Core and Shell buildings have tenant occupied spaces. Hence the compliance is limited to the base building systems in the common areas that is in the scope of the builder/developer.
The legal undertaking shall mandate the relevant energy efficiency compliance requirements for all interior fit-outs within the tenant leased area, including, but not limited to, §5.2.1, §5.2.2.2, §5.2.2.3, §5.2.2.5, §0 and §7.2.4.
ECBC addresses existing buildings in certain aspects such as new addition or an alteration as discussed below.
Additions and Alterations to Existing Buildings
An addition is a new floor, wing or a block that extends or increases the area or height of the existing building. An example of an alteration could be a change in converting an unconditioned space to a conditioned space.
The Code is applicable when the connected load of the addition or the alteration plus the existing building exceeds 100kW or of connected load or 120 kVA of contract demand.
The new addition should meet the mandatory requirements as per §4 through §7. After that, the Code compliance can be shown either through the prescriptive or the WBP approach. The Code does not require any changes to be made to the existing building
As per the Code,
Compliance may be demonstrated in either of the following ways:
(a) The addition shall comply with the applicable requirements, or
(b) The addition, together with the entire existing building, shall comply with the requirements of this Code that shall apply to the entire building, as if it were a new building.
Exceptions to §3.3.2: When space conditioning is provided by existing systems and equipment, the existing systems and equipment need not comply with this code. However, any new equipment installed must comply with specific requirements applicable to that equipment.
For example, three new floors have been added to an existing building. The addition is being served by the existing chillers that is supplying chilled water to the existing building. In this case, the chiller does not need to comply with the Code, but any new air distribution equipment installed in the addition need to comply with the Code. However, if a new chiller has to be installed due to an addition, then the chiller must also comply with the Code.
The simplest compliance method for additions and alterations is to treat the addition as if it were its own separate building.
A building following the whole building performance method or Total System Efficiency
– Alternate Compliance Approach essentially requires the use of computer simulation tools that help estimate the energy use of a building. Only BEE approved software tools can be used to show compliance.
The compliance can also be shown through the BEP-EMIS online tool. The Building Energy Passport (BEP) - Energy Monitoring Information System (EMIS) is an online platform for ECBC compliance. The platform has forms and calculators built into it that streamlines the documentation as well as assessment for compliance.
Compliance to the daylight requirements of §4.2.3, if calculated through software tools, shall be shown through online BEP-EMIS or daylighting software approved by BEE.
The list of BEE approved software for whole building energy simulation and daylighting analysis is given in Appendix E: BEE approved list of software to show compliance.
Administrative Requirements
Administrative requirements, including but not limited to, permit requirements, enforcement, interpretations, claims of exemption, approved calculation methods, and rights of appeal are specified by the authority having jurisdiction.
Compliance Documents
Compliance Documents
Thorough documentation is essential for a smooth approval process. Documentation of compliance can be shown through drawings, technical data, specification, material brochure, calculations, report and any other supporting material.
As per the Code,
Construction drawings and specifications shall show all pertinent data and features of the building, equipment, and systems in sufficient detail to permit the authority having jurisdiction to verify that the building complies with the requirements of this code. Details shall include, but are not limited to:
(a) Building Envelope: opaque construction materials and their thermal properties including thermal conductivity, specific heat, density along with thickness; fenestration Ufactors, solar heat gain coefficients (SHGC), visible light transmittance (VLT) and building envelope sealing documentation; overhangs and side fins, building envelope sealing details;
(b) Heating, Ventilation, and Air Conditioning: system and equipment types, sizes, efficiencies, and controls; economizers; variable speed drives; piping insulation; duct sealing, insulation and location; solar water heating system; requirement for balance report;
(c) Lighting: lighting schedule showing type, number, and wattage of lamps and ballasts; automatic lighting shutoff, occupancy sensors, and other lighting controls; lamp efficacy for exterior lamps;
(d) Electrical Power: electric schedule showing transformer losses, motor efficiencies, and power factor correction devices; electric check metering and monitoring system.
(e) Renewable energy systems: system peak generation capacity, technical specifications, solar zone area
Compliance forms have been provided in Appendix D: Compliance Forms to facilitate the process of compliance and check.
The authority having jurisdiction may require supplemental information necessary to verify compliance with this code, such as calculations, worksheets, compliance forms, manufacturer’s literature, or other data.

Building Envelope
Thermal loads determine the amount of cooling and/or heating required to keep occupants comfortable in a building. The first step in achieving energy efficiency is to reduce thermal loads through good building envelope. This can be achieved by ensuring good thermal resistance, blocking direct solar radiation and ensuring good daylighting.
MANDATORY
PRESCRIPTIVE
BASE BUILDING DEFINITION
FENESTRATIONS
ROOF
OPAQUE CONSTRUCTION
OPAQUE EXTERNAL WALL
DAYLIGHTING
VERTICAL FENESTRATION
BUILDING ENVELOPE SEALING
U-FACTOR EXEMPTION
SKYLIGHTS
BUILDING ENVELOPE TRADE OFF METHOD
4.BUILDING Envelope