This Part covers the administrative aspects of the Code, such as applicability of the Code, organization of building department for enforcement of the Code, procedure for obtaining development and building permits, and responsibility of the owner.
NOTE — This Code is called the National Building Code of India, hereinafter referred to as ‘the Code’.
3Applicability of the Code
3.1 All Parts of the Code and their sections shall apply to all buildings described in 3.2 to 3.8, as may be applicable.
3.2 Where a building is erected, the Code applies to the design and construction of the building.
3.3 Where the whole or any part of the building is removed, the Code applies to all parts of the building whether removed or not.
3.4 Where the whole or any part of the building is demolished, the Code applies to any remaining part and to the work involved in demolition.
3.5 Where a building is altered (see 12.4 and 12.4.1), the Code applies to the whole building whether existing or new except that the Code applies only to part if that part is completely self-contained with respect to facilities and safety measures required by the Code.
3.6 Where the occupancy of a building is changed, the Code applies to all parts of the building affected by the change.
3.7 Where development of land is undertaken the Code applies to the entire development of land.
3.8 Existing Buildings/Development
Nothing in the Code shall require the removal, alteration or abandonment, nor prevent continuance of the use or occupancy of an existing building/ development, unless in the opinion of the Authority, such building/development constitutes a hazard to the safety of the adjacent property or the occupants of the building itself.
5Alternative Materials, Methods of Design and Construction, and Tests
5.1 The provisions of the Code are not intended to prevent the use of any material or method of design or construction not specifically prescribed by the Code, provided any such alternative has been approved.
5.2 The Authority may approve any such alternative provided it is found that the proposed alternative is satisfactory and conforms to the provisions of relevant parts regarding material, design and construction and that material, method, or work offered is, for the purpose intended, at least equivalent to that prescribed in the Code in quality, strength, compatibility, effectiveness, fire and water resistance, durability and safety.
5.3 Tests
Whenever there is insufficient evidence of compliance with the provisions of the Code or evidence that any material or method of design or construction does not conform to the requirements of the Code or in order to substantiate claims for alternative materials, design or methods of construction not specifically prescribed in the Code, the Authority may require tests sufficiently in advance as proof of compliance. These tests shall be made by an approved agency at the expense of the owner.
5.3.1 Test methods shall be specified by the Code for the materials or design or construction in question. If
there are no appropriate test methods specified in the Code, the Authority shall determine the test procedure. For methods of test for building materials, reference may be made to Part 5 Building Materials.
5.3.2 Copies of the results of all such tests shall be retained by the Authority for a period of not less than two years after the acceptance of the alternative material.
Section 2 Organization and Enforcement
7Power and Duties of Team of Building Officials
7.0 The team of building officials shall enforce all the provisions of the Code and shall act on any question relative to the mode or manner of construction and the materials to be used in the erection, addition, alteration, repair, removal, demolition, installation of service equipment and the location, use, occupancy and maintenance of all buildings except as may otherwise be specifically provided.
7.1 Application and Permits
The team of building officials shall receive all applications and issue permits (see 12.10) for the erection and alteration of buildings and examine the premises for which such permits have been issued and enforce compliance with the Code.
7.2 Building Notices and Orders
The team of building officials shall issue all necessary notices or orders to remove illegal or unsafe conditions, to require the necessary safeguards during construction, to require adequate exit facilities in existing buildings and to ensure compliance with all the requirements of safety, health and general welfare of the public as included in the Code.
7.3 Right of Entry
Upon presentation of proper credentials and with advance notice, the team of building officials or its duly authorized representative may enter at any reasonable time any building or premises to perform any duty imposed upon him by the Code.
7.4 Inspection
The team of building officials shall make all the required inspections or it may accept reports of inspections of authoritative and recognized services or individuals; and all reports of inspections shall be in writing and certified by a responsible officer of such authoritative service or by the responsible individual or engage any such expert opinion as he may deem necessary to report upon unusual technical issues that may arise, subject to the approval of the Authority.
7.5 Construction Not According to Plan
Should the team of building officials determine at any stage that the construction is not proceeding according to the sanctioned plan or is in violation of any of the provisions of the Code, or any other applicable Code Regulation, Act or Byelaw, it shall notify the owner, and all further construction shall be stayed until correction has been effected and approved.
7.5.1 Should the owner fail to comply with the requirements at any stage of construction, the Authority shall issue a notice to the owner asking explanation for non-compliance. If the owner fails to comply within 14 days from the date of receiving the notice, the Authority shall be empowered to cancel the building permit issued and shall cause notice of such cancellation to be securely pasted upon the said construction, if the owner is not traceable at his address given in the notice. Pasting of such a notice shall be considered sufficient notification of cancellation to the owner thereof. No further work shall be undertaken or permitted upon such construction until a valid building permit thereafter has been issued. If the owner, in violation of the notice for cancellation, continues the construction, the Authority may take all necessary means to stop such work and further appropriate actions including demolitions. The owner shall, however, have right to appeal against cancellation of permit, to the board of appeal, within a stipulated period, as may be decided by the Authority.
7.6 Modification
Wherever practical difficulties are involved in carrying out any provision of the Code, the team of building officials may vary or modify such provisions upon application of the owner or his representative provided the spirit and intent of the Code shall be observed and public welfare and safety be assured. The application
for modification and the final decision of the team of building officials shall be in writing and shall be officially recorded with the application for the permit in the permanent records of the Department of Building Inspection.
7.7 Occupancy Violations
Wherever any building is being used contrary to provisions of the Code, the team of building officials may order such use discontinued and the building or portion thereof, vacated by the notice served on any person, causing such use to be discontinued. Such person shall discontinue the use within 10 days after receipt of such notice or make the building or portion thereof, comply with the requirements of the Code.
6Department of Buildings
6.1 The department of buildings shall be created by the Authority and a team of building officials shall be appointed to carry out work of such department.
6.2 Appointment of Team of Building Officials
The team of building officials shall be appointed by the Authority. The team shall comprise officials drawn from concerned disciplines such as engineer, architect, town planner, landscape architect and urban designer as may be decided by the Authority. For scrutiny of layout plans of plots of one hectare and above in metro cities and two hectares and above in other places, town planner shall be part of the team of building officials. For plots of five hectares and above, landscape architect shall also be part of the team. An urban designer shall also be required to be the part of team of building officials for examining proposals on integrated urban design and development for residential/business/ institutional and assembly building.
NOTE — Metro cities are cities with population more than 1 000 000.
6.3 Organization
In the department of buildings, such number of officers, technical assistants, inspectors and other employees shall be appointed to assist the team of building officials as shall be necessary for the administration of the Code and as authorized by the Authority.
