The plinth of the main building shall be so located with respect to surrounding ground level that proper drainage of the site is assured. The height of the plinth shall not be less than 450 mm and more than 1.5 metres.
(2) The plinth of court-yard shall be at least 150 mm above the level of the street from where entry to plot has been taken and shall be satisfactorily drained.
(3) 58[In no case, any part of the ramp/ steps connecting building plinth to street/ road shall lie on street/ road and obstruct traffic
57Inserted vide memo no. Misc-2339-ULB-C/7/23/2024-2TCP dated 17.12.2024
58Inserted/amended vide memo no. Misc-138A-Loose/7/5/2006-2TCP dated 22.12.2017
[62]
movement. However, the ramp/ step from the plot boundary to the entry of house building, if required shall be provided. The minimum slope of such ramp shall be 1:4 with minimum width as 1.0 meter for pedestrian use and 3.0 metres for vehicular use.]
7.4Minimum area, size, height and light and ventilation of different components of Residential premises
(1) Minimum area for a habitable room, kitchen and water closet shall be followed in accordance to tablet given as under:
Sr. no.
Room type
Minimum area (in square metres
Size (minimum width) (in metres)
Minimum Height (in metres)
Light and Ventilation (area of open-able windows, ventilators)
1
Habitable room
9.5
2.4
2.75
Total area not less than 1/8th of the total floor area of the room.
2
Kitchen
5.5
1.8
2.75 (except for the portion accommodate floor trap of above floor)
Total area not less than 1/8th of the total floor area of the room.
3
Pantry
3.00
1.40
2.75
Not applicable
4
Bathroom
1.80
1.20
2.45
5
Water Closet
1.1
0.90
2.45
6
Combined Bath and Water Closet
2.8
1.2
2.45
0.3 square metres on wall not less than 0.3 metres wide.
7
Store
No restriction
No restriction
2.10
Not applicable
10
Garage
14.85
2.75 x 5.40
2.40
11
Doorways Habitable room
Not applicable
0.90
2.10
12
Doorways for kitchen, bath, W.C
Not applicable
0.75
2.00
[63]
59[Note: In case of EWS units, the minimum sizes of bathroom, water closet, and combined bathroom & water closet shall be as follows :-
a) The size of independent water-closet shall be 0.90 m² with minimum width of 0.9 m;
b) The size of independent bathroom shall be 1.20 m² with a minimum width of 1.0 m; and
c) The size of combined bath room and water-closet shall be 1.80 m² with minimum width of 1.0 m.]
(2) Habitable room
(i) In case of Group Housing Scheme the dwelling unit having more than one room may have one of the rooms with a clear floor area not less than 7.5 sq. metres with one side not less than 2.4 metres.
(ii) In case of air-conditioned rooms, the height shall not be less than 2.4 metres measured from the surface of the floor to the lowest point of air conditioning duct or false ceiling; and
(iii) All doors and windows shall open directly or through a verandah or to a permanent open space or an open space abutting the building not less than 1.8 metres in width. No portion of a room shall be assumed to be lighted, if it is more than 3 metres or as stated in National Building Code portion.
(iv) 60[The carpet area of any ‘Store’ or ‘Utility Room’ to be provided in any residential building shall not be more than or equal to the minimum area requirement of a habitable room, i.e. 9.5 sqm;
(v) The dining room, drawing room and dining-cum-drawing room shall be considered as a habitable room;
(vi) The provision of lobby exceeding the size of habitable room, i.e. 9.5 sqm in a residential building shall be allowed subject to prior provision of either a drawing room or dining-cum-drawing room.]
59Inserted vide memo no. Misc-2339-ULB-Vol-I/7/8/2025-2TCP dated 08.12.2025
60Inserted vide memo no. Misc-2339-ULB-Vol-II-A/7/5/2006-2TCP dated 25.04.2022. This amendment shall come into force from 25.04.2022.
[64]
(3) Kitchen
(i) In case there is a separate store, the floor area of the kitchen shall be reduced to 4.5 square metres.
(ii) In case of houses constructed on plots up to 100 square metres, the size of the kitchen shall be reduced to 3.8 square metres.
(iii) The kitchen which is intended for use as a dining space also shall have a floor area of not less than 9.5 square metres with a minimum width of 2.45 metres.
(iv) For the purpose of this regulation, a kitchen shall be deemed to be a habitable room and all the aforementioned requirements regarding ventilation shall apply to it provided that the minimum area of the kitchen shall not be less than 5.5 square metres with a minimum width of 1.8 metres.
(v) In case of Group Housing Scheme the minimum area of the kitchen shall not be less than 5.5 square metres with a minimum width of 1.8 metres.
(4) Bathroom and Water Closet (W.C):
(i) Every bathroom and water closet shall: -
(a) preferably be so situated that at least one of its walls shall have opening for circulation of external air, with provision of exhaust fan.
