10.18 The length of the major waterways passing through the City and their total length in CMA is given in Table No. 10.02 and are presented in sheet No.10.05.
Table No.10.02: Length of Major Waterways in CMA (Length in Km)
Waterway
City
CMA
River Cooum
18.0
40.0
River Adyar
15.0
24.0
North Buckingham Canal
7.1
17.1
Central Buckingham Canal
7.2
7.2
South Buckingham Canal
4.2
16.1
Otteri Nullah
10.2
10.2
Captain Cotton Canal
2.9
4.0
Kosasthalaiyar
-
16.0
Mambalam Drain
9.4
9.4
Kodungaiyur Drain
6.9
6.9
Virugambakkam-Arumbakkam Drain
6.9
6.9
Total Length
23.2
157.8
In this background this chapter furnishes a gist of various studies made and completed and on going programs to alleviate flooding in the CMA.
Chapter XMacro Drainage System in CMA
Introduction:
CMA lies along the east coast of Southern India and is traversed by three major rivers namely Kosasthalaiyar River, Cooum River and Adyar River. The climate of the region is dominated by the monsoons, which are caused by thermal contrast between land and sea. Monsoon climates are characterised by clearly marked seasons with specific types of wind and weather. The South West monsoon dominates weather patterns in Tamilnadu from July –September and is characterised by periods of sultry wet weather. Rain shadow effects limit rainfall in the east coast in Tamilnadu and it is light or intermittent during this season. This period is followed by North-East Monsoon, which brings cool cloudy weather, relatively free of rain over most of the monsoondominated land (India). The exception is South-East-India including Tamilnadu where about 78% of the annual rainfall occurs at this time. The start of the heavy rains usually falls in October lasting up to December. Most of the rainfall is associated with clear synoptic systems of depressions and cyclones with night time rainfall most common. In CMA between October and December most of the rainfall occurs and it is rare between January and April.
10.02 River Nagari which has a large catchment area in the Chittoor District (Andhra Pradesh) region and the Nandi River, which has catchment area in the Vellore District, join near Kanakamma Chattiram and enter Poondi Reservoir. Kosasthalaiyar River, which has its origin near Kaveripakkam and has catchment area in North Arcot District, has a branch near Kesavaram Anicut and flows to the city as Cooum River and the main Kosasthalaiyar river flows to Poondi reservoir. Poondi Regulator was constructed in 1943. From Poondi reservoir, Kosasthalaiyar River flows through the Thiruvallur District, enters CMA, and joins the Sea at Ennore.
10.03 Cooum River from the Kesavaram Anicut flows through the Kancheepuram District enters CMA and finally reaches Sea near Fort St.George.
10.04 Adyar River having its catchment area in the Kancheepuram District and originating from the Pillapakkam Tank Group and Kavanur Tank Group flows through the CMA enters the city and reaches Sea near Adyar area of the city.
10.05 Sholavaram Tank, Red Hills Tank and Chembarambakkam Tank are the major tanks in the CMA. Sholavaram Tank is the secondary storage tank receiving water from the Poondi Reservoir via Poondi Feeder Canal to supply Red Hills Tank. Red Hills Tank
is the main source of water supply to the Chennai City and during storm events water is released to Red Hills Surplus Channel, which enters the Kosasthalaiyar River and discharges into the sea. Its maximum storage capacity is 3285 Mft3 (93 Mm3).
10.06 Chembarambakkam Tank has recently been developed as one of the sources for water supply to Chennai City and has maximum storage capacity of 103Mft3.
10.07 Kesavaram Anicut and regulator which is located in the uppermost catchment of the Poondi reservoir controls the discharge from upper catchment entering Poondi reservoir and during storm events the regulator gates can be opened to discharge into Cooum when Poondi reservoir is full.
