject to prescribed qualification, role, and scope of work as may be notified by the authority
designated by the Department.
Explanation: The “Others” category shall allow the H&UDD to include or designate, by notification or circular, any other relevant professional, technical expert, or authority deemed necessary for building plan scrutiny, certification, or approval functions, to be registered and recognized as Registered Technical Persons (RTPs) within the Online Building Permission System (OBPS).
The departments whose clearances shall be integrated online include:
Revenue Department, Public Health Engineering (PHE), Power Development Department (PDD), Public Works Department (PWD), Sewerage & Drainage, Jammu Development Authority (JDA), Srinagar Development Authority (SDA), Lakes Conservation & Management Authority (LCMA), Town Planning Organisation Jammu/Kashmir (TPOJ/K), J&K Housing Board, J&K Sainik Cooperative Society, Custodian Department, PRO Department, J&K Cooperative Society, Heritage Department, Forest Department, Indian Railways, Airports Authority of India (AAI), Fire & Emergency Services, National Highways Authority of India (NHAI), Pollution Control Board, and Irrigation & Flood Control Department.
4. Common Application Form :
The concerned Local Bodies and Authorities shall ensure that the applicants are required to fill only single Common Application Form (CAF) through online mode and all requisite NOCs required from the above Line departments are processed only online through the Designated Building Permission Portal of the Housing & Urban Development Department in coordination with the respective agencies, ensuring that no physical submission of NOC requests shall be required from the application.
18. Clause 2.19 shall be replaced by the following:
Notice for Commencement of Construction
The Owner of the building shall notify the authority through designated online Building permission Portal of H&UDD of his intention to commence construction at least 7 days prior to commencing construction of Commencement of Construction. This shall not be applicable to self-use homes.
Clause 4.1.10.; Permit to proceed with construction required shall be deleted.
Clause 4.1.11: Grant or refusal of permit to proceed with construction required shall be deleted.
25. Clause 5.1.1, shall be substituted with the following:
Clause 5.1.1 Land-Use & Uses Permitted, after point 2, point 3 shall be inserted as: “In case of towns not having even the structure plan, towns should have a Local Area Notified which shall be the local area of concerned authority.”
26. Clause 5.1.2, shall be replaced with the following:
5.1.2 Proposed Zoning: Proposed Land Use Zoning shall be as per Master Plan which is in vogue. In absence of Master Plan, the land use classification as per existing Right of Way(RoW) shall prevail.
27. Clause 5.1.3, shall be replaced with the following:
Clause 5.1.3 Permissible & Non-Permissible Uses as per the Use Zone as per the Existing Road Width (Table 5-2) shall be deleted. The negative list of permissible uses shall prevail as per master plans of respective towns and other conditions enclosed as Annexure-A to the Bye laws.
Clause 5.2 Development Control Regulations shall be replaced.
Clause 5.2.1.1, shall be replaced with the following
Development Control Regulations: the contents of Table No. 5-3 shall be replaced as under and shall not be applicable to Govt. approved housing colonies where approved layout and type design shall be followed.
Table No. 5-3 The regulations for Residential Use in terms of Plot area, FAR & Setbacks shall be as given below:
A.
Minimum Setbacks & other regulations for Residential Use.
S. No
Area (Sq. m)
Building line
RoW (In mts.)
FAR
Type of Const.
Set back Limits (min. in mts.) %age
Front
Setbacks other than front setback
1.
Up to 75
2/5 of RoW up to 6 m of RoW+1/2 of RoW and 1/5 of RoW +1/2 of RoW beyond 6m of RoW
Min 1.5M
220
Row
Front setback as per building line
Nil
2.
Above 75 - 125
Row
Nil
3.
Above 125 - 275
Row
10%
4.
Above 275 - 350
Semi-detached
10%
5.
Above 350 - 450
Semi-detached
10%
6.
Above 450 - 600
Detached
10%
见
7.
Above600 - 1000
Detached
15%
8.
Above 1000
Detached
25%
Notes:
There shall not be any ground coverage restriction.
To cater to parking requirement in individual plotted residential houses, stilt floor shall be allowed within the building envelope and shall be exclusively used for parking for roads 6m and above.
Any area within building envelope provided for parking on ground shall not be counted in covered floor area and the same area shall be allowed for habitable purpose on 3rd floor.
In case stilt parking is provided within building envelope in combination with ground floor, the area under parking shall be allowed for habitation on 3rd floor. Height of stilt floor in this case shall not be more than 3m.
Basements in individual plotted housing shall be counted towards FAR and ground coverage.
Single basement shall be allowed within the building envelope ensuring structural safety with maximum height of 3.0 m from finished floor to soffit of beam.