(b) 61[not be directly over any room other than another W.C, washing place, bath or terrace unless it has a water-tight floor (only in case of toilet fixtures affixed at sunken slab);]
(c) have a platform or seat made of water tight non-absorbent materials;
7.5Boundary Wall, Fence, Gate and Porch
(1) The location of gate/ gates shall be as per zoning plan.
(2) Maximum permissible height of front side boundary wall shall be not more than 1.2 metres from the mean level of abutting street in front of the plot from where entry to the plot has been taken.
Note: The owner/ applicant if desires, is permitted to not construct boundary wall in front of plot, so that the said area can be utilized for parking.
(3) Maximum height of boundary wall at rear and side of plot shall not be more than 1.8 metres from the mean level of abutting street in front of the plot from where entry to the plot has been taken.
Note: In case of plots above 2000 square metres, maximum height of boundary wall at the rear and side of plot shall not be more than 1.8 metres from the abutting ground level.
(4) A railing/ grill with or without poly carbonate/ fibre glass sheet covering of 0.75 metre height shall be permitted over and above the maximum height of boundary wall at all sides.
62 Inserted/amended vide memo no. Misc-138A-Loose/7/5/2006-2TCP dated 22.12.2017
[66]
(5) The temporary porches of polycarbonate sheets/ fibre glass roof or any other temporary material covering on suitable structure, shall be allowed in residential plots with the condition that these shall be open on sides in the driveway area within the plot.
(6) The provisions of above Code 7.5(2), (3), (4) and (5) are not applicable to boundary walls of jails.
(7) Boundary wall upto the height of 2.4 metres may be permitted by the Competent Authority in industrial buildings, electric substations, transformer stations, institutional buildings like hospitals, industrial buildings like workshops, factories and educational buildings like schools, colleges, including hostels and other uses of public utility undertakings and strategically sensitive buildings.
7.967[Exit
The Chief Fire officer or an officer authorised for the purpose shall ascertain that the following exit requirements are adhered to by the project proponents: -
(1) The requisite number and size of various exits shall be provided, based on the occupants in each room and floor based on the occupant load, capacity of exits, travel distance and height of buildings as per provisions of Part 4- Fire and Life Safety, National Building Code as amended from time to time.
(2) At least one primary entrance and exit to each building shall be usable by individuals in wheelchairs, indicated by a sign and on a level that would make the elevators accessible.
(3) Arrangement of Exits
(i) Exits shall be so located so that the travel distance on the floor shall not exceed 22.50 metres for residential, educational, institutional and hazardous occupancies, 30.0 metres for assembly, business, mercantile and industrial buildings falling in group G-3 (high hazard industrial building, as defined in National Building Code-2016) and 45 m for industrial buildings falling under groups G-1 and G-2 (low and moderate hazard industrial building respectively, as defined in National Building Code-2016) and storage occupancies. Whenever more than one exit is required for a floor of a building they shall be placed as remote from each other as possible. All the exits shall be accessible from the entire floor area at all floor levels.
(ii) Industrial buildings under groups G-1 and G-2 (low and moderate hazard industrial buildings respectively, as defined in National Building Code-2016) having complex process flows requiring undivided shop floor areas, in a single-storey building, where the building width requirement is more than 90 meters, in such cases the travel distance greater than that mentioned above can be considered, subject to a fire safety assessment by Chief Fire officer or an officer authorised in this regard, and further provided that such buildings are equipped with automatic fire and smoke alarm systems interlinked with
67Substituted vide memo no. Misc-2339-ULB-Vol-II-A/07/05/2006-2TCP dated 08.09.2022. This amendment come into force from 08.09.2022
[71]
fire rated smoke ventilation system in the building, as well as dedicated fire tenders and safety control room in the premises. However, in no case the distance to travel to reach the nearest exit shall exceed 135m.
Note: Provided for the fully sprinklered building mentioned in 7.9 (3) (i), the travel distance may be increased by 50 per cent of the values specified.
(4) Width of Exit
Chapter 7
7.1 Parking
(1) 52[For plots situated in residential plotted colony,
Sr. no.
Size of plot
No of ECS
1
500 Sq.mt. and above
2 ECS per Floor in stilt/open within the plot.
2
250 Sq.mt. and upto 500 Sq.mt
1.5 ECS per Floor in stilt/open within the plot.
3
100 Sq.mt. and upto 250 Sq.mt.
1 ECS per Floor in stilt/open within the plot.
4
Upto 100 Sq.mt.
