This Code (Part 6/Subsection 7A) gives recommendations regarding modular planning, component sizes, prefabrication systems, design considerations, joints and manufacture, storage, transportation and erection of prefabricated concrete elements for use in buildings and such related requirements for prefabricated concrete.
Part 6 Section 7APrefabricated Concrete
b) Provisions relating to prefab systems have been updated.
c) Detailed provisions on diaphragm action of floor systems have been included.
d) Emulative system has been categorized and detailed with respect to its definition, analysis, design, detailing, etc.
e) Design considerations have been updated where accidental impact due to vehicles has been included.
f) Provisions and testing procedures for water tightness of joints have been included.
g) Some of the typical precast joint details have been illustrated.
h) Provisions relating to fire resistance testing of prototypes under sustained load has been provided for.
j) Connection between adjacent prefabricated members only through frictional resistance has been removed and suggestions for resistance using shear has been included.
k) Provisions on site prefabrication have been updated.
m) Guidelines (restriction on the number of components) on vertical stacking on ground have been included.
n) The time for which a chosen component of a lot to be loaded as per the load test has been modified.
p) Provisions for tolerances in erection and associated design considerations have been included.
q) An annex has been included on common defects, their causes and remedies which cover dimensional deviations, cracks, honeycombing, damages, strand slippage, alignment, etc.
The information contained in this Subsection is largely based on IS 15916 : 2010 ‘Building design and erection using prefabricated concrete — Code of practice’. Annex A provides information relating to common defects and remedies related prefabricated concrete construction.
All standards, whether given herein above or cross-referred to in the main text of this Subsection, are subject to revision. The parties to agreement based on this Subsection are encouraged to investigate the possibility of applying the most recent editions of the standards.
For the purpose of deciding whether a particular requirement of this Subsection is complied with, the final value, observed or calculated, expressing the result of a test or analysis, shall be rounded off in accordance with IS 2 : 1960 ‘Rules for rounding off numerical values (revised)’. The number of significant places retained in the rounded off value should be the same as that of the specified value in this Subsection.
7A Prefabricated Concrete
For the purpose of this Subsection, the following definitions shall apply.
2.1 Authority Having Jurisdiction — The authority which has been created by a statute and which, for the purpose of administering the Code/Part, may authorize a committee or an official or an agency to act on its behalf; hereinafter called the ‘Authority’.
2.2 Basic Module — The fundamental module used in modular coordination, the size of which is selected for general application to building and its components.
NOTE — The value of the basic module has been chosen as 100 mm for the maximum flexibility and convenience. The symbol for the basic module is M.
2.3 Cellular Concrete — The material consisting of an inorganic binder (such as lime or cement or both) in combination with a finely ground material containing siliceous material (such as sand), gas generating material (for example, aluminium powder), water and harmless additives (optional); and/or steam cured under high pressure in autoclaves.
2.4 Components — A building product formed as a distinct unit having specified sizes in three dimensions.
2.5 Composite Members — Structural members comprising prefabricated structural units of steel, prestressed concrete or reinforced concrete and cast in-situ concrete connected together in such a manner that they act monolithically.
2.6 Diaphragm — It is a horizontal or nearly horizontal structural system (for example, reinforced concrete floors and horizontal bracing systems), which transmits lateral forces to vertical elements that resist earthquake-induced inertia effects.
2.7 Increments — Difference between two homologous dimensions of components of successive sizes.
2.8 Light-Weight Concrete — Concrete of substantially lower unit weight than that made from gravel or crushed stone.
2.9 Module — A unit of size used in dimensional coordination.
2.10 Modular Coordination — Dimensional coordination employing the basic module or a multimodule.
NOTE — The purposes of modular co-ordination are,
a) to reduce the variety of component sizes produced, and
b) to allow the building designer greater flexibility in the arrangement of components.
2.11 Modular Grid — A rectangular coordinate reference system in which the distance between consecutive lines is the basic module or a multimodule. This multimodule may differ for each of the two dimensions of the grid.