Porches up to an area of 17 Sqm shall be allowed in side setbacks only and no construction over such porches shall be allowed.
Areas under porch shall be calculated @ 50% for coverage.
Attic/Truss Height shall not be included in the permissible height and shall be in addition to permissible FAR.
It is mandatory to provide parking space for as many cars as owned by the plot owner or the residing family, inside the plot premises, failing which the building plan permission shall be rejected. The plot owner shall submit the car ownership details at the time of building plan permission.
√
Minimum setback of 1.5m shall be required for having windows/openings on all sides excluding front side for plot sizes upto 125 sq.m.
B. Regulations for Group Housing (Flatted Development)
S.No.
Plot Area (Sq. m)
Max. FAR
Min. ROW In mt
Max. Height (m)
Building Line
Front setback
Min. Setbacks Rear & Both sides (Each Side)
Tower to Tower Distance
1
2000 to 8000
300
Min. 9
As per AAI norms or As regulated by Fire and Emergency guidelines available as applicable and W.E.I.L.
15.1Applicability:
These provisions shall apply to:
- All new commercial buildings or building complexes having a connected load of 100 kW or more or contract demand of 120 kVA or more.
- All group housing projects, Commercial Buildings institutional buildings, or mixed-use developments with total built-up area ≥ 2,000 sq.m.. and certain categories of buildings such as Public Buildings, Multiplexes, Hospitals, Hotels, and Convention Centres irrespective of their built-up area.
- Any building other than mentioned herein above, if seeking green building incentives-additional FAR, or fast-track approvals under state schemes.
15.2 Compliance with ECSBC:
All buildings covered under Clause 1 herein above shall comply with the provisions of the Energy Conservation Sustainable Building Code ECSBC 2024 as notified by the Bureau of Energy Efficiency (BEE), Government of India, and as may be adopted or amended by the Government of Jammu & Kashmir from time to time.
15.3Minimum Environmental Provisions:
The following minimum green building and sustainability measures shall be mandated:
a) Building Envelope:
• Compliance with ECSBC-specified U-values for walls, roofs, and glazing as per ECSBC climate zone (composite).
• Maximum Window-to-Wall Ratio (WWR) shall not exceed 40%.
• Use of shading devices, reflective roofing, or green roofing.
b)
Lighting and Electrical Systems:
- Use of LED lighting in all common and exterior areas.
- Provision of automatic lighting controls in spaces ≥ 25m² or as defined in ECSBC 2024 whichever is more.
- Sub-metering for major energy-consuming systems.
c) HVAC and Hot Water Systems:
- HVAC systems shall meet minimum energy performance standards and use temperature controls.
- Mandatory solar water heating systems in hotels, hospitals, and hostels.
d) Renewable Energy Integration:
- Provision for rooftop solar photovoltaic system in buildings with built-up area ≥ 2,000 sq.m., covering at least 1% of the connected load.
[Signature]
e) Water Efficiency:
- Use of low-flow plumbing fixtures (flush ≤ 6 L, faucets ≤ 6 L/min).
- Dual plumbing systems where non-potable water is used for flushing or landscaping.
- Mandatory rainwater harvesting structures
f) Construction and Demolition Waste Management:
- Mandatory submission of a construction & demolition waste management plan.
- At least 50% of the generated waste shall be reused or recycled onsite or offsite.
C. Regulations for Housing Colonies (plotted):
I. A group or a group of persons or a co-operative society or firm intending to plot out an estate into more than 4 plots shall give notice in writing to the BPIA which will be accompanied by a layout plan of entire land showing the areas allotted for roads, open spaces, plot and public buildings, the specification of the roads, drains and other infrastructures.
II. RERA approval is mandatory for all plotted housing colonies.
III. Roads, drains, water mains and electric lines required for the colony shall be constructed by the developer at his own cost and no plot shall be eligible for any services and utilities by the govt. and/or Municipal Corporation unless the colony is developed properly and approved by the BPIA, and no building plan shall be considered by the municipality or prescribed authority in any plot of such a colony which has not received the prior approval of the BPIA. Developer in this case will mean the person, co-operative or the firm intending to plot out the land into more than 4 plots.
IV. Land use of the layout plan approved by the BPIA shall not be changed unless with the prior consent of the BPIA.
V. Open spaces allocated for parks, playfields, utility sites/buildings in a colony shall be deemed to have been sold along with the plots as amenity of the colony by the developer to the plot holders of the colony. The development of such open spaces shall be the responsibility of the developer.
VI. No permission shall be accorded for construction of a building in any notified area which shall cause nuisance by way of odour, smoke, noise or disturbance to inhabitants of the locality or be injurious to health of the residents of the buildings or to the inhabitants in the surrounding areas.