0.5 ECS per Floor in stilt/open within the plot.
Note- (a) One ECS = 12.5 sq. mt. to be indicated in Car bay size of 2.5 mtrX 5 mtr in residential plots only. (b) Stilt parking shall be mandatory upon construction of 3rd / 4th floors in town falling under Hyper potential category (Gurugram Manesar Urban Complex). For other towns in the State, stilt parking shall be mandatory upon construction of 4th floor. This shall be with prospective effect, for the approval of building plans for all new constructions on vacant plots or when a plot is proposed to be reconstructed upon de novo.] 53 [(c) A service/guard room and a toilet (maximum 16 sqmt. for plots upto 200 sqmt. and 20 sqmt. for plots above 200 sqmt.) shall be permissible in the stilt area/floor, subject to conditions that this area be located adjacent to the staircase/ lift, be counted towards FAR and that the parking and other norms are fulfilled.]
(2) 54 [In Group Housing, minimum 1.5 Equivalent Car Space (ECS) for each dwelling unit shall be required. In addition to above parking requirement for main dwelling units, additional 5% of the total car parking shall be made available against EWS category flats adjoining or below the EWS category flats.]
(3) 55[In Integrated/ Multi Storey Commercial Building, Big Box Retail Stores, restaurant, multiplex/ cinema/ theatre and shopping mall 1.0 ECS for every 50 square metres of covered area shall be required.
52Substituted vide memo no. Misc-2339-VOL-III-ULB/7/5/2006-2TCP dated 27.05.2020 and shall be implementable from date of issuance of said memo..
53 Inserted vide memo no. Misc-2339-ULB-VOL-II-A/7/5/2006-2TCP dated 19.01.2022.
54Substituted vide memo no. Misc-2339-ULB-Vol-I/7/20/2024-2TCP dated 06.11.2024
55 Substittued vide memo no. Misc-138A-Loose/7/5/2006-2TCP dated 22.12.2017
[59]
7.2Courtyard
(1) The courtyard shall have a minimum area, throughout its height, of not less than the square of one-fifth the height of the highest wall abutting the courtyard. Provided that when any room (excluding staircase bay, bathroom and water-closet) is dependent for its light and ventilation on an inner courtyard, the dimension shall be such as is required for each wing of the building.
(2) Provided that such courtyard shall not be less than 12.0 square metres in area and the minimum width of every such courtyard in any direction shall not be less than 3.0 metres. In determining the said aggregate, floor area of the rooms and verandah abutting on the courtyard, following shall be considered:-
(i) Only one half of the floor area of such rooms and verandahs as abut on another courtyard or an open space or road not less than 6 metres in width shall be taken in account;
(ii) The area of the courtyard for the purposes of this Code shall be the area open to sky, clear of all projections.
56 Inserted/amended vide memo no. Misc-138A-Loose/7/5/2006-2TCP dated 22.12.2017
[61]
57[7.2(a) Podium
(1) Uses permitted shall be for parking of vehicles, fire and building services/ utilities and landscaping/ recreational use on topmost podium slab which is open to sky, subject to provision of parapet wall of maximum 1.6m height, which shall be free from FAR and ground coverage. In addition, toilets and driver’s rest rooms shall be allowed in podium which shall not be counted towards FAR and ground coverage.
(2) Podium may be permitted in a plot of area 1,500 sq.m or more. Podium may be permitted in one or more levels, however, the total height shall not exceed 30 m above ground level which shall be measured upto finished floor level of roof of podium excluding parapet wall of maximum 1.6m height.
(3) Podium shall only be allowed to be constructed in the zoned area. Further, the requirement of ramps for vehicles shall be as specified in National Building Code, as amended from time to time.
(4) If the podium is not accessible by fire tender, then it should not extend more than 11.0 m beyond the building footprint where fire tender access is provided, unless accessible by fire engine. If accessible to a fire tender, a minimum 7.5 m wide ramp with a maximum slope of 1 in 10 shall be required for fire engine access.
Note: - Where this Code is silent regarding any norm, the provisions of National Building Code, as amended from time to time, shall be followed.]
7.8Passages and corridors
(1) The minimum width of corridors and passages in a residential building shall be at least 1.25 metres and these shall be of fireresistant material.
(2) Minimum width of any corridor and passage in case of residential building with multiple dwelling units and for other type of building, shall be as given below:
Sr. no.
Building type
Minimum permissible width of passage and corridor (in metres)
1
Residential
1.25
2
Commercial
1.25
3
Assembly Buildings
2.0
4
Educational building
2.0
5
Institutional building
2.0
6
Inland Container Depot & Custom bounded area
1.5
7
Industrial building
1.5
8
Hospital, nursing homes, etc.
2.4
9
All other building including hostels.
1.5
(3) The clear headroom height of passage and corridors shall, in no case, be less than 2.15 metres.
(4) All surfaces including ceiling shall be of fire resistance materials.
(5) All the passages and corridors shall be naturally lighted and ventilated and if not possible, provision for artificial lighting and mechanical ventilation shall be made.
