Wastes generated from building materials, debris and rubble resulting from construction, remodelling, repair and demolition operation is termed as C&D waste. It excludes steel, aluminium, wood and other components currently being salvaged for reuse or recycling. In exercise of the powers vested under section 256 of Karnataka Municipal Corporations Act , 1976 (Karnataka Act, 14 of 1977) and enabling provisions U /s 257 and 260 of the said Act, a public notification regarding separate collection and disposal of Construction and Demolition Waste or Debris within the BBMP area , w.e.f. 01-03-2016 along with the guidelines have been issued.
BANGALOE AUTHORITY ★
As per BBMP and other studies it is estimated that around 1500-2000 TPD of C&D waste is generated daily in Bengaluru as of 2016. To manage the C&D waste BBMP has identified seven C&D waste management site for BBMP zones.
Table 12-4Approved C&D waste management sites designated by BBMP for each zone
Sl No.
Name of the location
Address
Extent of area in acres
Nearby zone
01.
Mallasandra
Sy. No. 33, Mallasandra grama, Yeshwanthpura hobli Bangalore, North Taluk
Sy No. 15, Srinivasapura & Kogilu grama, Yelahanka Hobli, Bangalore North Taluk
10
Yelahanka
04.
Gollahalli
Sy No. 58, Gollahalli grama, Uttarahalli Hobli, Bangalore South Taluk
60
Bommanahalli & South
05.
Kannur
Sy. No. 50, Kannur grama, Bidhrahalli hobli, Bangalore East Taluk
50
East
06.
Guddadahalli
Sy.No. 43, Guddadahalli grama, Hesaraghatta hobli, Bangalore North Taluk
46.31
Dasarahalli
07.
Mittaganahalli
Sy.No. 02, Mittaganahalli grama, Bidhrahalli hobli, Bangalore East Taluk
10
East/Mahade vpura
Source: BBMP
12.4Power Infrastructure
12.4.1 Existing Situation and Trends
Bengaluru, with almost one third of state’s demand/ consumption is the largest power consumption centre in Karnataka. With the rapid change and growth in Bengaluru the demand for power supply is also ever growing. Karnataka Power Transmission Corporation Limited (KPTCL) and Bangalore Electricity Supply Company Limited (BESCOM) are responsible for powering Bengaluru city. While KPTCL is responsible for transmission (upto and including 66kv lines), BESCOM is responsible for distribution and supply (below 66kv lines).
BESCOM has 3 operating Zones – Bengaluru Metropolitan Area Zone (BMAZ), Bengaluru Rural Area Zone and Chitradurga Zone. BMA is covered by BESCOM BMAZ and BRAZ. BMAZ of BESCOM is divided into twelve divisions which includes – i) Indiranagar, ii) Shivajinagar, iii) Vidhanasoudha, iv) Hebbal, v) Malleshwaram, vi) Peenya, vii) H.S.R. Layout, viii) Jayanagar, ix) Koramangala, x) Kengeri, xi) Rajajinagar and xii) Rajajeshwarinagar.
Figure 12-7 presents the BESCOM administrative zones, whereas Figure 12-8 presents overlay of the BESCOM BMAZ and BMA.
AUTHORITY ★
Figure 12-7: BESCOM Zones
Source: BESCOM
Figure 12-8: BESCOM BMAZ and Bengaluru Metropolitan Area Overlay
BANGALOE AUTHORITY ★
Bengaluru is powered by the same southern grid that supplies to the entire state. The sources include hydel, thermal and non-conventional sources like wind and solar. Karnataka state gets power from Central Generating Stations (CGS), Hydel Power Stations and Thermal Power Stations within the state. There are no dedicated power plants/ generation centres for Bengaluru.
The total peak power demand for Bengaluru (BMAZ) stood at 2579 MW (2015-16) and the energy consumption is at 13885 MU. The average growth in peak demand during 2004 to 2015 has been 11.6% per annum (CAGR), while the Energy Demand has increased by 9.5%. The Per capita energy consumption has increased from 827 units in 2005 to 1219 units in 2014 with CAGR of 4.4%.
Table 12-5Summary of Power Consumption Trend for BMAZ
DESCRIPTION
Growth Rate (2004 TO 2015)
Peak Demand
11.6%
Energy Demand
9.5%
Per Capita Consumption
4.9%
Source: 19th EPS, KPTCL
Figure 12-9: BMAZ Peak Demand (2004-2015)
YEAR
BESCOM Peak Demand in MW
BMAZ Peak Demand in MW
2004
1608
804
2005
1843
921
2006
1888
944
2007
2364
1182
2008
2418
1209
2009
2592
1296
2010
2856
1428
2011
3019
1510
2012
3953
1977
2013
4144
2072
2014
4321
2161
Source: 19th EPS, KPTCL
BESCOM BMAZ has over 45.26 lakhs consumers (as on March 2014) of which domestic and commercial constitutes 92% (80.2% and 11.8% respectively) whereas industrial and agricultural consumers are negligible. Consumers of electricity in BMA include low-tension (LT) consumers – domestic, commercial, agriculture, industries and miscellaneous categories and high tension (HT) consumers – residential apartments, industries, commercial, irrigation, water supply.