2.12 Multimodule — A module whose size is a selected multiple of the basic module.
2.13 Prefabricate — To fabricate components or assembled units prior to erection or installation in a building.
2.14 Prefabricated Building — The partly/fully assembled and erected building, of which the structural parts consist of prefabricated individual units or assemblies using ordinary or controlled materials, including service facilities; and in which the service equipment may be either prefabricated or constructed in-situ.
2.15 Sandwich Concrete Panels — Panels made by sandwiching an insulation material between two layers of reinforced/prestressed concrete to act as insulation for concrete panels.
2.16 Self Compacting Concrete — Concrete that is able to flow under its own weight and completely fill the voids within the formwork, even in the presence of dense reinforcement without any vibration, whilst maintaining homogeneity without segregation.
2.17 Shear Connectors — Structural elements, such as anchors, studs, channels, loops and spirals, intended to transmit the shear between the prefabricated member and the cast in-situ concrete and also to prevent separation at the interface.
2.18 System — It is a particular method of construction of buildings with certain order and discipline using the prefabricated components which are inter-related in functions and are produced based on a set of instructions.
2.19 Unit — Building material formed as a simple article with all three dimensions specified, complete in itself but intended to be part of a compound unit or complete building. Examples are brick, block, floor panel, wall panel, etc.
2.20 Emulative Detailing System — A connection detailing system for precast concrete structures that has structural performance equivalent to that of a conventionally designed, cast-in-situ, monolithic concrete structure
2.21 Jointed Detailing System — A connection detailing system for precast concrete structures that has individual precast components separated from each other but connected using special connections such as welded or bolted plates.
3Materials, Plans and Specifications
3.1 Materials
Use of materials for plain, reinforced concrete and prestressed concrete shall satisfy the requirements of Part 6 ‘Structural Design, Section 5 Concrete, Subsection 5A Plain and Reinforced Concrete and Subsection 5B Prestressed Concrete’ of the Code. Connections and jointing materials shall be in accordance with 8.3.
3.1.1 While selecting the materials for prefabrication, the following characteristics shall be considered:
a) Easy availability;
b) Light weight for easy handling and transport;
c) Strength;
d) Thermal insulation property;
e) Easy workability;
f) Water absorption;
g) Serviceability along with durability;
h) Non-combustibility/fire resistance rating;
j) Sound insulation;
k) Easy assembly and compatibility to form a complete unit;
m) Economy; and
n) Any other special requirement in a particular application.
3.2 Plans and Specifications
The detailed plans and specifications shall cover the following:
a) Such drawings shall describe the elements and the structure and assembly including all required data of physical properties of component materials, material specification, strength of concrete for demoulding, casting/ erection tolerance and type of curing to be followed.
b) Details of connecting joints of prefabricates shall be given to an enlarged scale.
c) Site or shop location of services, such as installation of piping, wiring or other accessories integral with the total scheme shall be shown separately.
d) Data sheet indicating the location of the inserts and acceptable tolerances for supporting the prefabricate during erection, location and position of doors/windows/ventilators, etc, if any.
e) The drawings shall also clearly indicate location of handling arrangements for lifting and handling the prefabricated elements. Sequence of erection with critical check points and measures to avoid stability failure during construction stage of the building.
4Modular Coordination, Architectural Treatment and Finishes
4.1 Modular Coordination
The basic module shall be adopted. After adopting this, further work is necessary to outline suitable range of multimodules with greater increments, often referred to as preferred increments. A set of rules as detailed below would be adequate for meeting the requirements of conventional and prefabricated construction.
These rules relate to the following basic elements:
a) The planning grid in both directions of the horizontal plan shall be:
-
15M for industrial buildings, and
-
3M for other buildings.
The centre lines of load bearing walls should preferably coincide with the gridlines.
b) The planning module in the vertical direction shall be 2M for industrial buildings and 1M for other buildings.
c) Preferred increments for sill heights, doors, windows and other fenestration shall be 1M.
d) In the case of internal columns, the grid lines shall coincide with the centre lines of columns. In case of external columns and columns near the lift and stair wells, the grid lines shall coincide with centre lines of the column in the topmost storey.