[70]
7.7Ramps and Lifts
(1) Every building having more than 15 metres height shall be provided with a lift or a ramp with an inclination of 1:10 in addition to the staircases.In all residential building having more than 15 metres height, lift is mandatory to install in numbers depending on the occupancy of building.
(2) 64[In case of public building with only ground floor, ramp shall be provided for differently abled persons reaching its plinth level. Further, in case of public building more than one storey lift or ramp shall be provided, but at ground floor, ramp shall be provided for reaching plinth level of building.]
(3) Ramps:
(i) The ramp to basement and parking floors shall not be less than 7.2 metres wide for two-way traffic and 4 metres wide
64 Inserted/amended vide memo no. Misc-138A-Loose/7/5/2006-2TCP dated 22.12.2017
[68]
for one-way traffic, provided with minimum gradient of 1:10.
(ii) 65[The minimum width of the ramps in hospitals shall be 2.4 metres for movement of stretcher and for public use. In no case, the hospital ramps shall be used for vehicular movement.]
(iii) Ramps may also be provided in the setbacks which can be sloped considering unhindered movement of fire engine and in no case the gradient shall be less than 1:10. (to be read with basement)
(iv) All structural design/safety aspects as per latest Bureau of Indian Standards Codes and National Building Code, 2005 (as amended from time to time) shall be complied along with consideration of weight of Fire Engine & its manoeuvring.
(v) 66[XXXX].
(vi) A ramp shall have handrail on at least one side, and preferably two sides with minimum height of 0.90 metres, measured from the surface of the ramp. The handrails shall be smooth and extend to 0.30 metres beyond the top and bottom of the ramp. Where major traffic is predominantly children, the extra handrail shall be placed 0.76 metre height.
(4) Where ramps with gradients are necessary or desired, they shall conform to the following requirements:
A ramp when provided shall not have a slope greater than 1:20 or maximum of 1:12 for short distance up to 9 metres.
(5) Lifts: -
Wherever lift is required as per Code, provision of at least one lift shall be made for the wheel chair users, with the following cage dimensions, recommended for passenger lift of 13 persons capacity by the Bureau of Indian Standards:-
· Clear internal depth 1.1 metres.
· Clear internal width 2.0 metres.
· Entrance door width 0.9 metre.
7.6Staircase
(1) Every building intended to be used as multiple residential building or commercial or educational and institutional or industrial building shall be provided with required number of staircases (accessible from a maximum distance of 30 metres (45 metres, if building has automatic sprinklers for firefighting) from any part of the building, extending from ground floor level to the highest floor, having following specifications:
Sr. no.
Type of building
Minimum permissible clear width of staircase (in metres)
Minimum permissible width of tread (in metres)
Maximum permissible height of riser (in metres)
1
63[Residential
Upto 16.5 metres height (residential plotted)
0.9
0.25 (without nosing)
0.19]
Other than residential plotted
1.2
2
Commercial
Plots upto 50 square metres area
0.9
0.30 (without nosing)
0.15
Plots above 51 square metres area
1.2
63Substituted vide memo no. Misc-2339-ULB-Vol-II-A/7/5/2006-2TCP dated 25.04.2022. This amendment shall come into force from 25.04.2022.
[67]
3
Assembly building
2.0
0.30 (without nosing)
0.15
4
Educational building
1.5
0.30 (without nosing)
0.15
5
Institutional building
2.0
0.30 (without nosing)
0.15
6
Inland Container Depot & Custom bounded area
1.5
0.30 (without nosing)
0.15
7
Industrial building;
1.5
0.30 (without nosing)
0.15
8
Any other buildings
1.5
0.30 (without nosing)
0.15
(2) The minimum head-room in a passage under the landing of a staircase shall be 2.1 metres. The minimum clear head-room in any staircase shall be 2.1 metres.
7.17Fire
(1) 73[Fire safety protection measures shall be regulated by Haryana Fire Service Act, 2009, as amended from time to time.]
(2) The fire provisions made in the building wherever applicable, shall have to be got verified from the Competent Authority or office authorized from fire safety point of view and accordingly a certificate shall be submitted by the owner.
73Amended vide memo no. Misc-2339-VOL-III-ULB/7/5/2006-2TCP dated: 20.10.2020 and shall be implementable from date of issuance of said memo.
[79]
74[Chapter-7A: Telecom Infrastructure
(This code has been kept on suspension vide Memo No. Misc-2339-III-ULB/2024/23321-25 Dated: 26.07.2024)
7A.1 Definitions
In this Sub-Code, unless the context otherwise requires, -
(i) “Common Telecom Infrastructure (CTI)” means the facility that is housed inside the buildings and enables effective and quality access to telecommunication services.
(ii) “In-Building Solutions (IBS)” mean solutions to facilitate handling of high-speed data for providing improved quality of telecommunication services with enhanced coverage, less cell interference, adequate signal strength, optimum spectrum uses and fewer call drops.