VII. Norms for Colonies up to 4.0 Hectare:
Land Distribution
1.
Min. Approach Road
9.0 M
2.
Internal Roads
Width of Means of Access (m)
Length of Means of Access (m) Max
6.0
75
7.5
150
3.
Area under Roads
Min. 10 %
Validity of Third-Party Certificates: Certificates or reports issued by empanelled RTPs s in the prescribed format shall be valid for the purpose of granting Building Permission, Completion or Occupancy Certificates, and may be relied upon as technical evidence in audits, appeals, or dispute resolution.
Government Guidelines:
BPIA may, by order, issue detailed guidelines or Standard Operating Procedures (SOPs) for:
a) Empanelment and monitoring of RTPss,
b) Standard formats of inspection reports and certificates,
c) Integration of RTPss with online system, and
d) Disciplinary mechanism for defaulting agencies.
Clause 2.9.3: Communication of Queries shall be deleted.
Clause 2.9.4 Grant or Refusal of Building Use Permit shall be deleted.
12. Clause 2.14.1 shall be replaced with the following: Responsibilities of owner and Registered Technical Person:
Responsibility of the Owner:
a. Be responsible for ensuring that the building compliances with the Building Byelaws, master plan/zonal development plan.
b. Shall make the application for a Building Permit.
c. As prescribed appoint Registered Technical Person to undertake third-party verification of the structural design and specifications of the proposed building and, to verify and certify that the design and specifications compliance with these Building Byelaws as prescribed.
d. As prescribed, Appoint an Engineer/Architect on Record to certify that the
[Signature]
construction of the building has been undertaken as per detailed design and specifications stipulated by the R.T.P. and the Structural Engineer on Record as per clause 2.19.
e. Submit a Notice of Commencement of Construction, Plinth level inspection, Notices of Progress of Construction, and a Notice of Completion of Construction to the BPIA.
f. Inform the BPIA within 7 working days if for any reason he ceases to be the Owner of the plot for which the Building Permit has been issued or granted, regardless of whether building has commenced or not.
g. Inform the authority within 7 working days if for any reason, any of the Registered Technical Person appointed by him has been relieved of their responsibilities.
h. Ensure that no construction is undertaken during the period that the Building Permit has lapsed or has been revoked. no construction without building permission.
i. The owner or lessee of the plot shall be fully responsible for the correctness of ownership title, authenticity of documents submitted, and adherence to the sanctioned plan and provisions of these bye-laws.
j. The owner shall ensure that the construction is carried out strictly as per the approved building plan and that no unauthorized development, encroachment, or deviation is made during the course of construction.
k. The owner shall not occupy or permit occupation of the building or any part thereof without obtaining a valid Building Use / Occupancy Certificate from the Competent Authority.
The owner shall, during construction, allow access to authorized officers of the BPIA for site inspections and shall comply with directions issued for correction of deviations or violations.
m. The owner shall remain jointly and severally responsible along with the RTP
A
for any structural failure, deviation, or violation from the sanctioned plan, as per the provisions of these bye-laws and the Jammu & Kashmir Development / Municipal Acts.
2. Responsibility of Registered Technical Person (RTP):
a. The Registered Architect / Engineer / Structural Engineer / Supervisor engaged for preparation and supervision of the building plan shall be responsible for ensuring compliance with the Master Plan / Zonal Plan, Unified Building Bye-Laws and Development Control Regulations, and all applicable building standards.
(c) The construction is being carried out in deviation from the sanctioned plan, or in contravention of the Master Plan / Zonal Plan, these Bye-Laws, or any other applicable law; or
(d) The owner or Registered Technical Person (RTP) has violated the conditions of the sanction, or failed to rectify deviations despite due notice.
2. Procedure for Revocation:
(a) Before revoking any building permit, the BPIA shall issue a show-cause notice to the owner and the concerned RTP, specifying the grounds and providing a reasonable opportunity of being heard within a stipulated period.
(b) If, after considering the reply and available evidence, the BPIA is satisfied that the permit was obtained or used in violation of law or bye-laws, an order of revocation shall be issued digitally through the designated online Building permission Portal, clearly stating the reasons.
(c) Upon revocation, all construction activities on the site shall be deemed unauthorized and shall cease immediately.
(d) The Authority may direct removal or demolition of such unauthorized construction at the cost of the owner, as per the provisions of the Jammu & Kashmir Development Act / Municipal Act.