6.4 Delegation of Powers
The Authority may designate one of the building officials who shall exercise all the powers of the team of building officials. The work of the team of building officials may be outsourced to competent professional/ agency/group as may be deemed necessary.
6.5 Qualification of Building Officials
The qualification of building officials scrutinizing the plans and carrying out inspection of buildings shall not in any case be less than those prescribed in Annex A.
6.5.1 In small local bodies having insufficient resources to appoint such officials with the above
qualifications, two or three such bodies contiguously located could join together and share the services of one team of building officials.
6.6 Qualifications of Assistant
No person shall be appointed as Assistant unless he has got the qualifications prescribed in Annex A for a registered Supervisor.
6.7 Restriction on Employees
No official or employee connected with the department of buildings except one whose only connection is that of a member of the Board of Appeals, established under 8 shall be engaged directly or indirectly in a work connected with the furnishing of labour, materials or appliances for the construction, alteration or maintenance of a building, or the preparation of plans or of specifications thereof unless he is the owner of building; nor shall such official or employee engage in any work which conflicts with his official duties or with the interests of the Department.
6.8 Records
Proper records of all applications received, permits and orders issued, inspections made shall be kept and copies of all papers and documents connected with the administration of its duties shall be retained and all such records shall be open to public inspection at all appropriate times.
8Board of Appeals
In order to determine the suitability of alternative materials or methods of design or construction and to provide for reasonable interpretation of the provisions of the Code or in the matter of dispute relating to an ongoing construction vis-a-vis the sanctioned plan, a Board of Appeals consisting of members who are qualified by experience and training and to pass judgement upon matters pertaining to building construction, shall be appointed by the Authority. A representative of the team of building officials shall be an ex-officio member and shall act as secretary to the Board. The Board shall adopt reasonable rules and regulations for conducting its investigations and shall render all decisions and findings in writing to the team of building officials with a duplicate copy to the appellant and may recommend such modifications as are necessary.
9Violations and Penalties
9.1 Offences and Penalties
9.1.1 Any person who contravenes any of the provisions of the Code or any requirements of obligations imposed on him by virtue of the Code, or who interferes with or obstructs any person in the discharge of his duties, shall be guilty of an offence and the Authority shall levy suitable penalty or take other actions as per the Code (see also 7.5 and 15).
NOTE — The penalty may be in the form of collection of arrears of tax.
9.1.2 The buildings/developments violating any applicable statutory rules shall be demolished/brought within the limits as prescribed in such rules at the expense of the owner. The buildings coming up in the vicinity of an aerodrome in violation of the height restriction laid down by the Directorate General of Civil Aviation shall be accordingly demolished/brought within the limits prescribed by DGCA rules.
9.1.3 The registered architect, engineer, structural engineer, supervisor, town planner, landscape architect, urban designer and utility service engineer (see Annex A) responsible for the services rendered for supervision of the construction/development and for the completion certificate; in the event of violation of the provisions of the Code, shall be liable to penalties as prescribed by the Authority including cancellation of registration done by it or make such recommendation to the statutory body governing such profession.
9.2 Further Obligation of Offender
The conviction of any person for an offence under the provision of 9.1 shall not relieve him from the duty of carrying out the requirements or obligations imposed on him by virtue of the provisions of the Code; and if such requirements or obligations are not complied with in accordance with an order made under provisions of 9.1, the Authority under the provisions of the Code may, if necessary and advisable, enter upon the premises in respect of which a conviction has been made and carry out at the expense of the convicted person, the requirements or obligations referred to in the said order and the expense, if not paid on demand, may be recovered with cost in a court.
9.3 Conviction No Bar to Further Prosecution
The conviction of any person under the provisions of this part for failing to comply with any of the said requirements or obligations shall not operate as a bar to further prosecution under this part for any subsequent failure on the part of such person to comply.
10Power to Make Rules
The Authority may make rules for carrying out the provisions and intentions of the Code provided that any rule shall not be in direct/indirect conflict or nullify/dilute any of the provisions of the Code.
Section 3 Permit and Inspection
11Development/building Permit
11.1 Permit Required
No person shall carry out any development, erect, reerect or make alterations or demolish any building or cause the same to be done without first obtaining a separate permit for each such development/building from the Authority. No permits shall, however, be required for works referred to in 12.1.1.1 and 12.4.1.
11.1.1 The development/building permit shall take into cognizance the provisions under the relevant Town Planning Act/Development Act/Municipal Act/any other applicable statutes for layout, building plans, water supply, sewerage, drainage, electrification, etc, as provided in the said Act/statute. Also, if so directed
by the Authority, the permit shall take care of the need for landscape development plan incorporating rainwater harvesting proposals in the layout and building plans.
11.1.2 Specific approvals shall be obtained from Civil Aviation Authorities, Fire Services Department (in case the building proposed is 15 m and above), Pollution Control Board, designated authorities under Factories Act/Cinema Regulation Act, Urban Arts Commission, designated Coastal Regulation Zone Authority, Archeological Survey of India, Heritage Committee and any such other authority as may be applicable.
11.1.3 In order to facilitate clearance from above bodies with the concept of single window clearance approach and thereby final approval by the Authority within the stipulated time frame, the Authority may constitute a Development/Building Permit Approval Committee consisting of representative of the team of building officials, representatives of all bodies/ organizations from whom clearance for development/ building permit clearance is required.
Recommendations from such Committee shall be summarily utilized by the team of building officials in sanctioning process. The Committee may meet once in 15/30 days depending upon the work load. The first response/invalid notice/non-compliance intimation shall be issued by the Authority to the owner within 30 days of submission of the plans to the Authority.
11.1.4 The Authority shall permit a registered architect/engineer to approve the building proposals including plans, and certify completion of building for issue of related regulatory building permits and occupancy certificate for residential buildings designed by self or otherwise, on plot size up to 500 m2. The responsibility of compliance with respect to provisions of Code shall rest with the registered architect/engineer. However, the plans shall be required to be submitted to the Authority for information and record.
NOTE — Where the experience clearly shows that satisfactory building permit activities are being carried out through the above empowerment of professionals, the Authority may extend such provision for larger areas and other building occupancies.
11.2 Pre-Code Development/Building Permit
If any development/building, permit for which had been issued before the commencement of the Code, is not wholly completed within a period of three years from the date of such permit, the said permission shall be deemed to have lapsed and fresh permit shall be necessary to proceed further with the work in accordance with the provisions of the Code.
