i. Waste Water Treatment: Design an on-site treatment system to handle 100% of waste water generated in the building, to the quality standards suitable for reuse, as prescribed by Central (or) State Pollution Control Board, as applicable.
ii. Waste Water Reuse: Use treated waste water for at least 25% of the total water required for landscaping, flushing, and cooling tower make-up water (if the project uses water-cooled chillers).The treated waste water could be used for landscaping, flushing and air-conditioning.
-
Waste water here refers to both grey and black water
-
Waste water can be treated in-situ and reused in-situ
-
In case the local authorities insist the project to divert waste water to a centralized/ common waste water treatment plant, then the project can show compliance, by reusing treated wastewater from the centralized/ common/ any other waste water treatment plant
-
Treated waste water from other sites/ local authorities through permanent piped connections or other means can also be considered to show compliance
-
Captured rain water can also be considered to show compliance
-
The water requirement and average number of watering days for landscaping shall be considered as 6 liters per sq.m. per day (i.e. 6 liters/ sq.m./ day) for a minimum of 300 days (or) Justify if the water requirement and the average number of watering days for landscaping is less than the above requirement.