3. Penal Action for Misrepresentation or Unauthorized Construction:
(a) Any owner or RTP found guilty of misrepresentation, falsification of documents, or wilful violation of these bye-laws shall be liable for penal action, including but not limited to:
i. Blacklisting or cancellation of registration of the concerned RTP;
ii. Forfeiture of security deposit and imposition of fine as prescribed by the BPIA;
iii. Initiation of prosecution under relevant provisions of the Jammu & Kashmir Development Act, 1970 or Municipal Acts;
iv. Disconnection of utilities (electricity, water, sewerage) and sealing of premises until compliance or removal of unauthorized work.
4. Restoration of Permit:
Where a building permit has been revoked due to procedural error or inadvertent
Q
discrepancy not amounting to willful misrepresentation, the BPIA may, after due rectification and payment of prescribed fees, restore or revalidate the permit.
5. Record and Transparency:
All revocations, penal orders, and disciplinary actions shall be maintained in a digital register within the designated online Building permission Portal and linked to the profiles of the owner and RTP for future reference and monitoring.
Clause 2.15: Procedure for Building Permission of Residential Use Building shall be deleted.
Clause 2.16: Procedure for Building Permission of Non-Residential Use Building shall be deleted.
Clause 2.17, Timelines for clearance from various agencies as specified in sub clause 2.17, wherein the duration for clearance of NOC as mentioned in Para C, D and E of Table 2-3 as “15/30 days” shall be replaced as “21 days”.
Clause 2.18 shall be replaced with the following:
No Objection Certificates (NOCs) Required for Building Permission:
1. Title Verification:
The No Objection Certificate (NOC) from the Revenue Department shall be mandatory for all plots other than Government colonies and shall be processed only online through the Designated Building Permission Portal of the Housing & Urban Development Department strictly within the stipulated time frame.
2. Fire and Emergency Services:
The NOC from the Fire and Emergency Services Department shall be required for Assembly and Intensive Commercial and Residential Use Buildings, which inter alia include land use categories Group Housing, Commercial and Public semi public or as otherwise notified by the concerned Urban Local Body (ULB) or Urban Local Authority (ULA).
3. Integration of NOCs from Line Departments:
The NOC requirements from all concerned line departments shall be processed only online through the Designated Building Permission Portal of the Housing & Urban Development Department strictly within the stipulated time frame to enable seamless, digital, and time-bound processing of building permission applications.
A Section 2.19 – Registration of Technical Personnel, in sub-clause (b), for the words “Listing Fee” wherever they occur, the words “Registration/Empanelment Fee” shall be substituted, and the following proviso shall be added at the end of the clause:
“Provided that, the Registration Fee for all categories of Registered Technical Persons (RTPs) shall be notified by the Chief Architect, Architects Organization, Jammu and Kashmir or as any other authority as notified by the Housing and Urban Development Department.
For any clarification Standardized Development and Building Regulations, 2023 prepared by BIS may be referred to.
Clause 3.2, for the existing provision shall be deleted:
Clause 3.3, for the existing provision shall be deleted:
Clause 4.1.1, : Right. to inspect construction at any time shall be replaced as under:
√
1. Requirement of Plinth Inspection:
No construction shall proceed beyond plinth level without a Plinth Level Inspection by the BPIA. The inspection is mandatory to verify compliance with the sanctioned plan, setbacks, floor levels, and structural safety parameters.
2. Submission of Request for Inspection:
(a) The owner or Registered Technical Person (RTP) shall submit a Plinth Inspection Request through the designated online Building permission Portal once the plinth work is completed.
(b) The request shall include:
a. Photographs of the plinth from multiple angles and As-built plinth level drawings
b. Certification from the RTP confirming adherence to the sanctioned plan and structural norms.
3. Digital Scheduling and Inspection:
(a) The Competent Authority shall schedule the inspection through the portal and notify the applicant digitally.
(b) Where available, mobile inspection teams may upload real-time observations and approve plinth compliance on the portal.
4. Auto-verification:
The portal shall auto-check plinth level parameters such as height, setbacks, alignment, and footprint against the sanctioned plan using GIS/plan integration. Deviations shall be flagged for manual verification.
5. Approval for Further Construction:
(a) Upon satisfactory inspection and verification, the Competent Authority shall
digitally approve continuation of construction above plinth level via the portal.
(b) If deviations are observed, the portal shall notify the applicant and RTP to rectify discrepancies before proceeding further. Construction beyond plinth without digital approval shall be treated as unauthorized.
6. Record Keeping:
All plinth inspection reports, photographs, and approvals shall be stored digitally in the designated online Building permission Portal and linked to the building permit record for accountability and audit purposes.
22. Clause 4.1.8, shall be replaced with the following:
1/5 of ROW +1/2 of ROW
1/5 of ROW
Side setback Min 3mts. on each side
Minimum 6M all around up to 40 m height. and minimum 9 m all-round above 40 m height.