The power supply to Bengaluru is made through four 400/220kV power stations located at Hoody, Nelmangala, Bidadi and Somanahalli. Further, electric supply to different parts of the city is made through 220/66kV sub stations, which are equally distributed to all parts of the city. The power
supply to consumer is supplied after being stepped down voltage through substations; primarily at 11kV, however 33kV power is also supplied to bulk consumers/industries. BMAZ has 4 of 400/220kV Substations, 25 of 220/66kV Substations and 52 of 66/11kV Substations having total installed capacity of 13245 MVA. There are 2801 numbers of Distribution Transformers within BMAZ. Further, KPTCL has planned 18 sub-stations of different capacities (400kV, 220kV, 66kV sub-stations) in BMA Zone of BESCOM.
In general, the present transmission and distribution infrastructure is inadequate to meet the unrestricted peak hour demand given the fact that around 25 out of 62 substations would require immediate augmentation along with associated distribution network.
12.4.2 Power Demand/ Forecast and Land Demand
Based on the 19th Electricity Power Survey, Central Electricity Authority (CEA), requirement of power for Bengaluru in the year 2026 as projected by the KPTCL is 3680 MW, the estimated peak demand for 2031 is 4288 MW (say 4300MW). To meet the additional requirement of 1720MW, the KPTCL & BESCOM need to augment the power supply and improve the transmission and distribution system. The additional power requirement is expected to be met from allocated share from the grid system and generation at state level.
Table 12-619th Electric Power Survey Forecast for Energy and Peak Demand for BMAZ
YEAR
2011
2016
2021
2026
2031 (extended forecasts)
Energy in MU
12129
13885
15349
18174
23638
Peak Demand in MW
2273
2639
3207
3680
4288
Source: KPTCL
Figure 12-10: 19th Electric Power Survey Forecasts for BMAZ
Source: KPTCL
In order to meet the future power demand, it is recommended that The Government of Karnataka enter into power purchase agreements with power generating companies and/ or establish power generation plant for effectively meeting Bengaluru’s long term power demand. The power
BANGALOE AUTHORITY ★
infrastructure and land required for power infrastructure has been planned based on CEA planning norms recommending planning for 200% of peak demand. Accordingly, it is estimated that in addition to existing infrastructure, 2 of 400/220 KV, 39 of 220/66KV and 68 of 66/11KV substations are required. It may be noted that some of the additional requirement are already in the process of being implemented. Table 12-7 provides the summary of required sub-stations.
Table 12-7Details of Existing and Additionally Required Sub-Stations
12.4.3 Use of Renewal Energy
In order to reduce the dependency on fossil fuels and attend energy efficiency it is critical to attend the following:
Non-conventional energy sources like recovering energy from municipal waste, sewerage, solar energy, etc. should be used for street lighting, lighting at public spaces, open areas, traffic signals, hoardings, etc.
To supplement part of the estimated growing power requirement, nonconventional sources / solar energy and other actions proposed are as follows:
o Solar energy should be encouraged for all establishments with floor area of more than 300 sq.mt.
o All public buildings to install roof top solar panels and use CFL blubs.
o Solar Panels for public advertising, lighting in open areas, public utilities, streets, etc.
o As alternate mandatory arrangement during power cuts to replace generators/inverters etc.
o Interim solutions of single point connection in unauthorized developments and slums.
o Incentivizing energy savings and use of energy efficient gadgets.
o Promotion of Battery Operated Vehicles and Non-motorized Transport.
It is proposed that a Government of Karnataka prepares a detailed Renewal Energy Master Plan for Bengaluru and implements the same for long term energy savings.
12.2Municipal Solid Waste
Solid Waste Management (SWM) is an obligatory function of the BBMP and is governed by the Solid Waste Management Rules, 2016 (“SWM Rules”) and several court directives. In BMA, which comprises of BBMP and around 50 Gram Panchayats, there is no single unified authority for the waste management. BBMP is looking after the waste management within its jurisdiction, while the rest of the area, which is administered by different Gram Panchayath’s, concerned Gram Panchayath is responsible for waste management in their respective jurisdictions.
BBMP is in the midst of transforming its waste management system from centralised to a decentralised one. Going forward with the decentralized approach, in BBMP area, SWM facilities have been substantially provisioned at the ward, zone and city level. BBMP looks after the collection, transportation, segregation, processing, treatment and disposal of solid waste in the city of Bengaluru. BBMP has established dry waste collection centres, enhanced solid waste collection and transportation activity, mechanical sweeping, bulk waste management and waste processing units using modern technologies like bio-methanation waste to energy plants and vermi-composting facilities.
Essentially, BBMP is aiming at The Integrated Solid Waste Management (ISWM) System – a waste management hierarchy (refer Figure 12-1), to ensure reduction in the amount of waste being disposed (Landfill waste) and maximise resource recovery and efficiency.