12Application for Development/ Building Permit
12.1 Notice
Every owner who intends to develop, erect, re-erect or make alterations in any place in a building shall give notice in writing to the Authority of his said intention in the prescribed form (see Annex B) and such notice shall be accompanied by plans and statements in triplicate as required under 12.2 and 12.3 except for special buildings (high rise, non-residential) where additional copies may be submitted as desired by the Authority. The Authority shall permit submission of plans/documents in electronic form in addition to hard copy. The Authority should also progressively computerize the approval process.
12.1.1 Regarding submission of plans by Government Departments, the procedure shall be as given in 12.1.1.1 and 12.1.1.2.
12.1.1.1 The operational construction/installation of the Government, whether temporary or permanent, which is essential for the operation, maintenance, development or execution of any of the following services may be exempted from the point of view of the byelaws:
a) Railways;
b) National highways;
c) National waterways;
d) Major ports;
e) Airways and aerodromes;
f) Posts and telegraphs, telephones, wireless, broadcasting, and other like forms of communications;
g) Regional grid for electricity;
h) Defence; and
j) Any other service which the Central/State Government may, if it is of opinion that the operation, maintenance, development of execution of such service is essential to the life of the community, by notification, declare to be a service for the purpose of this clause.
In case of construction/installation where no approvals are required, the concerned agencies which are exempted from seeking approval shall submit the drawings/plans/details for information and records of the Authority before construction/installation.
12.1.1.2 However, the following construction of the Government departments do not come under the purview of operational construction for the purpose of exemption under 12.1.1.1:
a) New residential building (other than gate lodges, quarters for limited essential operational
staff and the like), roads and drains in railway colonies, hospitals, clubs, institutes and schools, in the case of railways; and
b) A new building, new construction or new installation or any extension thereof in the case of any other services.
12.2Information Accompanying Notice
The notice shall be accompanied by the key plan, site plan, building plan, services plans, specifications structural sufficiency certificate and certificate of supervision as prescribed in 12.2.2 to 12.2.8.
12.2.1 Sizes of Drawing Sheets and Recommended Notation for Colouring Plans
12.2.1.1 The size of drawing sheets shall be any of those specified in Table 1.
12.2.1.2 The plans shall be coloured as specified in Table 2.
12.2.2 Key Plan
A key plan drawn to a scale of not less than 1 in 10 000 shall be submitted along with the application for a development/building permit showing the boundary locations of the site with respect to neighbourhood landmarks. The minimum dimension of the key plan shall be not less than 75 mm.
12.2.3 Site Plan
The site plan sent with an application for permit shall be drawn to a scale of not less than 1 in 500 for a site up to one hectare and not less than 1 in 1 000 for a site more than one hectare and shall show:
a) the boundaries of the site and of any contiguous land belonging to the owner thereof;
b) the position of the site in relation to neighbouring street;
c) the name of the streets in which the building is proposed to be situated, if any;
d) all existing buildings standing on, over or under the site including service lines;
e) the position of the building and of all other buildings (if any) which the applicant intends to erect upon his contiguous land referred to in (a) in relation to:
Table 2Colouring of Plans (Clause 12.2.1.2)
SlNo.
Item
Site Plan
Building Plan
White Plan
Blue Print
Ammonia Print
White Plan
Blue Print
Ammonia Print
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
i)
Plot lines
Thick black
Thick black
Thick black
Thick black
Thick black
Thick black
ii)
Existing street
Green
Green
Green
—
—
—
iii)
Future street, if any
Green dotted
Green dotted
Green dotted
—
—
—
iv)
Permissible building lines
Thick dotted black
Thick dotted black
Thick dotted black
—
—
—
v)
Open spaces
No colour
No colour
No colour
No colour
No colour
No colour
vi)
Existing work
Black (outline)
White
Blue
Black
White
Blue
vii)
Work proposed to be demolished
Yellow hatched
Yellow hatched
Yellow hatched
Yellow hatched
Yellow hatched
Yellow hatched
viii)
Proposed work (see Note 1)
Red filled in
Red
Red
Red
Red
Red
ix)
Drainage and sewerage work
Red dotted
Red dotted
Red dotted
Red dotted
Red dotted
Red dotted
x)
Water supply work
Black dotted thin
Black dotted thin
Black dotted thin
Black dotted thin
Black dotted thin
Black dotted thin
NOTES
1 For entirely new construction this need not be done; for extension of an existing work this shall apply.
2 For land development, subdivision, layout, suitable colouring notations shall be used which shall be indexed.
the boundaries of the site and in case where the site has been partitioned, the boundaries of the portion owned by the applicant and also of the portions owned by others;
all adjacent street, buildings (with number of storeys and height) and premises within a distance of 12 m of the site and of the contiguous land (if any) referred to in (a); and
if there is no street within a distance of 12 m of the site, the nearest existing street;
f) the means of access from the street to the building, and to all other buildings (if any) which the applicant intends to erect upon his contiguous land referred to in (a);
g) space to be left about the building to secure a free circulation of air, admission of light and access for scavenging purposes;
h) the width of the street (if any) in front and of the street (if any) at the side or near the buildings;
j) the direction of north point relative to the plan of the buildings;
k) any physical features, such as wells, drains, etc; and
m) such other particulars as may be prescribed by the Authority.
12.2.4 Sub-Division/Layout Plan
In the case of development work, the notice shall be accompanied by the sub-division/layout plan which shall be drawn on a scale of not less than 1 : 500 containing the following:
a) Scale used and north point;
b) The location of all proposed and existing roads with their existing/proposed/prescribed widths within the land;
c) Dimensions of plot along with building lines showing the setbacks with dimensions within each plot;
d) The location of drains, sewers, public facilities and services, and electrical lines, etc;
e) Table indicating size, area and use of all the plots in the sub-division/layout plan;
f) A statement indicating the total area of the site, area utilized under roads, open spaces for parks, playgrounds, recreation spaces for parks, playgrounds, recreation spaces and development plan reservations, schools, shopping and other public places alongwith their percentage with reference to the total
area of the site proposed to be subdivided; and
g) In case of plots which are subdivided in builtup areas in addition to the above, the means of access to the sub-division from existing streets.
12.2.5 Building Plan and Details
The plan of the buildings and elevations and sections accompanying the notice shall be drawn to a scale of 1 : 100. The plans and details shall:
a) include floor plans of all floors together with the covered area clearly indicating the size and spacings of all framing members and sizes of rooms and the position of staircases, ramps and liftwells;
b) show the use or occupancy of all parts of the buildings;
c) show exact location of essential services, for example, WC, sink, bath and the like;
d) include at least one elevation from the front showing height of building and rooms and also the height of parapet;
e) include at least one section through the staircase;
f) include the structural arrangements with appropriate sections showing type/ arrangement of footings, foundations, basement walls; structural load bearing walls, columns and beams, and shear walls; and arrangement/spacing of framing members, floor slabs and roof slabs with the material used for the same;
g) show all street elevations;
h) give dimensions of the projected portions beyond the permissible building line;
j) include terrace plan indicating the drainage and the slope of the roof; and
k) give indications of the north point relative to the plan.