4.2 Architectural Treatment and Finishes
In general, prefabricated systems provide better opportunity to achieve superior finishes leading to an array of aesthetically pleasing options. The architectural elevational treatments, form and features can also be effectively incorporated in the structures with careful advanced planning. In addition, detailed coordination between the architectural and structural design team during the planning stage for panel joints and false joints is necessary. The purpose of finishes and architectural treatment is not only to give prefabricated buildings an individual character but also to effect better performance and greater user satisfaction.
Treatment and finishes have to be specified keeping in view the requirements of protection, function and aesthetics of internal and external spaces and surfaces.
While deciding the type of architectural treatment and finishes for prefabricated buildings, the following points should be kept in view:
a) Suitability for mass production techniques;
5.1 The dimensions of precast elements shall meet the design requirements. However, the actual dimensions shall be the preferred dimensions as follows:
a) Flooring and roofing scheme — Precast slabs or other precast structural flooring units:
-
Length — Nominal length shall be in multiples of 1 M;
-
Width — Nominal width shall be in multiples of 0.5 M; and
-
Overall Thickness — Overall thickness shall be in multiples of 0.1 M.
b) Beams:
-
Length — Nominal length shall be in multiples of 1 M;
-
Width — Nominal width shall be in multiples of 0.1 M; and
-
Overall Depth — Overall depth of the floor zone shall be in multiples of 0.1 M.
c) Columns:
-
Height — Height of columns for industrial building and other buildings shall be in multiples of 1 M; and
-
Lateral Dimensions — Overall lateral dimension or diameter of columns shall be in multiples of 0.1 M.
d) Walls:
Thickness — The nominal thickness of walls shall be in multiples of 0.1 M.
e) Staircase:
Width — Nominal width shall be in multiples of 1 M.
f) Lintels:
-
Length — Nominal length shall be in multiples of 1 M;
-
Width — Nominal width shall be in multiples of 0.1 M; and
-
Depth — Nominal depth shall be in multiples of 0.1 M.
g) Sunshades/Chajja Projections:
-
Length — Nominal length shall be in multiples of 1 M.
-
Projection — Nominal length shall be in multiples of 0.5 M.
5.2 Casting Tolerances of Precast Components
- Sl Product Tolerances Product (see Key No.)
- No.
- (1) (2) (3)
- i) Length:
- a) ± 5 mm 1, 7
- b) ± 5 mm or ± 0.1 percent, whichever is greater 2, 3, 8
- c) ± 0.1 percent subject to maximum of +5 -10 mm 4
- d) 1) ± 2 mm for length below and up to 500 mm 5
-
- ± 5 mm for length over 500 mm
6Prefabrication Systems and Structural Schemes
6.1 The word ‘system’ refers to a particular method of construction of buildings using the prefabricated components which are inter-related in functions and are produced to a set of instructions. With certain constraints, several plans are possible, using the same set of components. The degree of flexibility varies from system to system. However, in all the systems there is a certain order and discipline.
6.2 The following aspects, among others, are to be considered in devising a system:
a) Effective utilization of spaces;
b) Straight and simple walling scheme;
c) Limited sizes and numbers of components;
d) Limited opening in bearing walls;
e) Regulated locations of partitions;
f) Standardized service and stair units;
g) Limited sizes of doors and windows with regulated positions;
h) Structural clarity and efficiency;
j) Suitability for adoption in low rise and high rise building;
k) Ease of manufacturing, storing and transporting;
m) Speed and ease of erection;
n) Effective utilization of available equipment, plant and machinery; and
p) Simple jointing system.
6.3 Prefabrication Systems
The system of prefabricated construction depends on the extent of the use of prefabricated components, their materials, sizes and the technique adopted for their manufacture and use in building.
