Wastes generated from building materials, debris and rubble resulting from construction, remodelling, repair and demolition operation is termed as C&D waste. It excludes steel, aluminium, wood and other components currently being salvaged for reuse or recycling. In exercise of the powers vested under section 256 of Karnataka Municipal Corporations Act , 1976 (Karnataka Act, 14 of 1977) and enabling provisions U /s 257 and 260 of the said Act, a public notification regarding separate collection and disposal of Construction and Demolition Waste or Debris within the BBMP area , w.e.f. 01-03-2016 along with the guidelines have been issued.
BANGALOE AUTHORITY ★
As per BBMP and other studies it is estimated that around 1500-2000 TPD of C&D waste is generated daily in Bengaluru as of 2016. To manage the C&D waste BBMP has identified seven C&D waste management site for BBMP zones.
Table 12-4Approved C&D waste management sites designated by BBMP for each zone
Sl No.
Name of the location
Address
Extent of area in acres
Nearby zone
01.
Mallasandra
Sy. No. 33, Mallasandra grama, Yeshwanthpura hobli Bangalore, North Taluk
Sy No. 15, Srinivasapura & Kogilu grama, Yelahanka Hobli, Bangalore North Taluk
10
Yelahanka
04.
Gollahalli
Sy No. 58, Gollahalli grama, Uttarahalli Hobli, Bangalore South Taluk
60
Bommanahalli & South
05.
Kannur
Sy. No. 50, Kannur grama, Bidhrahalli hobli, Bangalore East Taluk
50
East
06.
Guddadahalli
Sy.No. 43, Guddadahalli grama, Hesaraghatta hobli, Bangalore North Taluk
46.31
Dasarahalli
07.
Mittaganahalli
Sy.No. 02, Mittaganahalli grama, Bidhrahalli hobli, Bangalore East Taluk
10
East/Mahade vpura
Source: BBMP
Chapter 12Physical and Social Infrastructure
12.1 Water and Waste Water
The water availability for meeting the future demands of Bengaluru for the master plan period and beyond was one of the concerns expressed by some citizens during the public consultations. By all accounts, the availability of surface water (synonym as Cauvery water) has not affected the growth of city (in terms of population and spatial). Having said that Bengaluru is at the situation where the only surface water source available to city (River Cauvery) is legally getting exhausted and dependency on ground water is growing. Will the city continue to grow? probably yes – for the fact that Bengaluru has become self-sustaining economic growth centre in entire state of Karnataka. Even if the policy decision is taken to reduce the pressure on Bengaluru by developing counter magnets, the real impact would only be visible after decade or two, provided all policy initiatives are implemented in time bound manner.
Water would be required for future population in Bengaluru – during the master plan period (2031) and beyond. It is indeed a fact that city is to face water shortage in future even after having exhausted the only surface water source, thereby increasing the dependency on ground water much more than today. The situation is likely to persist in future, the only difference being the spatial impact. The water is likely to be available and supplied to entire of BBMP by master plan period, it is the adjoining villages with Bengaluru Metropolitan Area, that are likely to get urbanised over next 15 years. How we reduce the water demand and manage the water demand is going to be most important aspect in utilising existing resources to providing safe drinking water to fellow city residents. The implementation of dual pipeline system and use of recycled water for non-potable activities for all future developments is likely bring substantial reduction in potable water demand, thereby dependency on resources. Further, social acceptability of use of recycled yet potable water would completely change the water dynamics in the city. However, this is possible only if the of water supply and sewage system covers the entire planning area.
Located at 950 Mean Sea Level Bengaluru is only metropolitan city which is not abutting to any major surface water source (River). Bangalore Water Supply and Sewerage Board (BWSSB) formed in 1964 under BWSSB Act, 1964 is mandated to provide water supply and sewage systems primarily within the BBMP (708.5 sqkm). However in the Bengaluru Metropolitan Area (admeasuring 1294 sqkm), in addition to BBMP, there are 51 Gram Panchayat’s (with 251 villages having spatial extent of 583 sqkm) served by Panachayath Raj Engineering Department (RDPR/ PRED). At present BWSSB is extending the water supply and sewage network to entire BBMP area and is expected to complete the works by 2021. However, there is no coverage of water supply and sewage network in many areas already urbanised and under process of urbanisation outside the BBMP Limits. These areas are expected to get further urbanised by 2031 with planned development as envisaged under Revised Master Plan - 2031. It is therefore recommended that BWSSSB provide support to RDPR in planning for water supply and sewerage network for entire BMA, for the fact that existing/ planned systems
BANGALOE AUTHORITY ★
within BBMP will have to be integrated/ extended to villages outside BBMP. This is to help in designing and implementing the integrated networks across BMA.