NOTE — The requirement of 1 : 100 is permitted to be flexible for specific details needed for further illustration; and also for drawings for these in electronic form.
12.2.5.1 Building plan for multi-storeyed/special buildings
For all multi-storeyed buildings which are 15 m or more in height and for special buildings like educational, assembly, institutional, industrial, storage and hazardous and mixed occupancies with any of the aforesaid occupancies having covered area more than 500 m2, the building sanction shall be done in two stages.
Stage 1: First stage for planning clearance
The following additional information shall be furnished/indicated in the building plan in addition to the items given in 12.2.5 as applicable:
a) Access to fire appliances/vehicles with details of vehicular turning circle and clear motorable accessway around the building;
b) Size (width) of main and alternative staircases along with balcony approach, corridor, ventilated lobby approach;
c) Location and details of lift enclosures;
d) Location and size of fire lift;
e) Smoke stop lobby/door, where provided;
f) Refuse chutes, refuse chamber, service duct, etc;
g) Vehicular parking spaces;
h) Refuse area, if any;
j) Details of building services — Air-conditioning system with position of fire dampers, mechanical ventilation system, electrical services, boilers, gas pipes, etc;
12.2.6 Services Plans
The services plans shall include all details of building and plumbing services, and also plans, elevations and sections of private water supply, sewage disposal system and rainwater harvesting system, if any (see Part 8 ‘Building Services’ and Part 9 ‘Plumbing Services’).
12.2.7 Specifications
Specifications, both general and detailed, giving type and grade of materials to be used, duly signed by the registered architect, engineer, structural engineer or supervisor shall accompany the notice (see Annex B).
12.2.8 Structural Sufficiency Certificate
The plans shall be accompanied by structural sufficiency certificate in the prescribed form (see Annex C) signed by the engineer/structural engineer (see Annex A) and the owner jointly to the effect that the building is safe against various loads, forces and effects including due to natural disasters, such as, earthquake, landslides, cyclones, floods, etc as per Part 6 ‘Structural Design’ and other relevant Codes. The engineer/structural engineer shall also have the details to substantiate his design.
12.2.9 Supervision
The notice shall be further accompanied by a certificate in the prescribed form (see Annex D) by the registered architect/engineer/structural engineer/supervisor/town planner (see Annex A) undertaking the supervision (see 9.3).
12.3Preparation and Signing of Plans
The registered architect/engineer/supervisor/town planner/landscape architect/urban designer/utility service engineer shall prepare and duly sign the plans as per their competence (see Annex A) and shall indicate his/her name, address, qualification and registration number as allotted by the Authority or the body governing such profession. The structural plans and details shall also be prepared and duly signed by the competent professionals like registered engineer/ structural engineer (see Annex A). The plans shall also be duly signed by the owner indicating his address. The type and volume of buildings/development work to be undertaken by the registered professionals may generally be as in Annex A.
12.4Notice for Alteration only
When the notice is only for an alteration of the building (see 3.5), only such plans and statements, as may be necessary, shall accompany the notice.
12.4.1 No notice and building permit is necessary for the following alterations, and the like which do not otherwise violate any provisions regarding general
building requirements, structural stability and fire and health safety requirements of the Code:
a) Opening and closing of a window or door or ventilator;
b) Providing intercommunication doors;
c) Providing partitions;
d) Providing false ceiling;
e) Gardening;
f) White washing;
g) Painting;
h) Re-tiling and re-roofing;
j) Plastering and patch work;
k) Re-flooring; and
m) Construction of sunshades on one’s own land.
12.10Grant of Permit or Refusal
The Authority may either sanction or refuse the plans and specifications or may sanction them with such modifications or directions as it may deem necessary and thereupon shall communicate its decision to the person giving the notice (see Annex E).
12.10.1 The building plans for buildings identified in 12.2.5.1 shall also be subject to the scrutiny of the Fire Authority and the sanction through building permit shall be given by the Authority after the clearance from the Fire Authority (see also 11.1.3).
12.10.2 If within 30 days of the receipt of the notice under 12.1 of the Code, the Authority fails to intimate in writing to the person, who has given the notice, of its refusal or sanction, the notice with its plans and statements shall be deemed to have been sanctioned; provided the fact is immediately brought to the notice of the Authority in writing by the person who has given notice and having not received any intimation from the Authority within fifteen days of giving such written notice. Subject to the conditions mentioned in this clause, nothing shall be construed to authorize any person to do anything in contravention of or against the terms of lease or titles of the land or against any other regulations, byelaws or ordinance operating on the site of the work.
12.10.3 In the case of refusal, the Authority shall quote the reason and relevant sections of the Code which the plans contravene. The Authority shall as far as possible advise all the objections to the plans and specifications in the first instance itself and ensure that no new
objections are raised when they are resubmitted after compliance of earlier objections.
12.10.4 Once the plan has been scrutinized and objections have been pointed out, the owner giving notice shall modify the plan to comply with the objections raised and re-submit it. The Authority shall scrutinize the re-submitted plan and if there be further objections, the plan shall be rejected.
12.8Revocation of Permit
The Authority may revoke any permit issued under the provisions of the Code, wherever there has been any false statement, misrepresentation of any material fact in the application on which the permit was based or violation of building permit or in case of noncompliance thereof, and shall state the reasons for revoking the permit.
12.9 Qualifications of Architects/Engineers/ Structural Engineers/Landscape Architect/Urban Designer/Supervisors/Town Planners/Services Personnel
Architects, engineers, structural engineers, landscape architect, urban designer, supervisors and town planners wherever referred in the Code, shall be registered by the Authority or the body governing such profession constituted under a statute, as competent to do the work for which they are employed. A guide for the equivalent technical qualifications and professional experience required for such registration with the Authority is given in Annex A. In case of building and plumbing services, qualifications for engineers for utility services shall be as given in A-2.8.
12.9.1 In case the registered professional associated with the preparation and signing of plans or for supervision, is being changed during any stage of building/land development process, the professional shall intimate the Authority in writing about the further non-association with the project.
12.5Fees
No notice as referred to in 12.1 shall be deemed valid unless and until the person giving notice has paid the fees to the Authority and an attested copy of the receipt of such payment is attached with the notice.