(iii) “Licensed Service Area (LSA)” means geographical division defined by Department of Telecommunications (DoT), Ministry of Communications, Government of India.
(iv) “Telecom Enforcement Resource and Monitoring (TERM)” means the vigilance and monitoring wing of the Department of Telecommunications (DoT), Ministry of Communications, Government of India, functioning as the subordinate offices/cells of the DoT in the field.
provides any type of telecom/IT services in a building, as per scope defined by Department of Telecommunications (DoT), Ministry of Communications, Government of India.
7A.2. Applicability
This Sub-Code shall be applicable for all multi-storeyed buildings, Commercial and Mercantile Buildings, Educational Buildings,
74Inserted vide memo no. Misc-2339-ULB-III/7/5/2006-2TCPDated: 20.06.2023
[80]
Information Technology buildings, Institutional Buildings, Mixed land-use buildings as defined in Sub-Code 1.2.
7A.3. Procedure to be followed at the time of approval of Building plans.
To strengthen the quality of service of the voice and data of mobile and fiber broadband network, IBS approval/No Objection Certificate (NOC) from TERM Cell/ LSA, Haryana shall be required to be submitted alongwith application for approval of building plans for all buildings specified at Sub code 7A.2, confirming that the requisite infrastructure as per norms prescribed in National Building Code or/and guidelines issued by Department of Telecommunications (DoT), have been followed.
7.16Basement
(1) The construction of the basement shall be allowed by the Competent Authority in accordance with the provisions of Zoning Plan.
(2) The basement shall be constructed within the zoned area and may be put to following uses:
(i) Storage of household or other goods of ordinarily non-combustible material;
(ii) Strong rooms, bank cellars, etc.;
Air-conditioning equipment and other machines used for services and utilities of the building.
(iv) Modern automated laundry shall be allowed only in the basement of Hotel and Hospital/ Nursing Home sites, group housing, service apartment, as an ancillary service for the purpose for which permission is granted by Competent Authority and meant for in-house services only subject to the condition that the effluent of the laundry discharged to the main sewer;
(v) Car wash, security room, ticketing booth, driver waiting room, toilets, loading/ unloading activities, lift/ escalator lobbies and parking.
[76]
(3) The basement may be used for habitable purpose subject to fulfilment of fire safety, light & ventilation and exit provisions on opposite directions. However, in case basement is used for habitable purpose, the area utilized will be counted towards total covered area of building i.e. FAR. The basement is used for uses other than specified in Code 7.16(2) above, shall be considered for habitable use and shall be counted towards FAR, subject to fulfilment of fire safety, light and ventilation and exit provisions on opposite directions.
(4) The use of basement shall be specified in the building plans at the time of submission, stated in Code 2.1 and 2.2.
(5) The basement shall have the following provisions:
(i) Light and ventilation of basement:
(a) An open area of a minimum width of 1.8 metres shall be provided across the full length and/ or width of the basement storey. This area shall be within the limits of the site and shall be paved with impervious material above a concrete bed. It shall be completely unobstructed except that in this area steps may be allowed for access to it, if considered necessary.
(b) In the case of buildings governed by the zoning, basement storeys shall be lighted and ventilated by means of windows of the minimum area within 1/10th to 1/25th of the total floor area, at least half of which must open subject to the condition that the deficit of light and ventilation shall be made up by providing artificial lighting and mechanical ventilation as per provision of National Building Code of India.
In case of buildings governed by Architectural Control and the basement are for storage/ services, the provisions of light and ventilation shall be as shown on the control sheets. In case the basement is extended, the deficit in light and ventilation be proportionately increased subject to fulfilment of fire safety norms and structural stability is ensured by the Structural Engineer.
(d) preferably be enclosed by walls and partitions and the surface of every such walls or partition, shall be finished with a smooth impervious material to a height not less than 1.5 metres above the floor of such room; and
(e) Be provided with impervious floor covering sloping towards the drain with a suitable gradient and not towards verandah or any other room.
61 Inserted/amended vide memo no. Misc-138A-Loose/7/5/2006-2TCP dated 22.12.2017
[65]
(ii) 62 [Where the water-closet room in a building is not connected to exterior, it shall be ventilated by mechanical means or through a vertical shaft open to sky of a minimum size stated at Code 7.11(6) for ventilation to toilet, bath and water closet, but it shall be counted towards covered area.]
(iii) No room containing water-closet shall be used for any other purposes except as lavatory and no such room shall open directly into any kitchen or cooking space by a door/ window or another opening. Every room containing watercloset shall have a door completely closing the entrance to it.
(iv) Soil or ventilating pipes shall not be allowed on the exterior face of any building, provided these shall either be embedded in the walls or pipe ducts to be provided to accommodate them.