As per Census, BBMP has a population of 8.4 Million (93% of BMA) whereas the rest of 251 villages together hold 0.7 million persons, thus a total of ~9.1 million in BMA. The population projections for RMP 2031 suggests that population within BMA is expected to reach ~20 million by 2031, thereby, making Bengaluru the third most populous city in the country.
At present BWSSB is withdrawing about 19 TMC of water (1470 MLD) from Cauvery to meet city’s water demand. The Plan/ work is on for getting additional 10 TMC (775 MLD) of water as accorded by the Cauvery Tribunal to meet the water demand for BBMP area alone. Thus, altogether about 29 TMC (2250 MLD) of water is available for Bengaluru from Cauvery. Though Unaccounted for Water amounts to 46%, the actual water losses (transmission, leaks, treatment and distribution) are around 15-18%. Also, network coverage (both water supply and sewage) in the city is limited and work is in progress to get entire BBMP covered by 2021.
The water demand has been established considering 135 LPCD supply to the population. Non-domestic water demand for potable purposes has been established considering 45 lpcd for estimated work force. Equal amount of non-potable water has been considered for non-domestic sector to establish the total non-domestic demand. The net water demand including water demand for non-domestic activities has been estimated at 3639MLD for the projected population of 20.3 million for BMA by 2031. The net demand of 3639MLD translates to the total gross water requirement for BMA at 4282 MLD considering 15% losses towards transmission & distribution.
As mentioned earlier, dual pipeline system for use of recycled water would reduce the overall water demand for potable water. If the water supply is split (within plot/ site) into two – potable (@90 lpcd) and non-potable (45lpcd) then the water demand for potable water can be reduced by 865 MLD. However, still there will be water shortage of about 862MLD [refer table 2]. This water shortage likely to be met through Ground Water, thereby increasing the dependency on ground water from present level 677 MLD to 862 MLD (about 27% (185MLD) higher than present levels). It may be noted that due to change of land use from Agriculture to urban activities within BMA, the water withdrawal for current agriculture activities to the tune of 100-150 MLD would be available for urban activities. This is with the assumption that present over draft will continue. Thus, the status of ground water dependence in 2031 would be of the similar scale as it is at present.
To meet the future water demand following are the master plan suggestions:
Providing Infrastructure across the Planning Area: Being a public utility, providing water to the public has a vital interest in its functioning and wellness of the society. More than 27% of water supplied by BWSSB is among the BPL and EWS of the society and is provided free of charge. BWSSB has coverage of 575 sq.km area out of 710 sq.kms of BBMP. The rest 135 Sq.km under 110 villages is expected to be covered by 2021. However, rest of the planning are outside BBMP are not covered by BWSSB, and it is imperative to improve the coverage to not only within BBMP but also in villages outside BBMP falling within BMA. It is therefore recommended to institutionalise the planned water supply and sewage network out BBMP as well to reduce the dependency on ground water.
★
Dual pipe line for drinking and other purposes for the newly planned areas and additional population. On implementation of Dual pipeline, Government has to take measures to supply Cauvery water for all the purposes for population expected to be living in the BBMP in existing establishments and for only potable purposes for the population residing in any new developments in BBMP area which need to be developed on the basis of zero liquid discharge policy. Similarly, dual pipeline system shall cater to additional population expected to be residing in 251 villages of BMA with only potable water demand being supplied by Government infrastructure. This initiative could minimize additional water requirement significantly but it is difficult to make an assessment of the same at master plan level. As per IS 1172, out of a total per capita demand of 135-200 lpcd, a flushing water requirement of 45 lpcd may be taken for flushing requirements and the remaining quantity for other domestic purposes. However, other non-potable water uses may include gardening, washing etc. Recycled water has to be made available for non-domestic purposes and non-drinking purposes in the 251 villages where the new supply network is planned. Even after realising 865mld of treated recycled water and additional about 2000mld recycled water would be available, which can be utilised for revival of lakes and valley system. Using innovative systems like artificial aquifer recharge would help in improve the ground water levels.
Water Conservation: Over 50% of the population of the project population of 2031 has been assumed to be supplied potable water @135lpcd; however there is a strong potential for reducing this demand of 135lpcd through promoting awareness for water conservation, implementation of decentralised sewerage treatment plants for the local area, which can be utilised for gardening, horticulture purposes and other activities like car washing. This would lead to reduction in potable water demand to 120lpcd, which translate to saving of about 166MLD. Thereby bringing down the dependence on ground water below the present level.