Figure 12-1: Integrated Solid Waste Management System Hierarchy
Most Preferred
At Source Reduction & Reuse
Waste minimisation and sustainable use/multi use of products (e.g. reuse of carry bags/packaging jars)
Recovering energy before final disposal of waste (e.g. RDF, biomethanation, co-processing of combustible non-biodegradable dry fraction of MSW, incineration)
Landfills
Safe disposal of inert residual waste at sanitary landfills
In Panchayath areas within BMA, reliable information about the management of waste is not readly available. However, the comprehensive socio-economic household survey suggests that 14% of the households in these villages have access to waste collection system. Hence, the existing Status on Solid Waste is limited to BBMP. However, forecasts and demand estimates are for the entire BMA
(including part of BMICAPA). In view of the above, to attain a sustainable solid waste management system in Bengaluru, BBMP has adopted the following Approach and Strategies within its jurisdiction.
a) The Approach:
Reduce – Reuse – Recycle (3R approach): The 3R Approach is aimed at optimising SWM management from all the waste-generating sectors and involving all the stakeholders (waste generators, service providers, informal sector, regulators, government, and community or neighbourhoods). The adoption of 3R minimizes the waste being handled by the local bodies (BBMP/GPs), minimizing public health and environment risk associated with it.
b) Strategies:
Decentralised SWM Systems: In order to reduce the burden of unscientific handling of large volumes of MSW, the city has opted to shift its focus from a centralised ‘single stream’ collection and ‘Landfill disposal’ system to a decentralised ‘multiple stream’ collection and scientific ‘Processing’ system.
Separating Bulk Generators: Bulk Generators contribute to 25% of the city’s waste and have been separated from the regular collection cycle. They include domestic generators - apartment complexes with more than 50 units and Commercial bulk generators viz. hotel/ restaurant, clubs, factory, choultry, mall, shopping complex, marriage halls, convention hall, place of worship, institution, office establishment, railway stations, bus stand or any other commercial or public entity which accumulates MSW of a quantity not less than 10 kg per day. These generators are being mandated to set up in-situ systems or link with BBMP empanelled vendors to manage their waste.
Micro plan: A Micro Plan is a process of creating a solid waste management plan for the smallest unit of management, by splitting the ward into blocks (750 Households + shops). City-wide implementation of the micro SWM plan is already being rolled out in the BBMP area.
The master plan proposes that similar approach and strategies be followed by respective Gram Panchayats in consultation with various stakeholders including ward committees and SWM experts within LPA of BDA for better synchronisation synergies and optimisation of resources. With this background, the RMP 2031 has analysed the existing status of SWM within BMA and has formulated the proposals for allocation of land for SWM facilities in consultation with BBMP.
12.2.1 Municipal Solid Waste Generation
As per the assessment and quantification of municipal solid waste generation carried out by BBMP in the year 2016, the waste generation rate in BBMP area is approximately 564 grams/capita/day (gcpd). In addition, the villages administered by the Gram Panchayath’s are expected to get further urbanised/ populated by 2031 with planned development as envisaged by RMP-2031 and therefore, similar estimates have been made for areas outside BBMP.
AUTHORITY ★
RMP 2031 has considered waste generation growth rate at 1.3% per annum on the base of 564 gcpd to estimate per capita waste generation by 2031. RMP 2031 estimates that about 13911 tonnes per day of Municipal Solid Waste (MSW) will be generated in BMA by the year 2031 (Table 12-1).
Table 12-1Waste Generation Estimates for BMA
Year
MSW gpcd@1.3%growth p.a.
BBMP Area (8 zones; 198 wards)
Outside BBMP Area (50 Gram Panchayath's; 251 Villages)
BMA (BBMP area + Villages)
Projected Population
MSW generation (TPD)
Projected Population
MSW generation (TPD)
Projected Population
MSW generation (TPD)
2016
564
10207062
5757
844837
476
11051899
6233
2021E
602
12164520
7318
1386925
834
13551445
8153
2026E
642
14026694
9002
2590119
1662
16616813
10664
2031E
685
15480378
10597
4840427
3314
20320805
13911
Source: BBMP
-gpcd: gram per capita per day (as per 2016 waste assessment carried out by BBMP)
-gpcd for BMA is calculated as per gpcd considered for BBMP area
-TPD: Tonnes per day
-Municipal Solid Waste (MSW) comprises of: Residential HH; Small commercial establishments, Bulk generators; Street Sweeping
-MSW excludes Construction & Demolition Waste [estimated to be around 1500 to 2000 TPD (2016 assessment) E-estimates
12.2.2 Waste Streams & Composition – BMA
In line with the SWM Rules 2016 and micro assessment carried out by BBMP, the 4 basic streams of waste identified are as follows. Subsequently, the waste composition for BMA (assuming same for outside BBMP area) is depicted in Figure 12-2.
Wet Waste: Any organic material that can be degraded by micro-organisms into simpler stable compounds. It includes household kitchen waste, food waste from small hotels and bakeries and garden waste.