NOTE — The fees may be charged as a consolidated fee. In the event of a building/development permit is not issued, the fees so paid shall not be returned to the owner, but he shall be allowed to re-submit it without any fees after complying with all the objections raised by the Authority within a period of one year from the date of rejection after which fresh fees shall have to be paid.
12.6 Duration of Sanction
The sanction once accorded shall remain valid up to three years. The permit shall be got revalidated before the expiration of this period. Revalidation shall be subject to the rules then in force.
12.7 Deviations During Construction
If during the construction of a building any departure (excepting for items as given in 12.4.1) from the sanctioned plan is intended to be made (see 7.5), sanction of the Authority shall be obtained before the change is made. The revised plan showing the deviations shall be submitted and the procedure laid down for the original plan heretofore shall apply to all such amended plans except that the time limit specified in 12.10.2 shall be three weeks in such cases.
13Responsibilities and Duties of the Owner
13.1 Neither the granting of the permit nor the approval of the drawings and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of the Code (see 9).
13.2 Every owner shall:
a) permit the Authority to enter the building or premises for which the permit has been granted at any reasonable time for the purpose of enforcing the Code;
b) submit a document of ownership of the site;
c) obtain, where applicable, from the Authority, permits relating to building, zoning, grades, sewers, water mains, plumbing, signs, blasting, street occupancy, electricity, highways, and all other permits required in connection with the proposed work;
d) give notice to the Authority of the intention to start work on the building site (see Annex F);
e) give written notice to the Authority intimating completion of work up to plinth level;
f) submit the certificate for execution of work as per structural safety requirements (see Annex G); and give written notice to the Authority regarding completion of work described in the permit (see Annex H);
g) give written notice to the Authority in case of termination of services of a professional engaged by him; and
h) obtain an occupancy permit (see Annex J) from the Authority prior to any:
occupancy of the building or part thereof after construction or alteration of that building or part, or
change in the class of occupancy of any building or part thereof.
13.2.1 Temporary Occupancy
Upon the request of the holder of the permit, the Authority may issue a temporary certificate of
occupancy for a building or part thereof, before the entire work covered by permit shall have been completed, provided such portion or portions may be occupied safely prior to full completion of building without endangering life or public welfare.
13.3 Documents at Site
13.3.1 Where tests of any materials are made to ensure conformity with the requirements of the Code, records of the test data shall be kept available for inspection during the construction of the building and for such a period thereafter as required by the Authority.
13.3.2 The person to whom a permit is issued shall during construction keep pasted in a conspicuous place on the property in respect of which the permit was issued:
a) a copy of the building permit; and
b) a copy of the approved drawings and specifications referred in 12.
14Inspection, Occupancy Permit and Post-occupancy Inspection
14.1 Generally all construction or work for which a permit is required shall be subject to inspection by the Authority and certain types of construction involving unusual hazards or requiring constant inspection shall have continuous inspection by special inspectors appointed by the Authority.
14.2 Inspection, where required, shall be made within 7 days following the receipt of notification, after which period the owner will be free to continue the construction according to the sanctioned plan. At the first inspection, the Authority shall determine to the best of its ability that the building has been located in accordance with the approved site plans. The final inspection of the completion of the work shall be made within 21 days following the receipt of notification [see 13.2(f)] for the grant of occupancy certificate.
14.2.1 The owner/concerned registered architect/ engineer/structural engineer/town planner will serve a notice/completion certificate to the Authority that the building has been completed in all respects as per the approved plans. The deviations shall also be brought to the notice of the Authority (with relevant documents). The team of building officials or its duly authorized representative shall then visit the site and occupancy certificate shall be given in one instance.
14.2.2 The occupancy certificate should clearly state the use/type of occupancy of the building. However, the applicant can apply for change of use/occupancy permitted within the purview of the Master Plan/Zonal Plan/Building Byelaws, where so required.
14.3 When inspection of any construction operation reveals than any lack of safety precautions exist, the Authority shall have right to direct the owner to stop the work immediately until the necessary remedial measures to remove the violation of safety precautions are taken.
14.4 Periodic Occupancy Renewal Certificate
14.4.1 For buildings covered in 12.2.5.1 after completion of the building and obtaining the occupancy certificate, periodic inspections of buildings shall be made by the Fire Authority to ensure the fire safety of the building and compliance with the provisions of fire and life safety requirements (see Part 4 ‘Fire and Life Safey’). Periodic occupancy renewal certificate shall be made available by the Authority/Fire Authority which shall also include safekeep of fire fighting installations and equipments for such buildings.
14.4.2 All occupied building and buildings covered under 12.2.5.1 shall also be subjected to periodic physical inspection by a team of multi-disciplinary professionals of local Authority. The work by team of professionals may be outsourced by the Authority to competent professionals as may be deemed necessary. The team shall ensure the compliance of byelaws, natural lighting, ventilation, etc, besides structural and electrical safety. After checking, the team shall be required to give the certificate for above aspects. If any shortcoming/deficiencies or violations are noticed during inspection, the Authority shall ensure the compliance of these within a specified time frame of six months. If not complied with, the building shall be declared unsafe. The period of inspection shall usually be 3 to 5 years but in any case not more than 5 years.
15Unsafe Building
15.1 All unsafe buildings shall be considered to constitute danger to public safety and shall be restored by repairs or demolished or dealt with as otherwise directed by the Authority (see 15.2 to 15.5).
15.2 Examination of Unsafe Building
The Authority shall examine or cause to be examined every building reported to be unsafe or damaged, and shall make a written record of such examination.
15.3 Notice to Owner, Occupier
Whenever the Authority finds any building or portion thereof to be unsafe, it shall, in accordance with established procedure for legal notice, give to the owner and occupier of such building written notices stating the defects thereof. This notice shall require the owner or the occupier within a stated time either to complete specified repairs or improvements or to demolish and remove the building or portion thereof.
15.3.1 The Authority may direct in writing that the building which in his opinion is dangerous, or has no provision for exit if caught fire, shall be vacated immediately or within the period specified for the purpose; provided that the Authority concerned shall keep a record of the reasons for such action with him.
If any person does not comply with the orders of vacating a building, the Authority may direct the police to remove the person from the building and the police shall comply with the orders.
15.4 Disregard of Notice
In case the owner or occupier fails, neglects, or refuses to comply with the notice to repair or to demolish the said building or portion thereof, the Authority shall cause the danger to be removed whether by demolition or repair of the building or portion thereof or otherwise.