6.3.1 Types of Prefabrication Components
The prefabricated concrete components such as those given below may be used which shall be in accordance with relevant Indian Standards (see Part 5 'Building Materials' of the Code) and the accepted standards [6-7A(1)], where available:
a) Reinforced/prestressed concrete channel unit,
b) Reinforced/prestressed concrete slab unit,
c) Reinforced/prestressed concrete beams,
d) Reinforced/prestressed concrete columns,
e) Reinforced/prestressed concrete hollow core slab,
f) Reinforced concrete waffle slab/shells,
g) Reinforced/prestressed concrete wall elements,
h) Hollow/solid concrete blocks and battens,
j) Precast planks and joists for flooring and roofing,
7Design Considerations and Requirements
7.1 Design Considerations
7.1.1 Precast structures could be analyzed either as an emulative systems or as a jointed system. However, emulative analysis is typically preferred where the structure is detailed such that the overall behaviour of the building in its service life will be similar to a RCC building constructed in-situ. In emulative approach, the precast structure is analyzed as a monolithic one and the joints in them designed to take the forces of an equivalent discrete system. Resistance to horizontal loading shall be provided by having appropriate moment and shear resisting joints or placing shear walls (in diaphragm braced frame type of construction) in two directions at right angles or otherwise. No account is to be taken of rotational stiffness, if any, of the floor-wall joint in case of precast bearing wall buildings. The individual components shall be designed, taking into consideration the appropriate end conditions and loads at various stages of construction. The components of the structure shall be designed for loads and reactions in accordance with Part 6 'Structural Design, Section 1 Loads, Forces and Effects' of the Code. In addition, members shall be designed for handling, erection and impact loads that might be expected during handling and erection.
NOTE — Rotational stiffness can be accounted for long/short term deflection calculations provided that the approach is mutually agreed by the design team and approved by the Authority.
7.1.2 In some conventional forms of construction, experience has shown that structures are capable of safely sustaining abnormal conditions of loading and remaining stable after the removal of primary structural members. It has been shown that some forms of building structure and particularly some industrialized large
panel systems have little reserve strength to resist forces not specifically catered for in the design. In light of this, therefore, recommendations made in 7.1.3 to 7.1.10 should be kept in mind for ensuring stability of such structure.
7.1.3 Adequate buttressing of external wall panels is important since these elements are not fully restrained on both sides by floor panels. Adequate design precautions may be taken by the designer. External wall panel connections are likely to be the weakest points of a precast panel building, if not designed properly.
7.1.4 It is equally important to provide restraint to all load bearing elements at the corners of the building. These elements and the external ends of cross-wall units should be stiffened either by introducing columns as connecting units or by jointing them to non-structural wall units which in emergency may support the load. Jointing of these units should be done bearing in mind the need for load support in an emergency.
7.3Bearing for Precast Units
7.3.1 Jointed Precast Detailing
The precast units shall have a bearing of at least of 100 mm on masonry supports and of 75 mm at least on steel or concrete. Steel angle shelf bearings shall have a 100 mm horizontal leg to allow for a 50 mm bearing exclusive of fixing clearance. When deciding to what extent, if any, the bearing width may be reduced in special circumstances, factors, such as loading, span, height of wall and provision of continuity, shall be taken into consideration.
7.3.2 Emulative Precast Detailing
In emulative precast detailing, the structure under service conditions behaves similar to a cast-in-situ structure and inherits the redundancy due to continuity. Typically, the components are tied together with appropriate steel ties and connected using a cast-in-situ 'stitch' concrete pour for near monolithic continuity. The bearing for the building components thus becomes a critical concern only during the erection stages. The precast members, in emulative detailing system, shall have a bearing of at
least 40 mm on concrete support components. In cases, where the supports are in steel or masonry system where emulative detailing is not followed in local limited areas, bearing of at least 75 mm for steel support and 100 mm for masonry support should be provided. Otherwise, for both systems, bearing of at least 40 mm should be provided at the structural engineer's discretion. In special circumstances, where additional temporary supports/shoring is provided during erection, bearing of at least 25 mm should be acceptable at the structural engineer's discretion. Such temporary supports shall be kept in place until the ‘stitch’ concrete pour gains at least 70 percent of the final design strength.