10.08 Korattur Anicut and regulator control the discharge in the Cooum and direct the flow to the Chembarambakkam reservoir. When there is flow in the Cooum river and the Chembarambakkam Lake is not at full capacity, then the regulator gates are opened to supply water to the reservoir through the link channel.
10.09 Tamarapakkam Anicut located across Kosasthalaiyar River in the downstream of Poondi reservoir controls excess discharge in the Kosasthalaiyar. If Sholavaram is not at its full capacity, then the gates are opened to divert the excess water along the supply channel to Sholavaram. Vallur Anicut is a small check dam constructed near Minjur across the Kosasthalaiyar River to control water levels and feed irrigation channels in the area.
10.10 Like any region in southern India with agricultural lands, CMA also has a network of lakes, canals and channels within its boundary. There are about 320 tanks /lakes that are earlier used as water source for irrigation and now serve as flood accommodators. Apart from these lakes there are a large number of ponds in CMA.
10.11 Buckingham Canal is a man-made canal, which was constructed during the year 1806. It originates at the place called Bedhakanjam in Andhra Pradesh and runs along the area very close to the east coast, enters CMA at Athipattu village, passes through the Chennai City and leaves CMA at Semmencheri village, and it finally connects to Ongur River at Yedayanthittu Kaliveli near Cheyyar. Its total length is 418 km and in CMA its length is 40km. It runs in the north south direction and connects all the major three rivers in CMA. It was dug for the purpose of navigation and transport of goods and also to accommodate flood. But within CMA for various reasons it now serves as flood accommodator only.
10.12 Otteri Nullah is a channel to accommodate flood, which originates from a place called Otteri near Padi, flows through the city at Anna Nagar, Kilpauk, Purasawalkam, and Perambur and joins Buckingham Canal near Basin Bridge.
Source: CMDA
10.13 Virugambakkam-Arumbakkam Drain originates near Oragadam passes through Virugambakkam-Arumbakkam area of the city and joins into Cooum River.
10.14 Mambalam Drain is also a flood accommodator, which originates from Mambalam area passes through T.Nagar, Nandanam and joins Adyar River.
10.15 Captain Cotton Canal originates from the Vyasarpadi area of the city and joins Buckingham Canal near Tondiarpet.
10.16 Velachery Drain is a flood accommodator originates from Velachery tank and joins Pallikkaranai Swamp.
10.17 The agencies responsible for management of storm water drainage in CMA are presented in Table No.10.01.
Table No. 10.01: Agencies responsible for Management of Storm Water
Agency
Responsibility
Chennai Metropolitan Development
Project packaging and management,
Authority (CMDA)
monitoring and co-ordination
Public Works Department (PWD)
Plan, design and implementation of macro drainage works
Chennai Municipal Corporation (CMC)
Plan, design and implementation of micro drainage works
Tamil Nadu Slum Clearance Board
Formulation and implementation of
TNSCB
rehabilitation and resettlement package
Source: Government Records
Floodings in the past:
10.19 Chennai City and its environs are very flat with contours ranging from 2m to 10m above MSL, with very few isolated hillocks in the south west near St.Thomas Mount, Pallavaram and Tambaram. Cooum and Adyar Rivers play a major role during floods. River Cooum collects surplus from about 75 tanks in its catchment within CMA and Adyar River collects surplus from about 450 tanks in its catchment, apart from overflows from the large Chembarambakkam Tank. The flood discharge of Adyar River is almost 3 times that of the Cooum River.
Mean Annual Rainfall in CMA is about 120 cm. The mean rainy days are about 52 days.
10.20 The siting of the Madras in the 17th Century near the confluence of the river Cooum with the sea had influenced its expansion in the bed and the ayacut lands of tanks in its upstream.
