i) If during the course of construction of a building any substantial deviation from the sanctioned plan or any structural deviation is proposed to be made, prior approval of the sanctioning authority shall be obtained before the change is made. The revised (amended) plan showing the deviation shall be submitted and the procedure laid down for the original plan shall apply to all such revised (amended) plan.
ii) Minor alteration of the nature of shifting of doors and windows, pillars or fire-places, which do not conflict with these Bye-Laws may however, be made by the owner and stated in the completion report. The decision of the sanctioning authority as the case may be as to whether the alteration made are of minor or substantial nature shall be final.
13 Completion Report
Every person erecting a building shall, within one month after completion of such building deliver or cause to be delivered or send notice to the Authority in writing of the completion of such building in Form No.11.
14 Service Connection
Permission for service connection such as Electricity, Water supply or sewer connection to the building shall be given in Form - B, only after the Authority inspect the building and is satisfied that the building has conformed to the requirement as laid down in the building bye laws.
15 Occupancy Certificate
Within 15 days of receipt of the completion report, the Competent Authority shall inspect the building and after satisfaction shall issue permission to occupy the building. If within 30 days the inspection cannot be carried out, the applicant may occupy the building as if the permission to occupy has been granted.
16 Minimum Size
No building for residential purpose shall generally be constructed on any site having an area less than 55 square metres. The site should have proportionate length and breadth for construction of the building. In case of sites not having proportionate length and breadth, no construction shall be allowed.