Dry Waste: Waste other than food waste and inert and includes recyclable waste, non-recyclable waste, combustible waste and sanitary waste
Domestic Hazardous Waste: comprises sanitary and bio-medical waste. This includes hygiene products like sanitary napkins and baby or adult diapers contaminated with blood, urine and faeces; and bandages and sharp objects like syringes and needles
Inert/Reject Waste: includes street sweeping inert (like silt from drains) and post processing rejects from the wet waste processing units or dry waste collection centres. It does not refer to mixed waste or construction and debris waste.
In addition, other waste streams that are being addressed in terms of segregating, collecting and processing are:
• Coconut Waste: This includes the exterior shell of tender coconut left over after the water is consumed
Leaf/Garden Waste: This is all horticulture waste and includes leaf litter, garden pruning, and branch cuttings.
Figure 12-2: Waste Composition - BMA
The waste composition is the basis of projections-stream wise projections for entire BMA. Table 12-2 provides the estimated quantum of wet, dry, domestic hazardous and reject waste generation in the year 2031.
Table 12-2Projected Composition of Total solid waste for 2031 - BMA
As per the High court directive dated 17 December 2015, 3-way segregation at source (wet, domestic hazardous & dry) for domestic generators and 2-way segregation for commercial generators was mandated and is being implemented.
AUTHORITY ★
Figure 12-3: Waste Segregation Guidelines
Source: BBMP
Primary collection & transportation involves three activities - wet and domestic hazardous waste collection (daily), dry waste collection (bi-weekly) and street sweeping (frequency based on road width)
Figure 12-4: Waste Collection & Transportation Process
★
Dry Waste: For recycling of Dry waste in the city, at present there are 196 Dry Waste Collection Centers (DWCC), 1 per ward and large aggregators as per zonal requirement. Out of 27% of dry waste generated in the city, only 36% of it is currently processed. Figure 12-5 presents the Dry waste flow.
Figure 12-5: Dry Waste Flow
Wet Waste: For city level processing of wet waste, at present there are 11 bio-methanation units (BMU), 7 organic waste converters (OWC) as per ward requirement – small hotels and markets and windrow composting in 9 integrated waste processing plants (IWPP) at the zone level. At present, out of 64% of the total wet waste generated in the city 92.5% is processed in IWPP, 7% in BMU and 0.25% in OWC’s.
Figure 12-6: Wet Waste Flow
BANGALOE AUTHORITY ★
Domestic Hazardous Waste: At present, out of 3% of the total domestic hazardous waste generated in the city, only 1% of the waste is processed by existing biomedical waste processing agencies.
Inert/Reject Waste: At present, 6% of the total waste generated in the city is inert waste, meaning waste that cannot be further processed or utilized in any other form. This waste is usually termed as Landfill waste as it is disposed of in a sanitary landfill.
12.2.4 Waste Disposal
Although Inert waste comprise 6% of the total waste generated at present and the waste to be landfilled should be approx. 10-12% of the total waste however, taking into account post-processing rejects from the wet waste processing units or dry waste collection centres including unprocessed dry waste (~17%) along with construction and debris waste altogether, make up to over 25-30% of the waste going to Landfill.
(a) Processing of Domestic Hazardous Waste generated:
The segregated domestic hazardous Waste (including sanitary waste) will be collected from drop-off locations/points (DWCCs) and further processed by existing biomedical waste processing agencies. The facilities include incinerators, Autoclaves, Shredders and Effluent Treatment Plants to scientifically dispose this waste. There are 3 units to manage bio-medical waste in Bengaluru: 1) SembRamky Environmental Management Pvt. Ltd. 2) Maridi Eco Industries Pvt. Ltd. 3) Anu Autoclave
(b) Lorry Point/Transfer Stations:
A Lorry Point is a point where the transfer of waste takes place from the Primary to the Secondary vehicle, within a ward. These are usually located by the side of the road, vacant sites and in front of decentralised waste facilities. At present, there are 340 lorry points throughout the city. As these Lorry points are informally located within wards, they result in several issues such as garbage on
ground, creation of black spots, resident opposition, etc. Therefore, the city aims to move from multiple informal points to a single built transfer station per ward.
(c) Disposal of Inert/Rejects (Landfill Waste):
BBMP has identified 3 abandoned quarries, which are currently been designed as Sanitary Landfills. It will receive only the following types of waste:
Comingled waste (mixed waste) not found suitable for waste processing
• Pre-processing and post-processing rejects from waste processing sites
• Non-hazardous waste not being processed or recycled
As per BBMP, the three Landfills available have a total capacity of approx. 1460 TPD. Significantly, this capacity can address the quantum of waste to be landfilled upto 2031. However, this is a farfetched assumption as this is only feasible if the rejects/inerts to be landfilled are 10-12% of the total waste generated, which in its entirety is dependent on factors such as:
100% Segregation of waste
Waste processing/treatment achieved as per ISWM hierarchy, SWM rules 2016
High recycling and waste diversion rate
Processing and disposal of Construction & Debris Waste as per C&D rules, 2016
Moreover, keeping in view the fact that finding new sanitary landfill sites in Bengaluru is becoming extremely difficult, there is no option, but to resort to the strategy (decentralized) as developed by BBMP at the micro-level. This in turn, has led to the need for a new approach in Solid Waste Management as the city plans its shift towards ‘A Future with No Landfills’.