10.21 Mylapore tank bed and nearby tanks viz. Nungambakkam, Kodambakkam, Taramani, Vyasarpadi, etc were converted into settlement areas to meet the housing and other requirements of the expanding city. To make the problem more complicated Govt. in order to provide work to people during the famine in 19th century had constructed the ‘B’ Canal along the coast. This was mainly to provide waterway for navigation and it had brought about major interference with the drainage courses of the City as all the drainage courses which were otherwise falling directly into the sea, got intercepted by this canal and rendered segments of the drainage courses beyond the Buckingham canal obsolete and obliterated by the urban development. The impact of the problem was not felt very much earlier, as the habitations were thin and the development pace was slow.
10.22 The last century records have shown that there were several catastrophic flooding in Chennai in 1943, 1976, 1985, 2002 and 2005 caused by heavy rain associated with cyclonic activity. These events of catastrophic flooding were found to be attributable to failure of the major rivers and other drainage systems. Flooding of less catastrophic nature occurs regularly in low-lying areas of the city and its suburbs because of inadequacy or inoperativeness of the local drainage infrastructure.
10.23 The floods in 1943 were historic and damaged Cooum river very badly. Based on the Er.A.R.Venkatachary’s report the Govt. had improved the Cooum river and provided a sand pump at the river mouth for removal of sand bar.
Er. Sivalingam Committee
10.24 In 1976, there was catastrophic flooding in Chennai and this time it was the turn of the Adyar river. Er.P.Sivalingam Committee had given it’s recommendations for prevention of further damages from floods and recommended schemes worth about Rs.12 Crores to be implemented then under priority and schemes worth Rs.10 Crores in the long run (at the 1970’s rates).
10.25 CMDA invited Mr.J.H.Kop, a drainage expert from World Bank who had studied the flood problems and given recommendations in his report. He was endorsing the remedies suggested in the above said previous reports and recommended to CMDA to establish a Task Force (Nucleus Cell) to study the schemes of the various departments and to draw up a programme giving the value of the component works and giving priorities between them so that benefits could be realised within a short time.
Nucleus Cell in the CMDA :
10.26 The Govt. of Tamilnadu had ordered for constitution of Nucleus Cell in CMDA in 1979. The Nucleus Cell had submitted its report in 1980. Following are the main recommendations of the cell:
(i) Considering the urban development already occurred, the surplus course of the Vyasarpadi area known as Captain Cotton Canal could be improved to carry only 2,660 cusecs with difficulty due to lack of space and drain into North Buckingham Canal.
(ii) Some of the surplus from the higher tanks in the area should be diverted into Cooum (i.e. Ambattur tank surplus into Cooum River via Mogappair tank; Korattur tank diverted into Madhavaram tank; Madhavaram tank diverted northwards into Redhills surplus course).
(iii) After the above diversions, Captain Cotton Canal designed for 2,660 cusecs would be sufficient to take care of the flood quantity of 2,360 cusecs in all seasons and proved to be permanent advantage for the Vyasarpadi area.
(iv) To remove the difficulty of discharge of floods a second arm across the Manali-Tondiarpet Road through a causeway has to be constructed for the Captain Cotton Canal to discharge 1,500 cusecs into the ‘B'canal. Even then, the ‘B’ Canal could not be in a position to accommodate the flood and discharge into the sea and hence to realize the benefits of the improvements to Captain Cotton Canal a short cut canal to the sea in Thiruvottiyur area has to be constructed.
(v) To prevent flooding of the Manali area and in Kosasthalaiyar river the Kosasasthalaiyar riverbanks have to be strengthened by borrowing the shoals inside the river as far as possible.
(vi) Otteri nullah has its southern watershed starting from Cooum river itself and have all spills from the river enters into the nullah. The main cause for the floods in the nullah was the absence of banks for Cooum river. If this is taken care of, the discharge from nullah could be confined and disposed off after effecting improvements to the nullah.