Treating Recycled Water to Potable Level: The fact that Cauvery will not be adequate for city and relishing water from other sources is still to determined, it is proposed to recycle the sewage water with tertiary treatment technologies available in the market and supply to the city for all the purposes.
Evaluation of Proposals of Thyagaraja Committee: For long term purposes some of the major interventions proposed by the Thyagaraja Committee to explore new sources have to be considered by the state government on priority basis.
Rejuvenation of Lake and Valley System: The lake and valley system has been historically water supply source, however due to limited sewage network coverage; most of the lakes are filled with sewage. The improved coverage of sewage network is expected to improve the quality of water flowing into lakes. In addition to that recycled water shall be used to rejuvenate the lakes along with dredging of some of large lake to improve the holding capacities and aid ground water percolation. Adequate sewage network and infrastructure shall be developed to contain the sewage flow into lakes and streams.
Towards provision of land for water and sewage infrastructure, the Master Plan has incorporated the proposals provided by BWSSB for BBMP area and are appropriated depicted in proposed land use maps.
BANGALOE AUTHORITY ★
12.2Municipal Solid Waste
Solid Waste Management (SWM) is an obligatory function of the BBMP and is governed by the Solid Waste Management Rules, 2016 (“SWM Rules”) and several court directives. In BMA, which comprises of BBMP and around 50 Gram Panchayats, there is no single unified authority for the waste management. BBMP is looking after the waste management within its jurisdiction, while the rest of the area, which is administered by different Gram Panchayath’s, concerned Gram Panchayath is responsible for waste management in their respective jurisdictions.
BBMP is in the midst of transforming its waste management system from centralised to a decentralised one. Going forward with the decentralized approach, in BBMP area, SWM facilities have been substantially provisioned at the ward, zone and city level. BBMP looks after the collection, transportation, segregation, processing, treatment and disposal of solid waste in the city of Bengaluru. BBMP has established dry waste collection centres, enhanced solid waste collection and transportation activity, mechanical sweeping, bulk waste management and waste processing units using modern technologies like bio-methanation waste to energy plants and vermi-composting facilities.
Essentially, BBMP is aiming at The Integrated Solid Waste Management (ISWM) System – a waste management hierarchy (refer Figure 12-1), to ensure reduction in the amount of waste being disposed (Landfill waste) and maximise resource recovery and efficiency.
Figure 12-1: Integrated Solid Waste Management System Hierarchy
Most Preferred
At Source Reduction & Reuse
Waste minimisation and sustainable use/multi use of products (e.g. reuse of carry bags/packaging jars)
Recovering energy before final disposal of waste (e.g. RDF, biomethanation, co-processing of combustible non-biodegradable dry fraction of MSW, incineration)
Landfills
Safe disposal of inert residual waste at sanitary landfills
In Panchayath areas within BMA, reliable information about the management of waste is not readly available. However, the comprehensive socio-economic household survey suggests that 14% of the households in these villages have access to waste collection system. Hence, the existing Status on Solid Waste is limited to BBMP. However, forecasts and demand estimates are for the entire BMA
(including part of BMICAPA). In view of the above, to attain a sustainable solid waste management system in Bengaluru, BBMP has adopted the following Approach and Strategies within its jurisdiction.
a) The Approach:
Reduce – Reuse – Recycle (3R approach): The 3R Approach is aimed at optimising SWM management from all the waste-generating sectors and involving all the stakeholders (waste generators, service providers, informal sector, regulators, government, and community or neighbourhoods). The adoption of 3R minimizes the waste being handled by the local bodies (BBMP/GPs), minimizing public health and environment risk associated with it.
b) Strategies:
Decentralised SWM Systems: In order to reduce the burden of unscientific handling of large volumes of MSW, the city has opted to shift its focus from a centralised ‘single stream’ collection and ‘Landfill disposal’ system to a decentralised ‘multiple stream’ collection and scientific ‘Processing’ system.
Separating Bulk Generators: Bulk Generators contribute to 25% of the city’s waste and have been separated from the regular collection cycle. They include domestic generators - apartment complexes with more than 50 units and Commercial bulk generators viz. hotel/ restaurant, clubs, factory, choultry, mall, shopping complex, marriage halls, convention hall, place of worship, institution, office establishment, railway stations, bus stand or any other commercial or public entity which accumulates MSW of a quantity not less than 10 kg per day. These generators are being mandated to set up in-situ systems or link with BBMP empanelled vendors to manage their waste.
