For an effective planned Implementation of Master development plan by providing a time schedule is required. The purpose of action plan is to evaluate in detail the action required to convert strategy into practise. The action plan sets out in detail the steps taken in implementing each component of the overall strategy over a period of time. The action plan is divided into three time segments:
The action plan is more detailed in its provision for the short term i;e, for a period of five years. The medium and long term provisions are less detailed and focus on the major objectives and targets as the detail of the plan will have to take into account the success of the implementation of the objectives for the short term as well as the actual developments. The group that to be following for plan implementation shall take initiatives in this regard.
Down stream projects for implementation of Master plan
- In all mixed use areas construction of boundary wall in the front shall not be permitted. Efforts to be made that in all schools, colleges, offices and Institutional areas are to be encouraged to construct the front boundary wall after leaving minimum of 3 m offset from the road R.O.W. for visitors parking.
- In all commercial/mixed use/transport nodes/education/healthcare etc. area as prescribed under National Policy on Street Vendors shall be reserved for informal trade, kiosks, low turnover vendors of daily needs.
- With a view to implement 74th CAA, the Municipal Bodies/Local governments be empowered to prepare and approve Local Area Plans and Special Area Plans within the mandate of MDP 2025. The responsibility of preparing layout plans rests with the land owning agency.
- For proper implementation of MDP 2025 and also to take up Planning and Development reforms following high level Committees/groups may be constituted by the State Government:
i. Plan Monitoring Committee
ii. Environment Planning and Coordination Committee
iii. Infrastructure Development and Coordination Committee
iv. Spatial Data Infrastructure Group
v. Committee on Networked Common Platform for Building Approvals of both JDA and J.N.N.
vi. Legal Framework Review Group to plug loopholes and negate contradictions.
- All the residential developments shall provide EWS/LIG/social housing component a priority.
- The road Right Ways wherever proposed to be reduced shall be subject to preparation of detailed Road development Plan giving reasons/justification for its reduction.
- Master Plan is a policy level plan and is not complete without the follow-up strategic level plans. The 'concerned organizations shall prepare within two years of the approval of MDP 2025 the following Plans:
i. Zonal Development Plans
ii. Water Supply Plan
iii. Power Generation and Distribution Plan
iv. Solid Waste Management Plan
v. Drainage Plan
vi. Environment Management Plan
vii. Housing Development Plan (including Slum Rehabilitation /BSUP/ IHSDP)
viii. Special Area/ Heritage Conservation Plan
ix. Mobility/Transportation Plan at zonal level
x. City Landscape Plan
xi. Village Development Plans on PURA concept
xii. Disaster Management Strategic Plan
xiii. Financing Strategic Plan
xiv. Land Information and Management Strategy
xv. Catchment area plan for Jaipur Region
xvi. Decongestion plan for walled city area
xvii. Public convience plan
In order to ensure further development scope of the Region the following are the pointers:
The sector plans are generally prepared for U-1 area and a major road network of 30 mtr. and above prescribed in U2 area. However, while examining the proposals of earlier commitments, it is felt that once a major frontage is occupied by one single parcel of land, the rear side of the plot or piece of land loses the advantage of having any approach to the major road or sometimes with no approach road at all. In the same analogy there have been requests from department of public utilities, local Govt. agencies for land allotment to provide physical/social infrastructure. The land bank with the local Authority is fast declining. The tendency of these agencies to go for acquisition/negotiations for the said purpose is not forth coming. This create large burden on the local authority.
In order to attend the above a new provision is made as under:
All the development permissions on non plotted development land having area of one hectare and above (eg. group housing/ hotel/resort/institution/industry etc.)
(i) Set apart 5% for facilities and utilities.
The land so earmarked shall (a) abut a road, with a minimum area (contiguous) of 500 Sq.mtr. and one side dimension of 25 mtr. (b) In case of large area of 3 hectares and above or odd shaped size, the B.P.C (L.P) may decide about the dimensioning. (c) Transfer the land to JDA by way of surrendering.
(ii) Set part 9 mtr. from the sides, for road, to enable opening or approach to the rear hinter land to major road. In case of odd shaped/zig zagged land the BPC(L.P) may take appropriate decision with regards to alignment of road/access. In the cases where Master Plan roads, Sector roads are already provided it shall be accommodated accordingly.
Detailed Development Plans
(i) New Jaipur : The new Jaipur area is earmarked with Green City and Heritage City, in this respect a detailed project is to be prepared.
(ii) Amanisha nala is to do be developed as life line of the city. It starts from foot hills of Nahrgarh and flows through Jaipur city in north to south direction and culminates in to Dhund River. The length of this nala is about 48 K.m. Many other nalas of the city i.e. Nahri Ka Naka nala, Ganda nala and Jawahar nala also merge with Amanisha nala.
The Hon'ble High Court has passed an interim decision about the width of Amanisha nala in the matter of P.N. Mendola V/s State Govt. and other on 16.9.09. It was directed by the Court to maintain the width of nala from 150 ft. (47mtr.) to 210 ft. (about 70 mtr.). In compliance of the Court's decision the minimum width of nala is kept 47 mtr. and to a maximum as per actual width available. The same shall be decided accordingly while preparing Amanisha Nala development Plan to be taken up as a project. While implementing the project, if there is any discrepancy in the MDP 2025 land use map and in the project regarding the alignment and land use, the detailed plan shall be final and it shall be treated as part of Master Plan. The Amanisha Nala area is considered as Special Area.
(iii) Prithviraj Nagar: The Hon'ble High Court has passed a decision about Prithvi Raj Nagar scheme on 29.10.10. In compliance of the Hon'ble High Court's decision, and in furtherance:
(i) to designate Scheme Area as a special area in the plan
(ii) to follow road network plan as was suggested by the committee constituted by the committee/State govt. for P.R.N. scheme as guidance and further changes with respect to road network while implementing the plan, due to construction at site if considered, to this effect, it shall be treated as part of MDP 2025 proposals.
(iv) Jawahar Circle The area around Jawahar Circle shall be treated for Special project area and the land use may be governed as shown in the Master Plan. To this effect detailed project/area details shall be construed as part of Master Plan.
- All plots situated at junctions of 18 mtr. and above where rotaries/traffic islands are provided for regularisation of traffic and all plots situated on either side of flyovers/ROB are barred from Mixed Land use /Commercial use permission in future. Existing establishments may be continued and regularised as per policy of State Government. New permission shall not be granted, if traffic generation activities are sought to be established such as Restaurants, Showrooms, Big commercial establishments etc. Only convenient shops or mixed use can be considered as part of commercial activities on such places.
- The isolated industrial uses which have come amidst the developed residential area shall be shifted in phased manner by drawing development plans in consultation with Industries Department and RIICO. These pockets shall be treated as special areas (even otherwise indicated in the map). The State Government shall take final view of the land uses on all such cases.