(vii) In respect of the Cooum river flow, strengthening of the banks at certain stretches had to be made apart from repairing and strengthening of the Bangaru Channel. Thirumangalam causeway, Naduvakkarai causeway and Chetpet causeway, which were all obstructing the flow, should be removed. The old arch bridges, which were causing afflexes of more than 0.37m, had to be replaced in the first phase by a single span bridge (Aminjikarai bridge, Andrews bridge, Law’s bridge and Wellington bridge) in the first phase and College road bridge, C-in-C Road bridge in the second phase.
(viii) It was essential to think measures to divert a portion of Cooum flood discharges into neighbouring Kosasthalaiyar basin (Poondi reservoir) as already formulated by Er.A.R.Venkatachary's in 1943. Flood waters from Eagattur area to be taken in the Northwesterly direction reaching Thirupachur Odai and then to the Poondi reservoir by constructing a diversion channel.
(ix) Cooum River collects surplus from 75 tanks under Cooum Tank Group. All these tanks drain ultimately to Cooum tank from which the surplus reaches Cooum River just above Satharai Causeway. Tanks can be made to absorb and mitigate flood by judicious regulation. Flood outflow from large tanks could also be brought and drain in such a manner they not only absorb the flood but also anticipate them and deplete the tank in advance such that the outflow is kept at moderate level over a long period. Flood absorption capacity of the tanks may be improved by lowering the full tank level or by converting the surplus weir into a ‘calingulah’.
(x) North Buckingham Canal had been improved and linked between Ennore South lock and Cooum in fall for a distance of 10 miles in 1973-74. In Thiruvottiyur region, it collects the drainages from Sathangadu tanks and Kodungaiyur tank. In Tondiarpet region, it collects drainages from
Vyasarpadi group of tanks. In Vyasarpadi area it is a flood bank of Otteri nullah. The entire city gets inflow through the ‘B’ Canal and it is a main drain of the city during monsoon. The floodwater in the canal flows southward into a Cooum river and northwards in Kosasthalaiyar river as much as the gradient permits. The stretch of the canal needs to be desilted and the floodgates of the Ennore South lock and Adyar north lock had to be got repaired.
(xi) The vent-ways were very small at Central Station Bridge and all bridges north of Tondiarpet and hence it took nearly 5 to 6 days for the accumulated flood in this region for the canal to drain. From the lagoon area a additional canal on the west of North Buckingham Canal had to be dug and also a short cut canal taking off from the 5/0 mileage from the eastern bank of the North Buckingham Canal and joining the sea near Thiruvottiyur had to be dug.
(xii) Earlier the Virugambakkam drain was flowing over a distance of 6.5 kms. and falling into Nungambakkam tank from which with a surplus entered into Cooum and Adyar rivers. Now, the entire course completely lost because of the urban development that had occurred in the 2 km stretch and the balance 4.5 kms. stretch was available. The course of the Koyambedu drain was also obliterated. The entire surplus was flowing towards north enter into narrow Arumbakkam drain and reaches Cooum river. In 1976, the submersion went up to the rooftop of some of the buildings and breached the causeway across Nelson Manikkam Road. Koyambedu surplus can be diverted northward into the Cooum directly for not only reducing the discharge into the Virugambakkam drain but also improving the chances of damage of the Koyambedu area, which requires the assured means of quick drainage. The Virugambakkam-Arumbakkam drain has to be improved.
(xiii) Surplus from Valasarawakkam to be intercepted by a drain proposed to be excavated from Arcot Road such that the surplus reach Ramapuram tank, from there it drains to Adyar river. Missing links in the drainage system to drain floodwaters from KK Nagar, Ashok Nagar and Jaffarkhanpet area have to be formed by acquiring lands to discharge floodwater to Adyar River.
(xiv) Two new tanks just above the Chembarambakkam tank had to be constructed to capture 1570 Mft3 of flood.
(xv) Adyar river has two arms. The northern arm comes from Chembarambakkam basin, joins with the southern arm coming from Guduvancheri, and joins at Tiruneermalai. In 1976, floods in the Adyar river were the worst ever
experience. For containing the flood and reducing the submersion to the minimum extent, flood banks have to be put up all along the banks of the river. Two causeways at Kathipara and Jaffarkhanpet had to be replaced by all weather bridge as a long-term measure.