Chapter 12Physical and Social Infrastructure
12.1 Water and Waste Water
The water availability for meeting the future demands of Bengaluru for the master plan period and beyond was one of the concerns expressed by some citizens during the public consultations. By all accounts, the availability of surface water (synonym as Cauvery water) has not affected the growth of city (in terms of population and spatial). Having said that Bengaluru is at the situation where the only surface water source available to city (River Cauvery) is legally getting exhausted and dependency on ground water is growing. Will the city continue to grow? probably yes – for the fact that Bengaluru has become self-sustaining economic growth centre in entire state of Karnataka. Even if the policy decision is taken to reduce the pressure on Bengaluru by developing counter magnets, the real impact would only be visible after decade or two, provided all policy initiatives are implemented in time bound manner.
Water would be required for future population in Bengaluru – during the master plan period (2031) and beyond. It is indeed a fact that city is to face water shortage in future even after having exhausted the only surface water source, thereby increasing the dependency on ground water much more than today. The situation is likely to persist in future, the only difference being the spatial impact. The water is likely to be available and supplied to entire of BBMP by master plan period, it is the adjoining villages with Bengaluru Metropolitan Area, that are likely to get urbanised over next 15 years. How we reduce the water demand and manage the water demand is going to be most important aspect in utilising existing resources to providing safe drinking water to fellow city residents. The implementation of dual pipeline system and use of recycled water for non-potable activities for all future developments is likely bring substantial reduction in potable water demand, thereby dependency on resources. Further, social acceptability of use of recycled yet potable water would completely change the water dynamics in the city. However, this is possible only if the of water supply and sewage system covers the entire planning area.
Located at 950 Mean Sea Level Bengaluru is only metropolitan city which is not abutting to any major surface water source (River). Bangalore Water Supply and Sewerage Board (BWSSB) formed in 1964 under BWSSB Act, 1964 is mandated to provide water supply and sewage systems primarily within the BBMP (708.5 sqkm). However in the Bengaluru Metropolitan Area (admeasuring 1294 sqkm), in addition to BBMP, there are 51 Gram Panchayat’s (with 251 villages having spatial extent of 583 sqkm) served by Panachayath Raj Engineering Department (RDPR/ PRED). At present BWSSB is extending the water supply and sewage network to entire BBMP area and is expected to complete the works by 2021. However, there is no coverage of water supply and sewage network in many areas already urbanised and under process of urbanisation outside the BBMP Limits. These areas are expected to get further urbanised by 2031 with planned development as envisaged under Revised Master Plan - 2031. It is therefore recommended that BWSSSB provide support to RDPR in planning for water supply and sewerage network for entire BMA, for the fact that existing/ planned systems
BANGALOE AUTHORITY ★
within BBMP will have to be integrated/ extended to villages outside BBMP. This is to help in designing and implementing the integrated networks across BMA.
As per Census, BBMP has a population of 8.4 Million (93% of BMA) whereas the rest of 251 villages together hold 0.7 million persons, thus a total of ~9.1 million in BMA. The population projections for RMP 2031 suggests that population within BMA is expected to reach ~20 million by 2031, thereby, making Bengaluru the third most populous city in the country.
At present BWSSB is withdrawing about 19 TMC of water (1470 MLD) from Cauvery to meet city’s water demand. The Plan/ work is on for getting additional 10 TMC (775 MLD) of water as accorded by the Cauvery Tribunal to meet the water demand for BBMP area alone. Thus, altogether about 29 TMC (2250 MLD) of water is available for Bengaluru from Cauvery. Though Unaccounted for Water amounts to 46%, the actual water losses (transmission, leaks, treatment and distribution) are around 15-18%. Also, network coverage (both water supply and sewage) in the city is limited and work is in progress to get entire BBMP covered by 2021.
The water demand has been established considering 135 LPCD supply to the population. Non-domestic water demand for potable purposes has been established considering 45 lpcd for estimated work force. Equal amount of non-potable water has been considered for non-domestic sector to establish the total non-domestic demand. The net water demand including water demand for non-domestic activities has been estimated at 3639MLD for the projected population of 20.3 million for BMA by 2031. The net demand of 3639MLD translates to the total gross water requirement for BMA at 4282 MLD considering 15% losses towards transmission & distribution.