2.
Above 8000
300
Minimum 6 M all around up to 40 m height. and minimum 9 m all-round above 40m height.
Note:-
图2
I. The Group Housing Scheme shall be subject to Reservation Policy for EWS/LIG Housing for Urban Poor as per J&K Housing, Affordable Housing, Slum Redevelopment and Rehabilitation and Township Policy, 2020.
II. RERA approval mandatory for all Group Housing Schemes.
III. Bye-laws for affordable housing shall be as per J&K Housing, Affordable Housing, Slum Redevelopment and Rehabilitation and Township Policy, 2020.
IV. Maximum Commercial/Public, Semi-public use in Group Housing/Flatted Development shall be 10% of the total site/scheme area.
V. Security room may be allowed at the entrance gate up to a maximum built up area of 30 Sqm (up to 3.5m height) after maintaining the RoW of road and shall be counted as FAR.
VI. Minimum floor height from finished floor for any habitable space shall be 2.75m.
VII. Built up area (Unit Area) of apartment for calculation of ECS shall be excluding common service areas. Any service area within apartment shall be counted in built up area. Balconies and Verandas shall be counted @ 50% in FAR.
VIII. If there are any bends or curves on the approach road within the plot, a sufficient width shall be provided at the curve to enable the fire tenders to turn, the turning circle being at least of 9.0 m radius. Where entry to the plot is through a slip road the gate width shall not be less than 9.0 m for entry of the fire fighting appliances.
IX. The internal access to the building within the plot and open spaces on its all sides shall not be less than 6 m width and the layout for the same shall be done in consultation with Chief Fire Officer, Fire Service and the same shall be reinforced to ensure safety of the fire equipment and capable of taking the weight of Fire Engine, weighing up to 45 tons. The said open space shall be kept free of obstructions and shall be motorable.
X. Main entrances to the premises shall be of 9.0 m width to allow easy access to the fire engine and in no case, it shall measure not less than 6 m. The entrance gate shall fold back against the compound wall of the premises, thus leaving the exterior access way within the plot free for movement of fire
[Figure]
A
service vehicles. If archway is provided over the main entrance the height of the archway shall not be at a height less than 5m.
XI. The catalogue for sale of apartments shall be similar to the basic plan approved by the Authority.
XII. No deviation in the plan shall be allowed once the apartments are sold in part or whole.
XIII. No common areas like corridors, stairs, lifts, lobbies shall be allowed to be sold to a particular person or a group of persons after the apartments are sold in part or whole.
XIV. No apartment holder shall be allowed to have extra rights or common spaces.
XV. Common green spaces shall include all green spaces, children's parks, play grounds, open sports facilities, areas which are of common use of the apartment owners forming part of the sanctioned plan under bye-laws of the Authority.
XVI. Any additional space not counted in the permissible floor space shall also be treated as common areas.
XVII. Designated parking spaces shall be allotted to apartment holders.
XVIII. Height Exemptions
a. Roof tanks and their supports not exceeding 1.0 m in height.
b. Ventilating, air conditioning and lift rooms and similar service equipment.
c. Stair covered with monty not exceeding 3.00 m in height.
d. Chimneys and parapet wall and architectural features not exceeding 1.50 m. in height unless the aggregate area of such structures exceeds 1/3rd of the roof area of the building on which they are erected. All such appurtenant structures shall be camouflaged to achieve streamlined aesthetics.
XIX. Dedicated private green area shall be min. 10% of plot size. This is provided other than setback area and can be provided on podium or terrace.
XX. Passages, turning radius and entry shall be in conformity with fire safety norms.
XXI. No projections shall be allowed in the setback area
XXII. The distance between building blocks shall be such as to mandatorily have min 2hr of direct sunlight in habitable area.
4.
Area under Green
Min. 15%
[Figure]
5.
Residential Area
Max. 60%
6.
Commercial/PSP Area
Max. 15 %
Note: Beyond 4 hectares of area, the Integrated Township as per the provisions laid down in the Jammu and Kashmir Housing, Affordable Housing, Slum Redevelopment and Rehabilitation and Township Policy 2020 shall be applicable. Other norms shall remain same as applicable for Housing colony/Group Housing.
Sub Clause 5.2.1.2, the table No. 5-4 shall be replaced with the following:
Table 5-4The regulations for Commercial use are as under:
S.NO.
Building Use
Plot area (Sq. m)
Existing RoW
Building Line
Max FAR
Height
Minimum setbacks (Meters)
Front
Rear
Side
Side
1.
Single Shop
Up to 100
6 m
1/5th of RoW+ 1/2 of the RoW
210
As per AAI norms or As regulated by Fire and Emergency guidelines available as applicable and W.E.I.L
1/5th of RoW
N
N
N
2.