(v) Security rooms each measuring maximum area of 3.0 square metres is permitted only at the entry and exit gates of premises.
(i) No exit doorways shall be less than 1 metre in width except in assembly and institutional buildings where it shall not be less than 2 metres.
(ii) Exit doors shall open outwards, that are away from the room but shall not obstruct the travel along any exit. No door when opened shall reduce the required width of the stairway or landing to less than 0.90 metres. Overhead door shall not be installed.]
(4) In offices, Cyber Park/ IT Park/ Cyber Cities, 1.0 ECS for every 75 square metres of covered area shall be required.
(5) In shopping area and designated shopping markets being developed by competent authority, 65% of total site area shall be kept for parking purpose.
(6) In hospital, parking is to be provided as 1.0 ECS for every 2 beds and visitors parking as 1 ECS for every 4 beds.
(7) For industries, 1.0 ECS for every 300 square metres of covered area shall be provided.
(8) For Assembly buildings (i.e. stand-alone theatres, cinema houses, concert halls, auditoria and assembly halls), 1 ECS for every 40 square metres of covered area shall be provided.
(9) For primary and secondary schools, 15% of total site area shall be provided for parking purpose.
(10) For College, parking at rate of 1 ECS for every 200 square metres of covered area shall be provided.
(11) For Government or semi-public offices including Civil/ High Court, 1 ECS for every 75 square metres of covered area shall be provided.
(12) For hotels and Motels, 1.0 ECS for every 75 square metres of covered area.
(13) The covered parking in the basement or in the form of multi-level parking above ground level or stilt shall not be counted towards Floor Area Ratio (FAR). However, the footprint of separate parking building blocks shall be counted towards ground coverage.
(14) In case of provision of mechanical parking in the basement floor/ upper stories, the floor to ceiling clear height of the basement/ floor may be maximum of 4.75 metres.
(15) No storage and commercial activities shall be permitted in the covered parking areas.
(16) The misuse of the covered parking space shall immediately attract levy of three times the penalty of the composition fee prescribed for the excess covered area in the respective category.
[60]
Note [applicable for sr. no. I (2) to (16)]:
1ECS = 23 square metres for open parking, 28 square metres for parking on stilts and 32 square metres for basement parking.]
7.1a 56[Party wall
(1) In case the plot holder intends to construct a common boundary wall with minimum width of 230mm, he/ she shall be required to submit consent of owners of adjacent plots with which his/ her plot shares a common boundary i.e. the plot on both sides and rear.
(2) Wherever the plot holder opts for independent boundary wall within his/ her plot boundary:
(i) Independent boundary wall shall be allowed only where adjacent plots are vacant.
(ii) The owner shall ensure that no part of foundation and boundary wall is constructed on the adjoining plot.]
(i) a handrail not less than0.6-metre-long and 1 metre above floor level shall be fixed adjacent to the control panel.
65 Inserted/amended vide memo no. Misc-138A-Loose/7/5/2006-2TCP dated 22.12.2017
66 Deleted vide memo no. Misc-138A-Loose/7/5/2006-2TCP dated 22.12.2017
[69]
(ii) the minimum size of lift lobby shall be 1.8 metres x 2.0 metres or more.
(iii) the interior of the cage shall be provided with Braille symbols and auditor signage that audibly indicates the floor. When the cage reached on floor, it shall indicate that the door of the cage for entrance/ exit is either open or closed.
(3) The maximum numbers of risers in single flight are limited to 14.
(4) If a service or a spiral staircase is provided, its width shall not be less than 1.0 metre and its average tread width shall not be less than mention in table of sub-Code (1).
(5) Notwithstanding anything contained in sub-Code (1), the staircases in the private portion of a public building and industrial building not open to the general public, may be of the sizes mentioned for residential building.
(6) For residential plot sizes upto 100 square metres, there is no restriction for maximum permissible height of riser, subject to the condition that it shall not cause inconvenience to user.
For providing In-Building Solutions (IBS) for Common Telecom Infrastructure (CTI) in buildings specified at Sub-Code 7A.2, the owner/builder/Resident Welfare Association (RWA) shall be mandated to ensure adherence to the following conditions, which shall be imposed at the time of approval of building plans: -
i. There should be properly demarcated sections within buildings and on roof tops for housing Broadband/Digital Connectivity Infrastructure/Antenna. These areas should have access to power supply for reliable and always-on services.
ii. Access to building as well as CTI facilities inside the building should be available on fair, transparent and non- discriminatory manner to all service providers for provisioning as well as for maintenance purposes.
iii. No person shall obstruct and object to laying of CTI by Telecom Service Provider (TSP). The CTI shall be allowed to be shared by subsequent TSPs on the terms as may be decided by Telecom Enforcement Resource and Monitoring (TERM) Cell/Licensed Service Area (LSA), Haryana.