As mentioned earlier, dual pipeline system for use of recycled water would reduce the overall water demand for potable water. If the water supply is split (within plot/ site) into two – potable (@90 lpcd) and non-potable (45lpcd) then the water demand for potable water can be reduced by 865 MLD. However, still there will be water shortage of about 862MLD [refer table 2]. This water shortage likely to be met through Ground Water, thereby increasing the dependency on ground water from present level 677 MLD to 862 MLD (about 27% (185MLD) higher than present levels). It may be noted that due to change of land use from Agriculture to urban activities within BMA, the water withdrawal for current agriculture activities to the tune of 100-150 MLD would be available for urban activities. This is with the assumption that present over draft will continue. Thus, the status of ground water dependence in 2031 would be of the similar scale as it is at present.
To meet the future water demand following are the master plan suggestions:
Providing Infrastructure across the Planning Area: Being a public utility, providing water to the public has a vital interest in its functioning and wellness of the society. More than 27% of water supplied by BWSSB is among the BPL and EWS of the society and is provided free of charge. BWSSB has coverage of 575 sq.km area out of 710 sq.kms of BBMP. The rest 135 Sq.km under 110 villages is expected to be covered by 2021. However, rest of the planning are outside BBMP are not covered by BWSSB, and it is imperative to improve the coverage to not only within BBMP but also in villages outside BBMP falling within BMA. It is therefore recommended to institutionalise the planned water supply and sewage network out BBMP as well to reduce the dependency on ground water.
★
Dual pipe line for drinking and other purposes for the newly planned areas and additional population. On implementation of Dual pipeline, Government has to take measures to supply Cauvery water for all the purposes for population expected to be living in the BBMP in existing establishments and for only potable purposes for the population residing in any new developments in BBMP area which need to be developed on the basis of zero liquid discharge policy. Similarly, dual pipeline system shall cater to additional population expected to be residing in 251 villages of BMA with only potable water demand being supplied by Government infrastructure. This initiative could minimize additional water requirement significantly but it is difficult to make an assessment of the same at master plan level. As per IS 1172, out of a total per capita demand of 135-200 lpcd, a flushing water requirement of 45 lpcd may be taken for flushing requirements and the remaining quantity for other domestic purposes. However, other non-potable water uses may include gardening, washing etc. Recycled water has to be made available for non-domestic purposes and non-drinking purposes in the 251 villages where the new supply network is planned. Even after realising 865mld of treated recycled water and additional about 2000mld recycled water would be available, which can be utilised for revival of lakes and valley system. Using innovative systems like artificial aquifer recharge would help in improve the ground water levels.
Water Conservation: Over 50% of the population of the project population of 2031 has been assumed to be supplied potable water @135lpcd; however there is a strong potential for reducing this demand of 135lpcd through promoting awareness for water conservation, implementation of decentralised sewerage treatment plants for the local area, which can be utilised for gardening, horticulture purposes and other activities like car washing. This would lead to reduction in potable water demand to 120lpcd, which translate to saving of about 166MLD. Thereby bringing down the dependence on ground water below the present level.
Treating Recycled Water to Potable Level: The fact that Cauvery will not be adequate for city and relishing water from other sources is still to determined, it is proposed to recycle the sewage water with tertiary treatment technologies available in the market and supply to the city for all the purposes.
Evaluation of Proposals of Thyagaraja Committee: For long term purposes some of the major interventions proposed by the Thyagaraja Committee to explore new sources have to be considered by the state government on priority basis.
Rejuvenation of Lake and Valley System: The lake and valley system has been historically water supply source, however due to limited sewage network coverage; most of the lakes are filled with sewage. The improved coverage of sewage network is expected to improve the quality of water flowing into lakes. In addition to that recycled water shall be used to rejuvenate the lakes along with dredging of some of large lake to improve the holding capacities and aid ground water percolation. Adequate sewage network and infrastructure shall be developed to contain the sewage flow into lakes and streams.
Towards provision of land for water and sewage infrastructure, the Master Plan has incorporated the proposals provided by BWSSB for BBMP area and are appropriated depicted in proposed land use maps.
BANGALOE AUTHORITY ★
Description
No. of Substation Existing in2016-2017
No. of additional Substation Required by 2031
400/220kV
4
2
220/66kV
14
39
66/11kV
80
68
Note: Additional substation required also includes substation proposed by KPTCL
It is estimated that about 7.2 hectares of land is required for 400/220kV substation, 13.5 hectares of land is required for 220/66kV substation and 12.34 hectares of land is required for 66/11kV substation. The land estimates has been done with the assumption that all future sub-stations would be GIS based, thus reducing the land requirement. Table 12-8 presents the land requirement considered for each substation.
Table 12-8Land Requirement of Sub-stations
Substation
Land required for GIS (ha)
Land required for AIS (ha)
400/220kV Substation(GIS)
3.64
16
220/66kV Substation(GIS)
0.48
4
66/11kV Substation(AIS)
0.202
0.25
It is proposed that major transmission network would be developed within the Right Of Way of proposed master plan roads and would follow short route method in agriculture zone. The grid substations has been identified and land has been allocated in the master plan and shown at Planning District level proposals. The safe distance for developments along the transmission lines should adhere to Indian Electrical Rules, 1956. The vertical & horizontal clearances from buildings along transmissions lines shall be as given in Table below.