Shopping Cluster/ Commercial Complex
Above 100 - 750
9 m
300
1/3 of the building height
N
N
3
Shopping Cluster/ Commercial Complex
Above 750
9m
300
1/3 of the building height
Notes:
a. Single Basement within the building envelope shall be allowed as specified in the basement norms. Stilt floors within the building envelope shall be allowed for parking only
b. Double basements if used for parking shall be allowed as specified in the basement norms. Stilt floors within the building envelope shall be allowed.
[Signature]
Special Commercial Buildings
S.No.
Building Use
Plot area (in sq, mts.)
Existing ROW
Building Line
Max. FAR
Height
Min. setbacks
Front
Rear
Side
Side
4
Cinemas/Cineplex
Min. 1000
12 m
1/3rd of RoW+ 1⁄2 of the RoW
400
As per AAI norms or As regulated by Fire and Emergency guidelines available as applicable and W.E.I.L.
1/3rd of RoW
1/3rd of the building height
Note:- Three basements if used for parking shall be allowed as specified in the basement norms. Stilt floors within the building envelope shall be allowed. Canteen/food court up to 15% of FAR shall be allowed.
5
Hotel
Min. 1000
12 m
400
1/3rd of the building height
Note:-5% of permissible FAR for party hall and 3% permissible FAR for Conference hall shall be allowed. For Conference halls/party halls/bars/restaurants etc. (Excluding entrance hotel lobby/atrium) min parking @ 1.5 ECS for 10 Sqm shall be provided. Double basements if used for parking shall be allowed as specified in the basement norms. Stilt floors within the building envelope shall be allowed.
6
Mall cum Multiplex
Min. 2000
12 m
400
1/2nd of RoW
1/3rd of the building height
Note:- For halls/party halls min parking @ 1.5 ECS for 10 Sqm shall be provided. Three level basements if used for parking shall be allowed as specified in the basement norms. Stilt floors within the building envelope shall be allowed.
7
Janjghar/ Community Center/ Banquet Hall
Min. 1000 Sq. M
12 mts.
100
1/3rd of RoW
1/3rd of the building height
Note:- Double basements shall be allowed. Basements should be allowed for parking only. In case of sloping roof, no activity shall be allowed in the attic space. Security room may be allowed at the entrance gate up to a maximum built up area of 15 Sqm (up to 3.5 M height) after maintaining the RoW of road and shall be included in FAR. Parking shall not be allowed in proposed RoW of roads. Bore-wells and power-driven water pumps shall not be allowed in construction sites or in any building without license and proper permission from the competent authorities.
8
Ware Housing, Storage Vegetables & Fruit Mandis
Min. 1250 0
12 m
300
1/2nd of RoW
1/3rd of the building height
9
Multi-Level Parking
No limit
6 m
No limit
1/3rd of RoW
1/3rd of the building height
Note:- Terrace/Roof Top Parking shall be allowed with proper protection to the satisfaction of concerned Authority. In order to compensate the cost of Multi-Level Parking, a maximum 25% of Gross Permissible Floor Area may be utilized as Commercial/Office space. Maximum FAR proposed for commercial spaces shall be 100 (excluding parking areas). In addition to requisite parking space required for commercial developed within the Multi-Level Parking complex (@ 3 ECS/100 Sq. m). Three times additional space for parking components shall be provided. Three
basements shall be allowed for parking as specified in the basement norms. Maximum height shall be restricted to permissible height of the land use in which the plot falls. In case of Government comprehensive schemes, development controls including height shall be as pre-approved scheme.
10
Tourist Huts
Min. 750
9m
200
1/3rd of the building height
11
Integrated Tourist Resort *
Min 2000
12 m
400
1/3rd of the building height
*Integrated Tourist Resort: Premises having variety of activities and services such as hotels, huts, restaurants, banquet hall, swimming pools, Cafeteria, gymnasium, conference halls and other recreational activities for accommodating tourists and such other activities/services as forming integral part of any hotel or building meant for tourism. The parking space shall be exclusive of requisite setbacks. Minimum 20% of plot area shall be developed as dedicated green space.
The regulations for Industrial use in terms of Space/Plot area, Existing ROW, FAR & Setback/s shall be as under:
• Reduction of these categories to Industrial Estates Use only.
- Industries and Commerce Department shall formulate its own Development Control Regulation applicable for Industrial Estates and other designated land uses.
- The guidelines/ Development Control Regulations for various activities as prescribed in policy of Industry and Commerce Department in vogue shall be applicable.