15.5 Cases of Emergency
In case of emergency, which, in the opinion of the Authority involves imminent danger to human life or health, the decision of the Authority shall be final. The Authority shall forthwith or with such notice as may be possible promptly cause such building or portion thereof to be rendered safe by retrofitting/strengthening to the same degree of safety or removed. For this purpose, the Authority may at once enter such structure or land on which it stands, or abutting land or structure, with such assistance and at such cost as may be deemed necessary. The Authority may also get the adjacent structures vacated and protect the public by an appropriate fence or such other means as may be necessary.
15.6 Costs
Costs incurred under 15.4 and 15.5 shall be charged to the owner of the premises involved. Such costs shall be charged on the premises in respect of which or for the benefit of which the same have been incurred and shall be recoverable as provided under the laws (see Note).
NOTE — The costs may be in the form of arrears of taxes.
16Demolition of Building
Before a building is demolished, the owner shall notify all utilities having service connections within the building, such as water, electric, gas, sewer and other connections. A permit to demolish a building shall not be issued until a release is obtained from the utilities stating that their respective service connections and appurtenant equipment, such as, meters and regulators have been removed or sealed and plugged in a safe manner.
17Validity
17.1 Partial Invalidity
In the event any part or provision of the Code is held to be illegal or void, this shall not have the effect of making void or illegal any of the other parts or provisions thereof, which may or shall be determined to be legal, and it shall be presumed that the Code would have been passed without such illegal or invalid parts or provisions.
17.2 Segregation of Invalid Provisions
Any invalid part of the Code shall be segregated from the remainder of the Code by the court holding such part invalid, and the remainder shall remain effective.
17.3 Decisions Involving Existing Buildings
The invalidity of any provision in any clause of the Code as applied to existing buildings and structures shall not be held to effect the validity of such section in its application to buildings hereafter erected.
2Terminology
2.0 For the purpose of this part, the following definitions shall apply.
2.1 Accessory Use — Any use of the premises subordinate to the principal use and customarily incidental to the principal use.
2.2 Alteration — A change from one type of occupancy to another, or a structural change, such as an addition to the area or height, or the removal of part of a building, or any change to the structure, such as the construction of, cutting into or removal of any wall, partition, column, beam, joist, floor or other support, or a change to or closing of any required means of ingress or egress or a change to the fixtures or equipment.
2.3 Approved — Approved by the Authority having jurisdiction.
2.4 Authority Having Jurisdiction — The Authority which has been created by a statute and which, for the purpose of administering the Code/Part, may authorize a committee or an official or an agency to act on its behalf; hereinafter called the ‘Authority’.
2.5 Building — Any structure for whatsoever purpose and of whatsoever materials constructed and every part thereof whether used as human habitation or not and includes foundation, plinth, walls, floors, roofs, chimneys, plumbing and building services, fixed platforms, verandah, balcony, cornice or projection, part of a building or anything affixed thereto or any wall enclosing or intended to enclose any land or space and signs and outdoor display structures. Tents/ SHAMIANAHS, tarpaulin shelters, etc, erected for temporary and ceremonial occasions with the permission of the Authority shall not be considered as building.
2.6 Building, Height of — The vertical distance measured, in the case of flat roofs from the average level of the ground around and contiguous to the building or as decided by the Authority to the terrace
of last livable floor of the building adjacent to the external walls; and in the case of pitched roofs, up to the point where the external surface of the outer wall intersects the finished surface of the sloping roof, and in the case of gables facing the road, the midpoint between the eaves level and the ridge. Architectural features serving no other function except that of decoration shall be excluded for the purpose of measuring heights.
2.7 Building Line — The line up to which the plinth of a building adjoining a street or an extension of a street or on a future street may lawfully extend. It includes the lines prescribed, if any, in any scheme. The building line may change from time-to-time as decided by the Authority.
2.8 Conversion — The change of occupancy or premises to any occupancy or use requiring additional occupancy permit.
18Architectural Control
18.1 Compliance with the provisions of the Code is adequate for normal buildings. But for major public building complexes or buildings coming up in an important area near historic/monumental buildings and areas of heritage, the aesthetics of the whole scheme may also have to be examined, vis-a-vis existing structures. In addition, any development which may mar the general characteristics and environment of historical, architectural or other monuments should also be subject to the provisions of this clause. This clause is intended to cover very few structures to come up in the vicinity of other declared/historically important structures, and the scrutiny shall be limited to the external architectural features only so as to ensure an aesthetic continuance of the existing structures with the new. The scrutiny shall not deal with the routine building plan scrutiny from other requirements of
Code from the point of view of structural safety and functional requirements.
18.2 An Urban Arts Commission shall be established at the city/state level on issues related to urban aesthetics, through a statute. This statutory authority/ commission established by an Act of State Legislative Assembly, shall accord approval to all major buildings/ important development projects having bearing on the urban aesthetics, depending upon the importance of the area with respect to natural or built heritage or projects on plot areas above 1 hectare and located in specifically identified areas. The Urban Arts Commission shall act as guardian of urban architecture; mainly with regard to building form and envelope, the relationship between the building, and the ambient environment vis-a-vis other dependants should be seen in depth.
18.3 The Commission may work in the following manner:
a) The Commission may select only the important buildings as in 18.1 and examine the same. The person responsible for the schemes, say an architect or an engineer, may examine either alone or with the owner. A study of the plans, elevations, models, etc, should be made. The architect/engineer should explain in general terms the purposes which the building is to serve and the main conditions which have influenced him in preparing the design.
b) The Commission after full discussion, may communicate their decision in writing to the parties concerned. The Commission may recommend a change in the whole scheme or suggest modifications in the existing scheme, if so required.
18.4 The Urban Arts Commission should also be charged with advising the city government, on schemes which will beautify the city and add to its cultural vitality.
Annex A(Foreword and Clauses 2.17, 6.5, 6.6, 9.1.3, 12.2.8, 12.3 and 12.9) GUIDE FOR THE QUALIFICATIONS AND COMPETENCE OF PROFESSIONALS A-1 Essential Requirements
A-1.1 Every building/development work for which permission is sought under the Code shall be planned, designed and supervised by registered professionals. The registered professionals for carrying out the various activities shall be: (a) architect, (b) engineer, (c) structural engineer, (d) supervisor, (e) town planner, (f) landscape architect, (g) urban designer, and (h) utility service engineer. Requirements of registration for various professionals by the Authority or by the body governing such profession and constituted under a statute, as applicable to practice within the local body’s jurisdiction, are given in A-2.1 to A-2.5. The competence of such registered personnel to carry out various activities is also indicated in A-2.1.1 to A-2.5.1.