Table 12-9Indian Electric Rules, 1956 prescribed Safe Distance for Buildings
BUILDING CLEARANCE
66kV
230kV
400kV
Vertical Clearance
3.969(13')
5.488(18')
7.318(24')
Horizontal Clearance
2.14(7')
3.66(12')
5.489(18')
Source: Indian Electric Rules, 1956
In addition to existing 4 and 2 planned 400/220kV substations, 2 more such sub-stations are required for BMA and some of them are required to be established outside BMA and within other local planning area of Bengaluru Metropolitan Region (BMR). Potential Locations for establishing
these sub-stations are Devanahalli and Jiganii. It is therefore required that BMRDA and KPTCL coordinate for allocation of Land in other LPAs within BMR for establishing 400/200kV sub-stations.
Facilities required by 2031: Table 12-3 presents the facilities required with BMA for Waste Segregation, Collection & Transportation.
Table 12-3Proposed Units for processing of Dry waste generated
Particulars
No.s
DWCC (3 TPD to 5TPD) @240 to 480 sqm
470
Aggregators (50 TPD @ 1200 sq.m)
19
BMU (5 TPD @ 600 sq.m)
12
OWC (1 TPD @ 220 sq.m)
85
IWPP (500 TPD @ 97125 sq.m)
8
Source: BBMP and RMP 2031
Landfill area requirement: Considering active period of the Landfill as 20 years, it is estimated that about 220 ha of land (25% additional services) will be required to landfill the rejects generated in BBMP area. These estimates have been made by taking into consideration the waste being landfilled at 25% of the total waste during (2011-2018) after which computations have been made keeping in view the ongoing interventions (decentralized approach), if successful will yield only 12% of rejects from the total quantum of waste generated.
12.5Social Infrastructure
RMP 2031 envisages good quality of life in the city with accessible social infrastructure for all citizens. As the city grows rapidly, there will be need to expand the number of social infrastructure facilities like educational infrastructure, healthcare infrastructure, recreational infrastructure, safety and security infrastructure, and other necessities like neighbourhood amenities, opens spaces etc.
12.5.1 Educational Infrastructure
Primary and Secondary Educational Infrastructure: Bengaluru has very good educational infrastructure in comparison to the rest of the state. For the purpose of administration, the education department categorises schools under various educational districts. Table 12-10 shows the number of government and private schools across various categories in Bengaluru Urban District, whereas Figure 12-11 presents the spatial spread.
AUTHORITY ★
Table 12-10Number of existing government and private schools in each category
Source: E-Governance Unit, Department of Public Instruction (2014-2015) and Consultants Analysis, 2015
Figure 12-11 Spatial spread of schools within Bengaluru Metropolitan Area
A gap analysis study shows that most inhabited areas in BMA have access to a primary school within 1 km radius. The schools also face challenges like traffic safety and congestion during the schools hours.
The RMP 2031 envisages development of new schools in the transitional periphery zone of BMA. The educational infrastructure in the inner and outer core may be reinforced by provision of playground spaces wherever possible. Presently there are no gaps, and all areas are adequately covered by schools. There is less concentration of schools outside the outer ring road presently. However the city needs more government schools to be more inclusive. It is expected that land areas of government schools is met by the land ceded to the BDA under C.A site.
Higher Education Infrastructure: Bengaluru plays a role of primacy in the state of Karnataka, in the education sector. Bengaluru Metropolitan Area (BMA) has a fair share of institutes of higher education and professional institutions. Bengaluru is a hub of higher education in the country with a high number of colleges and professional institutes.
12.5.2 Healthcare Infrastructure:
Accessible health infrastructure is a necessity for welfare of the residents. The city of Bengaluru has a high concentration of healthcare facilities in the BBMP area. Bengaluru serves as a tertiary healthcare centre for the surrounding region with several tertiary and referral hospitals in the city. Bengaluru has many super speciality and multispecialty facilities which also make it a healthcare tourism destination. The BBMP runs several government hospitals, maternity centres, and healthcare centres within the erstwhile BBMP areas. The rest of the BMA is served by healthcare infrastructure run by the department of health and Family Welfare. Private healthcare facilities are spread around the city. Most of the large referral and tertiary care hospitals are located within BBMP and concentrated in the core areas within the outer ring road
Gaps: There are several pockets in the peripheral areas of BMA, which are more than 5kms away from a healthcare facility. With the increasing traffic congestion, and reducing vehicle speeds in the city, the accessibility to medical facilities has reduced even in some of the core areas in Bengaluru, especially for people living far away from healthcare centres. The access to tertiary healthcare is a major gap in the peripheral areas of BMA.
RMP 2031 proposes that government run public healthcare facilities be opened in some of peripheral areas of the city outside the BBMP so that no area is more than 3 Kms away from a government healthcare unit.