Micro plan: A Micro Plan is a process of creating a solid waste management plan for the smallest unit of management, by splitting the ward into blocks (750 Households + shops). City-wide implementation of the micro SWM plan is already being rolled out in the BBMP area.
The master plan proposes that similar approach and strategies be followed by respective Gram Panchayats in consultation with various stakeholders including ward committees and SWM experts within LPA of BDA for better synchronisation synergies and optimisation of resources. With this background, the RMP 2031 has analysed the existing status of SWM within BMA and has formulated the proposals for allocation of land for SWM facilities in consultation with BBMP.
12.2.1 Municipal Solid Waste Generation
As per the assessment and quantification of municipal solid waste generation carried out by BBMP in the year 2016, the waste generation rate in BBMP area is approximately 564 grams/capita/day (gcpd). In addition, the villages administered by the Gram Panchayath’s are expected to get further urbanised/ populated by 2031 with planned development as envisaged by RMP-2031 and therefore, similar estimates have been made for areas outside BBMP.
AUTHORITY ★
RMP 2031 has considered waste generation growth rate at 1.3% per annum on the base of 564 gcpd to estimate per capita waste generation by 2031. RMP 2031 estimates that about 13911 tonnes per day of Municipal Solid Waste (MSW) will be generated in BMA by the year 2031 (Table 12-1).
Table 12-1Waste Generation Estimates for BMA
Year
MSW gpcd@1.3%growth p.a.
BBMP Area (8 zones; 198 wards)
Outside BBMP Area (50 Gram Panchayath's; 251 Villages)
BMA (BBMP area + Villages)
Projected Population
MSW generation (TPD)
Projected Population
MSW generation (TPD)
Projected Population
MSW generation (TPD)
2016
564
10207062
5757
844837
476
11051899
6233
2021E
602
12164520
7318
1386925
834
13551445
8153
2026E
642
14026694
9002
2590119
1662
16616813
10664
2031E
685
15480378
10597
4840427
3314
20320805
13911
Source: BBMP
-gpcd: gram per capita per day (as per 2016 waste assessment carried out by BBMP)
-gpcd for BMA is calculated as per gpcd considered for BBMP area
-TPD: Tonnes per day
-Municipal Solid Waste (MSW) comprises of: Residential HH; Small commercial establishments, Bulk generators; Street Sweeping
-MSW excludes Construction & Demolition Waste [estimated to be around 1500 to 2000 TPD (2016 assessment) E-estimates
12.2.2 Waste Streams & Composition – BMA
In line with the SWM Rules 2016 and micro assessment carried out by BBMP, the 4 basic streams of waste identified are as follows. Subsequently, the waste composition for BMA (assuming same for outside BBMP area) is depicted in Figure 12-2.
Wet Waste: Any organic material that can be degraded by micro-organisms into simpler stable compounds. It includes household kitchen waste, food waste from small hotels and bakeries and garden waste.
Dry Waste: Waste other than food waste and inert and includes recyclable waste, non-recyclable waste, combustible waste and sanitary waste
Domestic Hazardous Waste: comprises sanitary and bio-medical waste. This includes hygiene products like sanitary napkins and baby or adult diapers contaminated with blood, urine and faeces; and bandages and sharp objects like syringes and needles
Inert/Reject Waste: includes street sweeping inert (like silt from drains) and post processing rejects from the wet waste processing units or dry waste collection centres. It does not refer to mixed waste or construction and debris waste.
In addition, other waste streams that are being addressed in terms of segregating, collecting and processing are:
• Coconut Waste: This includes the exterior shell of tender coconut left over after the water is consumed
Leaf/Garden Waste: This is all horticulture waste and includes leaf litter, garden pruning, and branch cuttings.
Figure 12-2: Waste Composition - BMA
The waste composition is the basis of projections-stream wise projections for entire BMA. Table 12-2 provides the estimated quantum of wet, dry, domestic hazardous and reject waste generation in the year 2031.
Table 12-2Projected Composition of Total solid waste for 2031 - BMA
As per the High court directive dated 17 December 2015, 3-way segregation at source (wet, domestic hazardous & dry) for domestic generators and 2-way segregation for commercial generators was mandated and is being implemented.
AUTHORITY ★
Figure 12-3: Waste Segregation Guidelines
Source: BBMP
Primary collection & transportation involves three activities - wet and domestic hazardous waste collection (daily), dry waste collection (bi-weekly) and street sweeping (frequency based on road width)
Figure 12-4: Waste Collection & Transportation Process
★
Dry Waste: For recycling of Dry waste in the city, at present there are 196 Dry Waste Collection Centers (DWCC), 1 per ward and large aggregators as per zonal requirement. Out of 27% of dry waste generated in the city, only 36% of it is currently processed. Figure 12-5 presents the Dry waste flow.