A-2 Requirements for Registration and Competence of Professionals
A-2.1 Architect
The minimum qualifications for an architect shall be the qualifications as provided for in the Architects Act, 1972 for registration with the Council of Architecture.
A-2.1.1 Competence
The registered architect shall be competent to carryout the work related to the building/development permit as given below:
a) All plans and information connected with building permit except engineering services of multistoreyed/special buildings given in 12.2.5.1.
b) Issuing certificate of supervision and completion of all buildings pertaining to architectural aspects.
c) Preparation of sub-division/layout plans and related information connected with development permit of area up to 1 hectare for metro-cities and 2 hectare for other places.
d) Issuing certificate of supervision for development of land of area up to 1 hectare for metro-cities and 2 hectare for other places.
A-2.2 Engineer
The minimum qualifications for an engineer shall be graduate in civil engineering/architectural engineering of recognized Indian or foreign university, or the Member of Civil Engineering Division/Architectural
k) Details of exits including provision of ramps, etc, for hospitals and special risks;
m) Location of generator, transformer and switchgear room;
n) Smoke exhauster system, if any;
p) Details of fire alarm system network;
q) Location of centralized control, connecting all fire alarm systems, built-in-fire protection arrangements and public address system, etc;
r) Location and dimensions of static water storage tank and pump room along with fire service inlets for mobile pump and water storage tank;
s) Location and details of fixed fire protection installations, such as, sprinklers, wet risers, hose-reels, drenchers, etc; and
t) Location and details of first-aid fire fighting equipments/installations.
Stage 2: Second stage for building permit clearance
After obtaining the sanction for planning (Stage 1) from the Authority, a complete set of structural plans, sections, details and design calculations duly signed by engineer/structural engineer (see Annex A) along with the complete set of details duly approved in Stage 1 shall be submitted. The building plans/details shall be deemed sanctioned for the commencement of construction only after obtaining the permit for Stage 2 from the Authority.
2.9 Development — ‘Development’ with grammatical variations means the carrying out of building, engineering, mining or other operations in, or over, or under land or water, or in the use of any building or land, and includes redevelopment and layout and subdivision of any land; and ‘to develop’ shall be construed accordingly.
2.10 Drain — A conduit or channel for the carriage of storm water, sewage, waste water or other waterborne wastes in a building drainage system.
2.11 Drainage — The removal of any liquid by a system constructed for the purpose.
2.12 Occupancy or Use Group — The principal occupancy for which a building or a part of a building is used or intended to be used; for the purposes of classification of a building according to occupancy, an occupancy shall be deemed to include the subsidiary occupancies which are contingent upon it.
2.13 Occupier — Occupier includes any person for the time being, paying or liable to pay rent or any portion of rent of the building in respect of which the ward is used, or compensation or premium on account of the occupation of such building and also a rent-free tenant, but does not include a lodger, and the words ‘occupy’ and ‘occupation’ do not refer to the lodger.
An owner living in or otherwise using his own building shall be deemed to be the occupier thereof.
2.14 Operational Construction/Installation — A construction/installation put up by Government Departments for operational purposes (see 12.1.1.1).
2.15 Owner — Person or body having a legal interest in land and/or building thereon. This includes free holders, leaseholders or those holding a sub-lease which both bestows a legal right to occupation and gives rise to liabilities in respect of safety or building condition.
In case of lease or sub-lease holders, as far as ownership with respect to the structure is concerned, the structure of a flat or structure on a plot belongs to the allottee/ lessee till the allotment/lease subsists.
2.16 Permit — A permission or authorization in writing by the Authority to carry out work regulated by the Code.
2.17 Registered Architect, Engineer, Structural Engineer, Supervisor, Town Planner, Landscape Architect, Urban Designer — A qualified architect, engineer, structural engineer, supervisor, town planner, landscape architect or urban designer who has been registered by the Authority or by the body governing such profession and constituted under a statute, as may be applicable. The registration requirements of these professionals shall be as given in Annex A.
NOTES
1 Unless specified otherwise, the word ‘engineer’ shall mean ‘civil engineer’ or ‘architectural engineer’.
2 The word ‘licencing/licensed, etc’ if used by the Authority in the above context shall be deemed to mean ‘registration/ registered’, etc.
2.18 Road — See 2.25.
2.19 Road Line — See 2.27.
2.20 Room Height — The vertical distance measured from the finished floor surface to the finished ceiling surface. Where a finished ceiling is not provided, the underside of the joists or beams or tie beams shall determine the upper point of measurement for determining the head room.
2.21 Sanctioned Plan — The set of plans and specifications submitted in connection with a building or development and duly approved and sanctioned by the Authority.
2.22 Service Road — A road/lane provided at the rear or side of a plot for service purposes.
2.23 Set-back Line — A line usually parallel to the plot boundaries and laid down in each case by the Authority, beyond which nothing can be constructed towards the site boundaries.
2.24 Site (Plot) — A parcel (piece) of land enclosed by definite boundaries.
2.25 Street — Any means of access, namely, highway, street, lane, pathway, alley, stairway, passageway,
carriageway, footway, square, place or bridge, whether a thoroughfare or not, over which the public have a right of passage or access or have passed and had access uninterruptedly for a specified period, whether existing or proposed in any scheme and includes all bunds, channels, ditches, storm-water drains, culverts, sidewalks, traffic islands, roadside trees and hedges, retaining walls, fences, barriers and railings within the street lines.
2.26 Street Level or Grade — The officially established elevation or grade of the centre line of the street upon which a plot fronts and if there is no officially established grade, the existing grade of the street at its mid-point.
2.27 Street Line — The line defining the side limits of a street.
2.28 To Erect — To erect a building means:
a) to erect a new building on any site whether previously built upon or not;
b) to re-erect any building of which portions above the plinth level have been pulled down, burnt or destroyed.
2.29 Unsafe Building — Buildings which are structurally and constructionally unsafe or insanitary or not provided with adequate means of egress or which constitute a fire hazard or are otherwise dangerous to human life or which in relation to existing use constitute a hazard to safety or health or public welfare, by reason of inadequate maintenance, dilapidation or abandonment.
Engineering Division of the Institution of Engineers (India) or the statutory body governing such profession, as and when established.
A-2.2.1 Competence
The registered engineer shall be competent to carryout the work related to the building/development permit as given below:
a) All plans and information connected with building permit;
b) Structural details and calculations of buildings on plot up to 500 m2 and up to 5 storeys or 16 m in height;
c) Issuing certificate of supervision and completion for all buildings;
d) Preparation of all service plans and related information connected with development permit; and
e) Issuing certificate of supervision for development of land for all area.