AUTHORITY ★
Figure 12-12: Healthcare Facility Accessibility
Source: RMP 2031, District Health Officer, BBMP,
12.5.3 Public Open Spaces
Bengaluru has public open spaces like Cubbon Park, Lalbagh, several city level and neighbourhood level parks, as well as other accessible open spaces. The loss of green cover in the city in the last decade is a major cause of concern. While there are large city level parks and neighbourhood parks in the core areas of the city, there is a lack of playgrounds in the city. The peripheral areas which lack large parks or playgrounds, give an opportunity for the same to be developed in a systematic way, owing to availability of vacant lands and buffer areas along the lakes and streams. RMP-2031 proposes regional parks and city level public open spaces. These open spaces shall conserve the greenery, lake buffers and eco-sensitive areas, while also providing recreational benefits to the residents of the city. The RMP 2031 also envisages development of playgrounds and sports centres in the city, in the peripheral areas, which are easily accessible to the public. The need of playgrounds
★
in the neighbourhood is stressed upon, and neighbourhood level parks along with playgrounds are to be developed in all proposed residential areas.
Table 12-11 outlines the various categories of Parks and Open spaces and the nature of each type of open space.
Table 12-11Categories of Parks and Open spaces
S.No.
Park Categories
Approx Area
Examples in Bangalore
Broad nature of the environment
Active Recreation spaces
Passive Recreation Spaces
1
Regional Parks
200 -400Acres
Cubbon Park ~ 300 acres Lalbagh ~ 240 acres
Largely natural, in eco sensitive areas, with riparian buffers.
Very limited, in areas other than no development zones.
Prominently more
2
City Parks - Planning District Park
50 -150Acres
Freedom Park ~ 21 Acres
A combination of natural areas and activity areas like playground, running tracks.
Several active recreation spaces available
Passive recreation spaces available.
3
Sporting Facilities
10 to50Acres
Kanteerava stadium
Mostly intense activity areas with some amount of natural landscaping and lawns.
Prominently more
Very limited passive recreation facilities
4
Multipurpose Grounds / Play grounds
5 to 10 Acres5acres and above
Several local level grounds present
Mostly intense activity areas with some amount of natural landscaping and lawns.
Sports facilities proposed in the revised RMP 2031 would be public spaces supporting active recreation and catering to a range of activities and games including badminton, tennis, cricket, football, basketball, table tennis, fitness, gymnastics etc. These facilities may be provided as standalone sporting facilities or as additional sporting facilities to larger parks open spaces and multipurpose grounds. RMP 2031 proposes development of 4 large sports complexes across BMA.
BANGALOE AUTHORITY ★
12.5.5 Fire Stations
Fire stations are critical infrastructure that needs to be present in every planning district. An optimum distance for fire station is 10.5 sq km radius, but the frequency of fire stations need to be more in high density areas due to increase of risks. Bengaluru has 19 fire stations, mostly located in the core areas.
As per the requirement of Karnataka Emergency and Fire Services Department 16 new fire stations have been incorporated in RMP 2031. In addition, RMP 2031 has identified additional fire stations and defined in Proposed land Use map as Public and Semi-public use.
12.5.6 Art and Cultural Infrastructure
Bengaluru is an important centre of art and culture with several prominent art schools, performance spaces and cultural hubs. Bengaluru is the capital of the Kannada cinema industry, and an important theatre and drama hub in the country. The city has several art installations, and hosts street art festivals along with formal events like art exhibitions, book fairs etc. Formal and informal spaces must be provided for art and culture to thrive city. Informal spaces include street pavements, plazas, open spaces, parks and open spaces etc. Formal spaces like art galleries, museums, performance spaces, outdoor spaces like open air theatres, cinema halls etc must be provided in all planning districts.
12.5.7 Markets
Markets, both formal and informal, are needed at accessible distance. While the core areas of the city have very good market facilities, such facilities must be provided in the outer areas. Each market must also have space for informal vendors and vendors who sell occasionally or seasonally. It is proposed to develop markets along with logistic hubs and in the planning districts which are devoid of markets.
12.5.8 Cemetry and Graveyard
Bengaluru has limited number of cemeteries and graveyards. Most of the graveyards in the city have reached the threshold. More number of graveyards is required in the city and the outer areas. RMP2031 proposes development of burial grounds, cremation ground/ cemetery in each planning district.
12.5.9 Night Shelters
RMP 2031 proposes that adequate number of night shelters be developed based across BBMP depending on the requirement by BBMP for the urban poor.
AUTHORITY ★
12.5.10 Women’s Hostels
Bengaluru attracts many people from other parts of the state and the country who come here to study and work. Women, especially from poorer families find it very difficult to find a safe place to stay while they work or study in the city. RMP 2031 proposes development women’s hostels for working women and female students in each planning district that would provide affordable and safe accommodation to women.
BANGALOE AUTHORITY ★
Should facilitate active recreation when necessary
Should facilitate passive recreation like jogging and walking etc.
Regional Parks: 8 Regional/ Large Parks and are proposed to be developed as natural areas to provide recreational space and also safeguard the fragile lake and stream system.