(xvi) Masonry weir built long ago at a distance of 300m below the Maraimalai Adigal Bridge obstructing the normal flow and causing a pond for dhobis to wash clothes had to be removed.
(xvii) Mambalam drain is flowing at the heel of the erstwhile Mylapore tank. Kodambakkam High Road and the Mount road between Gemini and Nandanam were the tank bunds of the Mylapore tank. The drain starts from Prakasa Road flows in the T.Nagar and CIT Colony area crosses the Mount road and reaches Adyar near Teacher’s college. Improvements to these drains had to be carried out.
(xviii) Pumps must be permanently installed in the Kotturpuram area to drain floodwater since Adyar HFL is higher than the area.
(xix) Veeranam pipe crossing, which had been laid above the riverbed and below the MFL, was a potential source of scour in the Adyar river and it had to be dismantled and re-laid below the riverbed.
(xx) Kapalithottam, a slum, situated on the north of Greenways Road was a lowlying area originally connected the Adyar Backwaters. This area needs to be drained only by means of underground drainage system.
(xxi) It was possible to transfer 10,000-15,000 Cusecs from Adyar River into Covelong Valley by digging diversion channel either from a pond near Perungalathur or from a reach above Tambaram.
(xxii) Though South Buckingham Canal by itself experience high flood levels during monsoon, rain from local precipitation, it is not a flood carrier. The areas south of Adyar basin inside Madras City drain into the South Buckingham Canal and hence the problems in these areas were grouped under this basin. The flood from the developed area of Nangnallur, Velachery and Tiruvanmiyur normally travel southwards and get into the Pallikkaranai Lagoon, which gets drained by the river Covelong.
(xxiii) FTL of the Velachery Tank to be lowered by 1.2m and a new surplus course had to be provided.
(xxiv) Adambakkam drainage scheme had to be implemented reforming the old drains leading to the Adambakkam Tanks and cutting new drains to form the missing links to avoid flooding in the residential area of Nangnallur, Adambakkam, etc.
(xxv) In the Madras city, there were only major drains (Macro level) and hence the city had necessarily got to have internal drains connecting various parts of the City with the macro drains. Regarding the internal drains the city can be divided into the following reaches:
a) Coastal belt draining into sea directly
b) North Madras belt draining mainly into North Buckingham Canal for drainage relief
c) Hinterland between Cooum and Adyar river draining into Cooum and Adyar rivers
d) Southern area draining mainly into South Buckingham Canal
(xxvi) The Macro Drains and internal drains are mutually complementary and both are important. The master plan evolved by the Madras Corporation for internal drainage system has to be implemented fully.
Drainage Master Plan
(v) The Master Plan recommended by the consultant comprised a number of components:
• Structural works for major flood alleviation and for rehabilitation of the urban storm water system;
• Non-structural measures required to support these investments;
• Capacity building, with particular emphasis on system maintenance and master plan implementation;
• Further studies required to progress the plan; and
• Monitoring and evaluation requirements.
(vi) As far as the Master Plan is concerned, the proposed scheme at Pallikkaranai has been treated as committed expenditure, as government has already decided it should be the priority for implementation to aid economic development in the area.
(vii) A phased programme for implementation of the Plan has been developed, with consideration being given to financial and economic constraints, implementation capacity, operation and maintenance requirements, lead times for project preparation and interdependence of projects.
(viii) The structural measures identified were given below:
Table No: 10.03: Structural Measures
Sl. No.