Figure 12-5: Dry Waste Flow
Wet Waste: For city level processing of wet waste, at present there are 11 bio-methanation units (BMU), 7 organic waste converters (OWC) as per ward requirement – small hotels and markets and windrow composting in 9 integrated waste processing plants (IWPP) at the zone level. At present, out of 64% of the total wet waste generated in the city 92.5% is processed in IWPP, 7% in BMU and 0.25% in OWC’s.
Figure 12-6: Wet Waste Flow
BANGALOE AUTHORITY ★
Domestic Hazardous Waste: At present, out of 3% of the total domestic hazardous waste generated in the city, only 1% of the waste is processed by existing biomedical waste processing agencies.
Inert/Reject Waste: At present, 6% of the total waste generated in the city is inert waste, meaning waste that cannot be further processed or utilized in any other form. This waste is usually termed as Landfill waste as it is disposed of in a sanitary landfill.
12.2.4 Waste Disposal
Although Inert waste comprise 6% of the total waste generated at present and the waste to be landfilled should be approx. 10-12% of the total waste however, taking into account post-processing rejects from the wet waste processing units or dry waste collection centres including unprocessed dry waste (~17%) along with construction and debris waste altogether, make up to over 25-30% of the waste going to Landfill.
(a) Processing of Domestic Hazardous Waste generated:
The segregated domestic hazardous Waste (including sanitary waste) will be collected from drop-off locations/points (DWCCs) and further processed by existing biomedical waste processing agencies. The facilities include incinerators, Autoclaves, Shredders and Effluent Treatment Plants to scientifically dispose this waste. There are 3 units to manage bio-medical waste in Bengaluru: 1) SembRamky Environmental Management Pvt. Ltd. 2) Maridi Eco Industries Pvt. Ltd. 3) Anu Autoclave
(b) Lorry Point/Transfer Stations:
A Lorry Point is a point where the transfer of waste takes place from the Primary to the Secondary vehicle, within a ward. These are usually located by the side of the road, vacant sites and in front of decentralised waste facilities. At present, there are 340 lorry points throughout the city. As these Lorry points are informally located within wards, they result in several issues such as garbage on
ground, creation of black spots, resident opposition, etc. Therefore, the city aims to move from multiple informal points to a single built transfer station per ward.
(c) Disposal of Inert/Rejects (Landfill Waste):
BBMP has identified 3 abandoned quarries, which are currently been designed as Sanitary Landfills. It will receive only the following types of waste:
Comingled waste (mixed waste) not found suitable for waste processing
• Pre-processing and post-processing rejects from waste processing sites
• Non-hazardous waste not being processed or recycled
As per BBMP, the three Landfills available have a total capacity of approx. 1460 TPD. Significantly, this capacity can address the quantum of waste to be landfilled upto 2031. However, this is a farfetched assumption as this is only feasible if the rejects/inerts to be landfilled are 10-12% of the total waste generated, which in its entirety is dependent on factors such as:
100% Segregation of waste
Waste processing/treatment achieved as per ISWM hierarchy, SWM rules 2016
High recycling and waste diversion rate
Processing and disposal of Construction & Debris Waste as per C&D rules, 2016
Moreover, keeping in view the fact that finding new sanitary landfill sites in Bengaluru is becoming extremely difficult, there is no option, but to resort to the strategy (decentralized) as developed by BBMP at the micro-level. This in turn, has led to the need for a new approach in Solid Waste Management as the city plans its shift towards ‘A Future with No Landfills’.
Facilities required by 2031: Table 12-3 presents the facilities required with BMA for Waste Segregation, Collection & Transportation.
Table 12-3Proposed Units for processing of Dry waste generated
Particulars
No.s
DWCC (3 TPD to 5TPD) @240 to 480 sqm
470
Aggregators (50 TPD @ 1200 sq.m)
19
BMU (5 TPD @ 600 sq.m)
12
OWC (1 TPD @ 220 sq.m)
85
IWPP (500 TPD @ 97125 sq.m)
8
Source: BBMP and RMP 2031
Landfill area requirement: Considering active period of the Landfill as 20 years, it is estimated that about 220 ha of land (25% additional services) will be required to landfill the rejects generated in BBMP area. These estimates have been made by taking into consideration the waste being landfilled at 25% of the total waste during (2011-2018) after which computations have been made keeping in view the ongoing interventions (decentralized approach), if successful will yield only 12% of rejects from the total quantum of waste generated.