14.3.1 Summary of Block Costs
A summary of costs for all outlined proposals under broad categories is given in the Table 14-1. This includes all physical and social infrastructure items for Urban Sectors.
In case of roads, it includes all proposed roads in the NMA – within Urban Sectors and Regional roads. Similarly, as described in the previous chapter 12, certain reservations such as jail, solid waste disposal site are located outside of Urban Sectors.
14.3.2 Cost Components Excluded
Cost of private land for roads is not included in Table 14-2, as land will be made available through grant of TDR. Similarly development of solid waste processing and disposal facility will be implemented through the PPP mode and is not included in the cost estimates. Also, cost for mass rapid transit (metro rail) on southern corridor is not included as this is a special project with complex financing mechanisms depending on feasibility and detailed studies.
14-2
| Description | Cost of private land (INR crores) | Development cost (INR crores) | Total cost (INR crores) |
|---|---|---|---|
| Roads | * | 12,680.0 | 12,680.0 |
| Other transport infrastructure | 194.4 | 212.1 | 406.5 |
| Social amenities | 244.9 | 3,859.4 | 4,104.3 |
| Open Spaces | 661.0 | 937.5 | 1,598.5 |
| Water supply | 11.5 | 5,649.0 | 5,660.5 |
| Sewerage | 15.7 | 4,199.6 | 4,215.3 |
| Storm water drainage and RWH | - | 5,479.2 | 5,479.2 |
| Power | 21.0 | - | 21.0 |
| Solid waste management | 10.3 | 5.1 | 15.4 |
| Affordable housing | 88.5 | 1,035.7 | 1,124.1 |
| Subtotal | 1,247.2 | 34,057.5 | 35,304.8 |
| Additional 5% administration costs | 1,765.24 | ||
| Total | 37,070.02 |
Figure 14-1 illustrates the share of percent costs by type of proposals.
Figure 14-1 : Share of percent costs by type of proposals

14.3.3 Block Costs for Social Amenities and Public Facilities
Block costs for development of proposed social amenities is given in the Table 14-3.
| S. No | Description | Private land cost | Development | Total cost |
|---|
14-3
| (INR crores) | cost (INR crores | (INR crores) | ||
| 1 | Education (Primary and secondary schools) | 62.1 | 404.2 | 466.3 |
| 2 | Medical | 38.9 | 354.0 | 392.9 |
| 3 | Open space/ recreational | 661.0 | 937.5 | 1,598.5 |
| 4 | Cultural (community halls, libraries, auditoria) | 22.7 | 119.0 | 141.7 |
| 5 | Commercial | 38.0 | 1,105.2 | 1,143.2 |
| 6 | Public utility facilities | 25.6 | 174.7 | 200.3 |
| 7 | District court complex | 1.4 | - | 1.4 |
| 8 | Jail | 9.5 | 205.0 | 214.5 |
| 9 | Exhibition Center | 11.6 | 1,012.5 | 1,024.1 |
| 10 | Sports Complex | 35.1 | 484.8 | 519.9 |
| Total | 905.9 | 4,796.9 | 5,702.8 |
14.3.4 Block Costs for Transportation Infrastructure
Block costs for development of proposed transportation infrastructure is given in the Table 14-4.
| S. No | Description | Quantity Land (hectare) | Quantity- BUA (Sq.m) | Cost (Rs. crores) |
|---|---|---|---|---|
| 1 | Roads | * | 12,680.0 | 12,680.0 |
| 2 | Truck Parking | 159.9 | 108.4 | 268.3 |
| 3 | Public parking | 11.6 | 79.1 | 90.7 |
| 4 | Public transportation | 0.0 | 0.0 | 0.0 |
| 5 | Bus depots Total | 22.9194.4 | 24.612,892.1 | 47.513,086.5 |
*Note: Cost of private land for roads not included as the land will be made available through TDR
14.3.5 Block Costs for Water Supply Infrastructure
Block costs for water supply proposals are given in Table 14-5 to Table 14-7.
| S No | Description | Quantity - Land (hectare) | Quantity - MLD | Cost (INR crore) |
|---|---|---|---|---|
| 1.2. | Private land Capacity augmentation of | 0 | - | 0 |
| Mahadula WTP | 197.46 MLD | 296.19 | ||
| Total | 296.19 |
| S. No | Description | Quantity | Land Cost (INR Crore) | Development Cost (INR Crores) |
|---|---|---|---|---|
| 1 | Length of rising mains from WTP to ESR | 130 km | 41.22 | |
| 2 | Private land for ESR in 10 Urban Sectors | 7.83 | 11.51 |
14-4
| S. No | Description | Quantity | Land Cost (INR Crore) | Development Cost (INR Crores) |
|---|---|---|---|---|
| 3 | Distribution network (based on area covered by Urban Sectors) | 53,500 | 5285.8 | |
| Total | 11.51 | 5,338.53 |
*Note: 1. Water supply distribution networks will run along the proposed roads. As the road network is not provided up to plot level, block costs for the distribution network are given based on area covered by urban uses within urban sectors.
| S. No. | Description | Quantity | Cost (INR crore) |
|---|---|---|---|
| 1. | Network length for supplying recycled water to industrial zones in the NMA |
14.3.6 Block Costs for Sewerage Proposals
Block costs for sewerage proposals are given in Table 14-8.
| S. No | Description | Quantity | Land cost (INR Crores) | Development Cost (INR. crores) |
|---|---|---|---|---|
| 1 | Network | 53,500 | 3,964.35 | |
| 2 | STPs (SBR technology, including tertiary treatment) | 15.99 ha | 15.72 | 209.42 |
| Total | 15.72 | 4,173.77 |
*Note: Sewerage networks will run along the proposed roads. As the road network is not provided upto plots, block costs for the sewerage network is given based on area covered by urban uses within urban sectors.
14.3.7 Block Costs for Storm Water Drainage and Rain Water Harvesting Proposals Block costs for sewerage proposals are given in Table 14-9.
| S No | Description | Quantity (hectare) | Development Cost (INR crore) |
|---|---|---|---|
| 1. | Storm water collection network | 53,500 | 1,982.18 |
| 2. | Rain water harvesting system along with grit chamber Total | 30925,074.18 |
14-5
14.3.8 Block Costs for Solid Waste Management Proposals
Cost of private land for solid waste processing and disposal site is given in Table 14-10.
| Sr. No | Description | Land Cost (Rs. crores) |
|---|---|---|
| 1 | Cost of private land for waste processing and disposal site | 9.31 |
| 2 | Cost of private land for Transfer station at 4 locations | 0.99 |
| Total | 10.30 |