Structural Works
Cost (Rs. in Million)
1
Pallikkaranai Scheme
160
2
Flood defences and channel improvement on the Cooum
348
3
Flood defences and channel improvement on the Buckingham Canal
96
4
Flood defences and channel improvement on the Otteri Nullah
125
5
Flood defences and channel improvement on the Captain Cotton Canal
20
6
Flood defences and channel improvement on the Madhavaram Surplus Channel
10
7
Flood defences and channel improvement on the Red Hills Surplus Channel
215
8
Flood defences on the south side of the Kosasthalaiyar
50
9
Manali Township drainage and flood protection
40
10
Urban storm water rehabilitation and repairs
35
(ix) Non-structural measures recommended were:
a) Designated floodways on the north side of the Kosasthalaiyar with associated planning controls and flood warning/evacuation procedures
b) Design guidelines for drainage systems
c) Planning and regulatory controls to prevent development in old tank beds unless adequate flood defence measures are in place
d) Planning and regulatory controls to prevent encroachment of squatter settlements in old tank beds and watercourses
e) Provision of good facilities (vehicles, communications) for flood emergency management
f) Public education (e.g. to prevent solid waste dumping in urban drains)
g) Flood risk mapping
(x) A unitary authority should be responsible for the drainage system within the City area and it should be Chennai Municipal Corporation. The lead agencies PWD, and Chennai Corporation are responsible for the general dayto-day management of the system. The authority responsible for the drainage and flood control should be required to meet a number of management objectives, principally.
(xi) In respect of operation and maintenance regular inspection has to be carried out and routine and periodic maintenance involving desilting, embankment regarding, weed/bush clearing, vermin control, clearance of rubbish/debris, etc., had to be carried out according to a regular programme. The study also identified in outline a number of studies including environmental impact assessment, flood risk mapping, etc.,
(xii) The drainage study for Pallikkaranai was included as part of the MMFR/SWD master plan study. The aim of the study is to identify ways of providing protection to an area about 30 sq.km. lying in and around Pallikkaranai. The area was earmarked for development and the development was to be promoted by number of government and private bodies then. For the purpose of the study the area was referred as Pallikkaranai Drainage Area (PDA). The aim of the project was to protect an area of approximately 30 sq.km. from flooding. It could be achieved by a diversion of substantial portion of run off from upstream catchments along a cut off drain linking the existing surplus channel close to a village called Karanai with the Kovalam Backwaters. Northern boundaries of Pallikkaranai Drainage Area cuts off the centre of the existing swamp area at Pallikkaranai. The area to the north will continue to be subject to inundation as run-off enters the area from north and west. East west flood protection bund protects this side of PDA. In order to provide internal drainage to the PDA two pumping stations have to be located in the East-west flood protection bund to lift the water over the bund. A balancing pond is also to be located near the pumping station. However, protection to the area is to be provided by three interceptor drains, which carry overland flows from local catchment around the boundary of the PDA. An arterial drain has to be constructed along the centre of the PDA,
which will pick up drainage flows within the area. Details of the proposal are given in the sheets annexed.
MMFR / SWD Master Plan Study
10.27 Subsequently CMDA had engaged the services of the consultant M/s Mott MacDonald International, UK, to conduct the study titled 'Madras Metro Flood Relief/Storm Water Drainage Master Plan Study ' in 1992-93. The main objective of the study was to bring together the previous studies carried to assess the problem of flooding in Chennai and to identify using modern hydrological and hydraulic modeling techniques/measures to alleviate flooding in the North of the City.
10.28 The study area comprised two parts, (1) 90 sq.km strip north of the river Cooum and (2) 30 sq.km area south of the City named as Pallikkaranai. Both the Macro Drainage Systems (Rivers, Tanks, and Surplus Channels) and the micro Drainage System (Urban Storm Water Drains) had been examined.
10.29 An extensive data collection exercise had been undertaken by the Consultant involving acquiring and processing of data relating to meteorological, hydrological, tidal conditions, weather, topography, land use, existing macro and micro drainage systems, river basin control structures, floods etc. Hydrological catchment models to simulate runoff from rainfall and computational hydraulic river models (HYDRO) to simulate the built-up of flow and its routing to the Macro Drainage System to Sea were developed and calibrated. With regard to urban storm water system, complete drain inventory
have been prepared and stored in a database. A review of the capacity of the whole micro drainage system within the study area had been made using MIDUSS (Microcomputer Interactive Design of Urban Storm water Systems) urban storm water drainage analysis program.