A-2.3 Structural Engineer
The minimum qualifications for a structural engineer shall be graduate in civil engineering of recognized Indian or foreign university, or Corporate Member of Civil Engineering Division of Institution of Engineers (India), and with minimum 3 years experience in structural engineering practice with designing and field work.
NOTE — The 3 years experience shall be relaxed to 2 years in the case of post-graduate degree of recognized Indian or foreign university in the branch of structural engineering. In case of doctorate in structural engineering, the experience required would be one year.
A-2.3.1 Competence
The registered structural engineer shall be competent to prepare the structural design, calculations and details for all buildings and supervision.
A-2.3.1.1 In case of buildings having special structural features, as decided by the Authority, which are within the horizontal areas and vertical limits specified in A-2.2.1(b) and A-2.4.1(a) shall be designed only by structural engineers.
A-2.4 Supervisor
The minimum qualifications for a supervisor shall be diploma in civil engineering or architectural assistantship, or the qualification in architecture or
engineering equivalent to the minimum qualification prescribed for recruitment to non-gazetted service by the Government of India plus 5 years experience in building design, construction and supervision.
A-2.4.1 Competence
The registered supervisor shall be competent to carryout the work related to the building permit as given below:
a) All plans and related information connected with building permit for residential buildings on plot up to 100 m² and up to two storeys or 7.5 m in height; and
b) Issuing certificate of supervision for buildings as per (a).
A-2.5 Town Planner
The minimum qualification for a town planner shall be the Associate Membership of the Institute of Town Planners or graduate or post-graduate degree in town and country planning.
A-2.5.1 Competence
The registered town planner shall be competent to carryout the work related to the development permit as given below:
a) Preparation of plans for land sub-division/layout and related information connected with development permit for all areas.
b) Issuing of certificate of supervision for development of land of all areas.
NOTE — However, for land layouts for development permit above 5 hectare in area, landscape architect shall also be associated, and for land development infrastructural services for roads, water supplies, sewerage/drainage, electrification, etc, the registered engineers for utility services shall be associated.
A-2.6 Landscape Architect
The minimum qualification for a landscape architect shall be the bachelor or master's degree in landscape architecture or equivalent from recognized Indian or foreign university.
A-2.6.1 Competence
The registered landscape architect shall be competent to carryout the work related to landscape design for
building/development permit for land areas 5 hectares and above. In case of metro-cities, this limit of land area shall be 2 hectares and above.
NOTE — For smaller areas below the limits indicated above, association of landscape architect may also be considered from the point of view of desired landscape development.
A-2.7 Urban Designer
The minimum qualification for an urban designer shall be the master's degree in urban design or equivalent from recognized Indian or foreign university.
A-2.7.1 Competence
The registered urban designer shall be competent to carryout the work related to the building permit for urban design for land areas more than 5 hectares and campus area more than 2 hectares. He/She shall also be competent to carryout the work of urban renewal for all areas.
NOTE — For smaller areas below the limits indicated above, association of urban designer may be considered from the point of view of desired urban design.
A-2.8 Engineers for Utility Services
For buildings identified in 12.2.5.1, the work of building and plumbing services shall be executed under the planning, design and supervision of competent personnel. The qualification for registered mechanical engineer (including HVAC), electrical engineer and plumbing engineers for carrying out the work of Air-conditioning, Heating and Mechanical Ventilation, Electrical Installations, Lifts and Escalators and Water Supply, Drainage, Sanitation and Gas Supply installations respectively shall be as given in Part 8 ‘Building Services’ and Part 9 ‘Plumbing Services’ or as decided by the Authority taking into account practices of the National professional bodies dealing with the specialist engineering services.
A-3 Builder/constructor Entity
The minimum qualification and competence for the builder/constructor entity for various categories of building and infrastructural development shall be as decided by the Authority to ensure compliance of quality, safety and construction practices as required under the Code.
Annex B(Clause 12.1) Form for First Application to Develop, Erect, Re-erect or to Make Alteration in Any Place in a Building
To
Sir,
I hereby give notice that I intend to develop, erect, re-erect or to make alteration in the building No....on/in Plot No....in Colony/Street ....MOHALLA/BAZAR/Road....City ....and in accordance with the building code of ....Part II, Clauses ....and I forward herewith the following plans and specifications in triplicate duly signed by me and ....the Architect/Engineer/Structural Engineer/Supervisor/Town Planner/Landscape Architect/Urban Designer¹, Registration No. ....who will supervise its erection.
(Name in block letters)
Key plan
Site plans
Sub-division/layout plan
Building plans
Services plans
Specifications, general and detailed ²⁾
Title of ownership of land/building
Certificates for structural sufficiency and supervision
I request that the development/construction may be approved and permission accorded to me to execute the work.
Signature of Owner....
Name of the Owner ....
(in block letters)
Address of Owner ....
Date:................
¹⁾ Strike out whichever is not applicable.
NATIONAL BUILDING CODE OF INDIA
²⁾ A format may be prepared by the Authority for direct use.
Annex C(Clause 12.2.8) Form for Certificate for Structural Design Sufficiency
With respect to the building work of erection, re-erection or for making alteration in the building No....or to....on/in Plot No. ....Colony/Street....MOHALLA/BAZAR/Road ....City...., we certify that the structural plans and details of the building submitted for approval satisfy the structural safety requirements for all situations including natural disasters, as applicable, as stipulated under Part 6 Structural Design of the National Building Code of India and other relevant Codes; and the information given therein is factually correct to the best of our knowledge and understanding.
Signature of owner with date
Signature of the Registered Engineer/ Structural Engineer with date and registration No.
Name: ............
Address:....................
Annex D(Clause 12.2.9) FORM FOR SUPERVISION
I hereby certify that the development, erection, re-erection or material alteration in/of building No............or the .................on/in Plot No..........in Colony/Street .................MOHALLA/BAZAR/Road.................City............shall be carried out under my supervision and I certify that all the materials (type and grade) and the workmanship of the work shall be generally in accordance with the general and detailed specifications submitted along with, and that the work shall be carried out according to the sanctioned plans.
Signature of Architect/Engineer/Structural Engineer/Supervisor/Town Planner/Landscape Architect/Urban Designer¹⁾....
Name of Architect/Engineer/Structural Engineer/Supervisor/Town Planner/Landscape Architect/Urban Designer¹⁾....
Registration No. of Architect/Engineer/Structural Engineer/Supervisor/Town Planner/Landscape Architect/Urban Designer¹⁾ ....
Address of Architect/Engineer/Structural Engineer/Supervisor/Town Planner/Landscape Architect/Urban Designer¹⁾ ....