知
Table No. 5-4 : Regulations for Public & Semi-Public activities
As per AAI norms or As regulated by Fire and Emergency guidelines available as applicable and W.E.I.L
1/5th of ROW
3.0 m
3.0 m
3.0 m
Education and Research
13.
Pre-Nursery/Creches
As per Residential use Norms.Pre-Primary Schools/ Nursery Schools/ Montessori Schools/Creche, Play Schools are permissible in residential use.
Plot Area (Sq.m)
Min.Public Open Space+ (%)
FAR
RoW
Height (mts)
Front (mts)
Rear (mts)
Side (mts)
Side (mts)
14.
Nursery School
500
10
100
9m
As per AAI norms or As regulated by Fire and Emergency guidelines available as applicable and W.E.I.L
0
3.0
3.0
3.0
Note: Stilt floors within the building envelope shall be allowed.Basements shall not be allowed.
[Signature]
15
Primary School
1000
10
120
9.0
As per AAI norms or As regulated by Fire and Emergency guidelines available as applicable and W.E.I.L
0
3.0
3.0
3.0
Note: Stilt floors within the building envelope shall be allowed. Single basement within the building envelope shall be allowed for parking as specified in the basement norms.
16
Middle School
2000
10
120
9.0
As per AAI norms or As regulated by Fire and Emergency guidelines available as applicable and W.E.I.L
0
3.0
3.0
3.0
Note: Stilt floors within the building envelope shall be allowed. Single basement within the building envelope shall be allowed for parking as specified in the basement norms.
17
High/ Higher Secondary School
3000
20
150
9.0
As per AAI norms or As regulated by Fire and Emergency guidelines available as applicable and W.E.I.L
0
4.0
4.0
4.0
Note: Stilt floors within the building envelope shall be allowed. Single basement within the building envelope shall be allowed for parking as specified in the basement norms.
18
College
5000
10
300
12.0
As per AAI norms or As regulated by Fire and Emergency guidelines available as applicable and W.E.I.L
0
3.0
3.0
3.0
图2
Note: Stilt floors within the building envelope shall be allowed. Single basement within the building envelope shall be allowed for parking as specified in the basement norms.
19
Educatio nal and Research Centre/Universiti es
7500
-
400
12.0
As per AAI norms or As regulated by Fire and Emergency guidelines available as applicable and W.E.I.L
0
6.0
6.0
6.0
Parks and Landscape Areas (min. 20% public green of the total land area). Suitable landscape plan to be prepared for this area.
Note Stilt floors within the building envelope shall be allowed. Double basement within the building envelope shall be allowed for parking as specified in the basement norms.
HEALTH
S.No.
Use
Plot
FA R
B.L
RO W
Height
F
R
S
S
20
Hospital
1000
400
10 (for plots upto 20 00)
NS
12.0
As per AAI norms or As regulated by Fire and Emergency guidelines available as applicable and W.E.I.L
0
As per fire safety norms
20 (for plots above 20 00)
NS
Notes:a. Maximum 10% Ground coverage shall be allowed for providing atrium and shall be free from FAR. In case, additional ground coverage for atrium is utilized 25% of the utilized ground coverage shall be counted toward FAR. If atrium has free 24hr public passage, then atrium shall be counted for open space. Common areas such as waiting halls, reception and fire staircases shall be allowed free from FAR. Service floor of height. 1.8m shall not be counted in FAR. The setbacks regulations are subject to fire safety norms.b. Multi-Level Parking shall be Permissible to the extent of building Envelope lines, free from FAR (upto 50%) to facilitate ample parking in spaces, subject to structural safety. This parking shall have public entry as well and shall be operational 24hrs. 50% of total parking spaces shall be common public parking. Ground level vehicular parking shall not be permissible in the plot, only bicycle parking and vehicular drop-off facilities are permitted.
21
Health Centre/Nursing Home
1000
400
NS
9.0
As per AAI norms or As regulated by Fire and Emergency guidelines available as applicable and W.E.I.L
0
3.0
3.0
3.0
Notes:a. Multilevel basements within the building envelope shall be allowed as specified in the basement norms. Basements/Stilt floors if used for parking shall not be counted in FAR.b. For all other parameters, spatial norms of the concerned department shall apply.c. Environment clearances shall be made mandatory considering that bio-wastes are generated. Environment clearances are mandatory as per the prevailing regulations related to the environment.d. Zero discharge for sewerage shall be enforced at the cost of the promoters and post treatment water can be used by premises for its needs of horticulture, flushing, coolant tower, washing or disposal to other construction sites. These issues concerned the local bodies and can be dealt accordingly as per existing regulations as the time of sanctioning the plan.