[81]
iv. The permission to in-building access and/ or CTI facilities inside the building shall not be seen as a source of revenue generation for owner(s)/builder(s)/RWA(s) but as a means for facilitating penetration of broadband access and thereby helping in socio-economic growth of all the residents.
v. Charges (rentals/power rates etc.) levied on the TSP should be fair, transparent and non-discriminatory and should be on residential rates.
7A.4. Procedure to be followed at the time of grant of Occupation Certificate
Occupation Certificate of buildings specified at Sub code 7A.2 shall be issued after ensuring IBS NOC from TERM Cell/ LSA, Haryana regarding laying of requisite infrastructure as per norms prescribed in National Building Code or/and guidelines issued by Department of Telecommunications (DoT). ]
[82]
In the second basement and basement below the lower ground floor where it is to be used for parking/ services, the provisions contained in National Building Code and Fire Safety Codes as applicable shall be followed. The basement story for any other
[77]
purpose conforming to the land of the site can be allowed.
(c) Adequate ventilation shall be provided for the basement. The ventilation requirements shall be the same as required by the particular occupancy according to Code. Any deficiency may be met by providing adequate mechanical ventilation in the form of blowers, exhaust fans, air-conditioning systems, etc.;
(ii) Damp proofing of basement:
The walls of the basement story shall be properly damp proofed and if in contact with the soil, they must be effectively secured against dampness from the soil with the approved vertical and horizontal damp proof course.
(iii) Height of the basement:
(a) The minimum clear height of the basement shall be 2.4 metres and maximum clear height of the basement shall be up to 4.75 metres from floor to the underside of the roof slab or ceiling subject to structural stability to be certified by the Structural Engineer.
(b) 72[The minimum height of the roof of basement shall be 0.45 metres (with mechanical ventilation/cutout in stilts) and maximum 1.5 metres above the average surrounding ground level for plots upto 1000 square metres.]
(c) For plots above 1000 square metres, the roof of basement shall be either flushed with ground or the maximum height shall be 1.5 metres above the average surrounding ground level.
(iv) Drainage of basement:
(a) Open area adjoining a basement story, if any, shall be effectively drained to the satisfaction of the Competent Authority:
(b) The responsibility of draining a basement storey and for protecting it from rain shall be that of the owner.
(c) The access to the basement shall be separate from the main and alternative staircase providing access and exit from higher floors.
72 Substituted vide memo no. Misc-2339 (ULB)-Vol-III/SD(BS)/7/5/2006-2TCP dated 08.05.2018
[78]
(d) Where the staircase is continuous in the case of buildings served by more than one staircase, the same shall be of enclosed type serving as a fire separation from the basement floor and higher floors. Open ramps shall be permitted if they are constructed within the building line subject to the provision of Code 7.9.
(e) The “Exit” requirements in basements shall comply with the provisions of Part 4 ‘Fire and Life Safety’ of National Building Code of India.
(6) Basement shall not be constructed beyond the zoned area or in case existing adjacent building, setback of 2.4 metres shall be taken from the existing adjacent building.
7.13Mezzanine floor
(1) A mezzanine floor or internal balcony shall not be permitted unless the height of the room is at least 5.0 metres and such mezzanine floor or balcony do not cover more than 1/2of the room area. The area of such mezzanine floor shall be counted towards FAR.
(2) The clear height of such mezzanine floor or internal balcony shall not be less than 2.3 metres from the floor level to the soffit of ceiling.
70Substituted vide memo no. Misc-2339-ULB-Vol-I/7/20/2024-2TCP dated06.11.2024
71Substituted vide memo no. Misc-2339-ULB-Vol-II-A/7/5/2006-2TCP dated 25.04.2022. This amendment shall come into force from 25.04.2022.
[75]
7.14 Motor Garage
(1) The minimum size of a private motor garage shall be 2.75 metres X 5.0 metres. The clear height of the garage shall not be less than 2.40 metres. The plinth of the motor garage shall not be less than 150 mm above the average ground level.
(2) A garage shall be permitted within zoned area and shall be counted towards covered area.
(3) Garage shall not be used for habitable purposes.
7.15 Minimum provisions with regard to dwelling unit
granting permission to construct or use/ occupy:
Economic Weaker Section (EWS)
Other than EWS
(i) Living/ bedrooms;
(i) Living/ bedrooms;
(ii) One Pantry;
(ii) One kitchen;
(iii) One Bathroom and water closet
(iii) One Bathroom and One latrine or
(W.C) integrated
W.C integrated.
7.10Means of Access
(1) No Building shall be erected as to deprive any other building of its means of access.
(2) If there are any bends or curves in the approach road, sufficient width shall be permitted at the curve to enable the fire tenders to turn, the turning circle shall be at least of 9.0 metres radius.