10.30 The range of options examined included upstream storage (to be implemented under Krishna Water supply scheme), diversion of flood flows into tanks, canals, channel resection, structural improvements (including outfalls), provision of short cut canal between the Buckingham canal and the sea, formalisation of flood path and provision of flood defences (walls, banks, etc.). For the Macro System 17 principle options had been identified with the number of variants in each of this considering about 40 possible interventions by using a qualitative screening process. Some of these options were eliminated and 20 options examined in depth using the models. The following are the results of the analysis:
(i) The storage and diversion schemes in the upper catchments were generally found to have little impact on flood levels in the downstream coastal reaches of the system where flooding occurs. In the Kosasthalaiyar system, this was because of the major over bank spillage to the north in the middle reaches at Minjur: the effect of storage and diversion was found to lower the amount of spillage at this point, but to have only a small effect on water levels further down the system. In the Cooum system, flows from the upper catchment do not peak at the same time as flows from the middle and lower catchments. Thus, while the diversion of flows in the upper catchment reduces the volume of water, it does not affect the maximum water levels. The exception to this was an option to divert water from the middle reaches of the Cooum to the Red Hills Tank. This was found to have a positive impact on over bank spillage in the city, but is very expensive and will be difficult to implement because of the intense land use along parts of the route. It would also require an upgrading of the Red Hills Surplus Channel.
(ii) With regard to outfalls, a short cut canal from the Buckingham canal to the sea of 100 m3/sec. capacity was tested using the models but found to have limited impact on water levels: a larger capacity would be required to have a significant effect. This would be very difficult to implement, given the intensity of land use between the Buckingham Canal and the sea. It was thus concluded that it would be better to improve the Buckingham Canal and rely on the existing outfalls. While these outfalls are choked for much of the year due to littoral drift, analysis showed that the bar would wash out quickly during a major flood event and not form a significant obstacle. This
has been confirmed by observation. The sand bars are thus principally a problem for public health, rather than flood relief. It is possible that, during minor flooding, the bar may be an obstacle to flow from the urban drains, but this is unlikely to be catastrophic.
(iii) The conclusion reached was that flood defence and re-sectioning options would provide the cheapest and most assured way of dealing with the macroflooding problem. Schemes have been outlined for the Cooum, the Kosasthalaiyar, the Red Hills Surplus Channel, the Buckingham Canal, the Otteri Nullah and the Captain Cotton Canal, and tested in the model. Several of these schemes are interdependent. On the Kosasthalaiyar, it is not possible to contain the floodwaters with embankments at reasonable cost. Protection has thus been provided on the south bank only, and a controlled floodway is proposed for the north bank upstream of Minjur. This will need to be designated as a flood zone and development restricted in that area. Existing villages will require to be protected, probably using ring banks. The Kosasthalaiyar will also spill near its confluence into the existing wetland areas.
(iv) For the urban storm water (micro) system, existing coverage of drainage provision within the study area boundary was found to be 50%. The design standard currently adopted was found to be equivalent to about a 1 in 1.25 year 60 minute storms. The economic analysis indicated that a design standard of 1 in 2 or 1 in 3 year return period was the most cost-effective for new areas of drainage, but also showed that upgrading the existing system to this standard was not economically worthwhile. However the drainage system was generally found to be in a poor state, with many blockages due to solid waste and services (water pipes, cables etc.) and repairs needed. The principal interventions envisaged are thus repairs/rehabilitation of existing systems and improved maintenance which is seriously under-funded. For Manali, outline schemes and costs were prepared for pumped storm water disposal and for flood protection.