22
Radio Diagnostic Centre/Micro biological / Pathological Laboratories
500
NS
10
400
9.0
As per AAI norms or As regulated by Fire and Emergency guidelines available as applicable and W.E.I.L
0
1/3rd of the building height
Note: Stilt floors within the building envelope shall be allowed. Single basement within the building envelope shall be allowed for parking as specified in the basement norms.
Petrol Pumps:
S.No.
Use
Plot Area
FAR
Row
Building line
Setbacks
Front
Rear
Side
Side
23
Filling Station
Plot Size as allotted by concerned oil companies OR Ministry of Petroleum and Natural Gas OR MoRTH Guidelines whichever is applicable
100
9 m
1/5th of RoW+ 1/2 of ROW
1/5th of RoW
N
N
N
Filling Cum Service Station
200
12m
N
N
N
Compressed Natural Gas (CNG) Mother Station
200
12m
N
N
N
Note: Minimum distance from junction/intersection of two or more roads shall be 300 m. Distance from nearest residential house/School/Health Centre shall be 30 m from the nearest plot edge. Minimum Distance between filling stations shall be 300 m.
Q
29. Clause 5.2.4.5 "Premium on Parking", for the existing provision shall be deleted:
30. After chapter-14: General References, a new Chapter 15 shall be inserted as “Green building Norms and energy Efficiency” as under:-
Green Building Norms and Energy Efficiency
15.6Terms and conditions for above mentioned incentives ECSBC/other rating systems:
The incentives shall be subject to following terms and conditions:
A
I. Grant of incentive of additional FAR (Floor Area Ratio) shall be provisional till final completion certificate is obtained by the applicant within the prescribed period.
II. Grant of incentive of additional FAR shall not be in contravention of any byelaws/rules.
III. Grant of incentive of property tax /additional FAR shall be reviewed every 5 years. In case of non-compliance of the above conditions or upon failure to obtain/retain the minimum rating prescribed above, a penalty equivalent to 5 times the collector rate of land proportional to the 5% additional FAR shall be imposed for the buildings availing additional
IV. In case of buildings obtaining more than one green building certifications from ECSBC and other rating systems, then only one of the incentives at a time shall be applicable.
15.4Compliance Methods:
Compliance with the above may be demonstrated through:
- The Competent Authority (ULB/Development Authority/ TPO / JKECSBC/JKPDD) may issue a Green Performance Compliance Certificate based on ENS/ECSBC and such certificate shall be treated as equivalent to IGBC/GRIHA/LEED/EDGE for the purpose of incentives
OR
- Third-party certification (e.g., GRIHA, IGBC, LEED) achieving a minimum 3-star rating, in lieu of separate compliance documentation.
- The concerned Authority shall levy a Certification Fee for scrutiny and issuance of the Green/ENS Compliance Certificatein case of 1.3 (a) herein above. The certification fee for scrutiny and issuanceshall be uniform at UT J&K level and notified by the Housing and Urban Development Department, J&K time to time.
15.5 Incentives:
Projects achieving higher green standards (e.g., GRIHA 3-star,4-star and 5-star or IGBC Silver, Gold and Platinum) shall be eligible for additional floor area and incentives as per following matrix:
Rating
Incentives
IGBC
GRIHA
Additional Free FAR / FSI (%)
CLU Fee Rebate
Building Permit Fee Rebate
Annual Property Tax Rebate (if applicable)
Silver
3 star
+7%
1%
10%
Up to 5%
Gold
4 Star
+10%
1.5%
15%
Up to 7%
Platinum
5 Star
+15% (cap)
2%
20%
Up to 8%
15.7Optional Eco Niwas Samhita (ENS) Compliance for Residential Buildings (individual):
a) Adoption of Eco Niwas Samhita (ENS) – Part I: Building Envelope shall be optional for all residential buildings, including standalone houses, apartments, flatted development, and group housing schemes.
b) Residential buildings that voluntarily adopt and comply with ENS shall be eligible for incentives as under:
c) Incentives Linked to Rating Levels (Residential Buildings)
Green Level
Incentive
Remarks
FAR
Building Permit Fee Rebate
Annual Property Tax Rebate (if applicable)
Level-0 (ENS Only)
Up to 3% additional FAR
10%
Up to 5%
For ENS-compliant envelope
Level-1 (Silver / 3-Star)
Up to 5% additional FAR
15%
Up to 7%
Entry-level certification
Level-2 (Gold / 4-Star)
Up to 7% additional FAR
20%
Up to 8%
High performance
Level-3 (Platinum / 5-Star)
Up to 10% additional FAR
25%
Up to 10%
Maximum incentive
Note:
- FAR incentives are optional and granted only upon submission of final certification.
• Structural safety and planning norms must not be compromised.