Here it is pertinent to note that the existing polluting industries within Surat city area was proposed to be shifted to village Pinjarat in the huge Government Land in the Draft Development Plan - 2035 published u/s 13 of the Act, on 10.05.2016 and it is proposed that once the polluting industries are shifted than the area so released from the polluting industries may be used for residential development as per the regulations of existing residential zone. However, the village Pinjarat where these industries were planned to be shifted, has now been excluded from SUDA's jurisdiction after Government of Gujarat's notification of 24.10.2016. The industrial shifting zone is continued as proposed in the published Draft Development Plan – 2035. The State Government shall develop the area earmarked earlier for industrial zone in the village Pinjarat by forming a SPV or by any other mode for accommodating the industries shifted out of the industrial shifting zone.
SURAT URBAN DEVELOPMENT AUTHORITY | Page | 217
C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C
2017
Moreover, SUDA has conceived the plan to develop industrial growth region having 1.445 km width from Hazira to the existing BG Delhi Mumbai railway line near Gothan admeasuring. But this SIGR (Surat industrial Growth Region) proposed through Sandhiyer, Khalipor, Madhar, Kareli and Bharundi villages, which are excluded from SUDA's jurisdiction after Government of Gujarat's notification dated 24.10.2016 is now affected.
The zoning proposal in the new development area after exclusion of villages is shown in the Figures below.
Figure 69 Map showing all Residential zone

DEVELOPMENT PLAN 2035 | 2017
Figure 70 Map showing all Industrial growth region

Figure 71 map showing industrial zone

SURAT URBAN DEVELOPMENT AUTHORITY | Page |219
C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C
2017
Figure 72: Public Purpose Zone Proposals - DP 2035

Figure 73 Recreational Zone Proposals- DP 2035

SURAT URBAN DEVELOPMENT AUTHORITY | Page |220
DEVELOPMENT PLAN 2035 2017
Figure 74 map showing all transportation link and communication zone

The proposed land use of the SUDA area in the 985.16 Km² for the target year of 2035 after exclusion of villages now remains is shown in the table below. The existing landuse and landuse proposed at the time of publication u/s 13 is also mentioned in the said table.
- C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C
2017
| Landuse | Existing - 2015 | Proposed - 2035 (u/s 16) | Proposed - 2035 (u/s 9) | ||||
| Area Km2 | %age of Urbanize d Land | Area Km2 | %age of Urbanize d Land | Area Km2 | %age of Urbaniz ed Land | ||
| 1 Residential | 123 | 48 | 346.73 | 50.93 | 357.67 | 45.45 | |
| Residential Zone DP - 2004 | 166.54 | 166.54 | |||||
| Proposed Residential Zone DP- 2035 | 144.63 | 150.80 | |||||
| Residential Zone 90 m ORR | 20.06 | 20.06 | |||||
| Gamtal | 11.15 | 14.20 | |||||
| Industrial Shift Zone | 4.35 | 4.35 | |||||
| 2 Commercial | 5 | 2 | 10.48 | 1.53 | 11.82 | 1.50 | |
| 3 Industrial | 67 | 26 | 112.96 | 16.59 | 136.30 | 17.32 | |
| General Industrial Zone | 100.89 | 117.19 | |||||
| Obnoxious and Hazardous Industrial Zone | 12.07 | 19.11 | |||||
| 4 Public Purpose | 14 | 6 | 47.87 | 7.02 | 63.16 | 8.03 | |
| Public Purpose Zone | 10.41 | 11.07 | |||||
| Educational Zone | 5.57 | 6.10 | |||||
| Reservations | 31.89 | 36.54 | |||||
| DREAM City Zone | - | 9.45 | |||||
| 6 Recreational | 2 | 1 | 39.48 | 5.80 | 45.97 | 5.84 | |
| 7 Traffic and Transportation | 44 | 17 | 95.26 | 13.99 | 131.89 | 16.76 | |
| Transportation Zone | 94.46 | 131.09 | |||||
| Logistics Park | 0.80 | ||||||
DEVELOPMENT PLAN 2035 | 2017
| Urbanized area | 255 | 100 | 680.92 | 100 | 786.90 | 100 | |
| Agriculture | 730 | 235.45 | 472.58 | ||||
| Water Bodies and Other Non-Urbanized Area | 68.79 | 92.05 | |||||
| Total SUDA | 985 | 985.16 | 1351.53 |
As per the proposed landuse table, the composition of urbanised and non-urbanised area is shown in the Table below.
| Proposed in 2004 DP for 2011 | Existing - 2015 | Proposed – 2035 (u/s 16) | Proposed – 2035 (u/s 13) | |||||
| Area (Km2) | %age | Area (Km2) | %age | Area (Km2) | %age | Area (Km2) | %age | |
| Urbanised | 312.51 | 44 | 255 | 26 | 680.92 | 69 | 786.90 | 58 |
| Non- urbanised | 409.49 | 56 | 730 | 74 | 304.24 | 31 | 564.63 | 42 |
| Total SUDA | 722.00 | 100 | 985 | 100 | 985.16 | 100 | 1351.53 | 100 |
The urbanised area has increased from 58% to 69% as the rural settlements excluded from the SUDA boundary mainly comprises of non-urbanised proposed agricultural zone.
DEVELOPMENT PLAN 2035
2017
Figure 75: Draft DP 2035 submitted u/s 16

Page