(3) Other provisions of means of access for buildings other than plotted residential and commercial:
(i) The approach to the building and open spaces on its all sides upto 6.0 metres width, shall have composition of hard surface capable of taking the weight of fire tender, weighing upto 22 tonnes for low rise building and 45 tonnes for building 15 metres and above in height. The said open space shall be kept free of obstructions and shall be motor-able.
(ii) Main entrance to the premises shall be of adequate width to allow easy access to the fire tender and in no case, it shall measure less than 6.0 metres. The entrance gate shall fold/ slide back against the compound wall of the premises, thus leaving the exterior access way within the plot free for movement of the fire service vehicles. If archway is provided over the main entrance, the height of the archway shall not be of height less than 5.0 metres.
[72]
(iii) In case of basement extending beyond the building line, it shall be capable of taking load of 45 tonnes for a building of height 15.0 metres and above and 22 tonnes for building height less than 15.0 metres.
(4) Every person who applies for permission for erection or reerection of building shall also submit NOC for accessing the road (whether National Highway, State Highway) if applicable from the concerned authority.
Light and Ventilation of building
(1) Every room that is intended for human habitation shall abut on an interior or exterior open space or on to a verandah open to such interior or exterior open space.
(2) The setback area can be sunk for light, ventilation and access to basement, provided fire tender movement is not hindered.
(3) The whole or part of one side of one or more rooms intended for human habitation and not abutting on either the front, rear or side open spaces shall abut on an interior open space whose minimum width in all directions shall be 3.0 metres in case of buildings not more than 15 metres in height, and in case of buildings above 15 metres, the provision of Code 7.2 (1) shall apply.
(4) Sunken courtyard up to the lowest floor of basement(s) shall be allowed as ‘light well’ within building envelop for light and ventilation for basement area.
(5) 68[Other provisions of light and ventilation for buildings other than plotted residential and commercial 69[and industrial:] If exterior open-air space is intended to be used for the benefit of more than one building on same plot/ site, then the width of such open-air space shall be the one specified for the tallest building abutting on such open-air space, shall be as given below:
Sr. no.
Height of Building (in metres) upto
Exterior open spaces to be left on all sides of building blocks (in metres) (front, rear and sides in each plot)
1.
10
3
2.
15
5
68 Inserted/amended vide memo no. Misc-138A-Loose/7/5/2006-2TCP dated 22.12.2017
69Inserted/amended vide memo no. Misc-2339-ULB-Vol-II-A/7/5/2006-2TCP dated 25.04.2022. This amendment shall come into force from 25.04.2022.
[73]
Sr. no.
Height of Building (in metres) upto
Exterior open spaces to be left on all sides of building blocks (in metres) (front, rear and sides in each plot)
3.
18
6
4.
21
7
5.
24
8
6.
27
9
7.
30
10
8.
35
11
9.
40
12
10.
45
13
11.
50
14
12.
55 and above
16]
(6) Ventilation shaft:
For ventilating the spaces for water closets and bathrooms, if not opening on the front side, rear and interior open spaces, shall open on the ventilation shaft, the size of which shall not be less than the values given below:
Sr. no.
Height of Building (in metres)
Minimum size of Ventilation Shaft (in square metres)
Minimum width of Shaft (in metres)
1.
Upto 10.0
1.2
0.9
2.
Upto 12.0
2.8
1.2
3.
Upto 18.0
4.0
1.5
4.
Upto 24.0
5.4
1.8
5.
Upto 30.0
8.0
2.4
6.
Above 30.0
9.0
3.0
Note:
(i) For buildings above 30.0 metres height, mechanical ventilation system shall be installed on ventilation shaft.
(ii) For fully air-conditioned buildings the ventilation shaft shall not be required, provided the air-conditioning system works on uninterrupted source of power supply.
[74]
7.12
(iii) 70[Horizontal ducting for ventilation may be installed in building with exhaust fan of appropriate capacity for discharging used air to external face of building. In such cases, provision of ventilation shafts as mentioned at Sub Code 6 of code 7.11 shall not be required.]
Cantilevered roof and chajja projections
(1) No building verandah, chajja or other projections from the face of the building shall be allowed to be erected or re-erected on or over a road or beyond the boundaries of the applicants own land/ plot.
(2) 71[Balcony of a width of maximum 1.80 metres in front and rear sides of a plot can be permitted within the plot. No Balcony beyond the rear zoning shall be permitted.]
(3) On plots of the size of 300 square metres or above, where side setback has been provided, a balcony of maximum width of 1.0 metre, in side set back shall be permitted.
(4) Sun-shades over opening shall be allowed subject to the following:-
(i) Sun-shade of 0.23 metre width is permitted over any road/ over any park/ public place.
(ii) Sun-shade if provided, shall be at a height of 2.3 metres from the ground level shall be permitted to project up to a maximum of 0.45 metre within the applicants own land, provided it does not exceed half of the width of setback/open space.