7.2Design Requirements for Safety Against Progressive Collapse
7.2.1 Prefabricated buildings shall be designed with proper structural integrity to avoid situations where damage to small areas of a structure or failure of single
elements may lead to collapse of major parts of the structure.
The following precaution may generally provide adequate structural integrity:
a) All buildings should be capable of safely resisting the minimum horizontal load of 1.5 percent of characteristic dead load applied at each floor or roof level simultaneously (see Fig. 3).
b) All buildings shall be provided with effective horizontal ties,
-
around the periphery;
-
internally (in both directions); and
-
to columns and walls.
c) All buildings of five or more storeys shall be provided with vertical ties.
In proportioning the ties, it may be assumed that no other forces are acting and the reinforcement is acting at its characteristic strength (that is, the material factor of safety is not applicable).
Normal procedure may be to design the structure for the usual loads and then carry out a check for the tie forces.
7.2.2 Continuity and Anchorage of Ties
Bars shall be lapped, welded or mechanically joined as in accordance with Part 6 ‘Structural Design, Section 5 Concrete, Subsection 5A Plain and Reinforced Concrete’ of the Code.
7.2.3 Design of Ties
7.2.3.1 Peripheral ties
At each floor and roof level an effectively continuous tie should be provided within 1.2 m of the edge of the building or within the perimeter wall (see Fig. 4).
The tie should be capable to resist a tensile force of Ft equal to 60kN or (20 + 4N)kN whichever is less, where N is the number of storeys (including basement).
7.2.3.2 Internal ties
These are to be provided at each floor and roof level in two directions approximately at right angles. Ties should be effectively continuous throughout their length and be anchored to the peripheral tie at both ends, unless continuing as horizontal ties to columns or walls (see Fig. 5). The tensile strength, in kN per metre width shall be the greater of,
8.1 The design of joints shall be made in the light of their assessment with respect to the following considerations:
a) Feasibility — The feasibility of a joint shall be determined by its load carrying capacity in the particular situation in which the joint is to function.
b) Practicability — Practicability of joint shall be determined by the amount and type of material required in construction; cost of material, fabrication and erection and the time for fabrication and erection.
c) Serviceability — Serviceability shall be determined by the joints/expected behaviour to repeated or possible overloading and exposure to climatic or chemical conditions.
d) Fire rating — The fire rating for joints of precast components shall be higher or at least equal to connecting members.
NOTE — Fire resistance testing under sustained loading may also be carried out on a prototype, as mutually agreed to between the parties concerned.
e) Appearance — The appearance of precast components' joints shall merge with architectural aesthetic appearance and shall not be physically prominent compared to other parts of structural components.
f) Water tightness of joints — In buildings, the external joints between precast elements should be water tight to ensure the durability requirements. If the joints are not water tight, it may lead to corrosion of reinforcing steel due to exposure to moisture thereby impacting the structural integrity. Also, water can enter inside the building and impact the functionality in service life of the building. In case of precast reinforced concrete wall buildings, joints of external walls, in addition to their structural efficiency, shall be watertight. For non-load bearing/façade walls the connections shall allow free movement of
the walls due to temperature changes. This can be achieved by suitably shaping the joint or by sealing compounds. In load bearing external walls, the horizontal and vertical joints shall be filled with non-shrink non-metallic high strength cementitious grout followed by backer rod (bond breaker such as polyethylene film also can be used in place of backer rod) with sealant at the external side. The sealing compound shall be approved by the Engineer-in-Charge and shall have a long life to avoid frequent repair of the joints. It should be noted that the sealant is provided as an additional line of defense against water entry. In cases of moderate water exposure, the joints could be detailed with cement grout only with appropriate additional water proofing treatment instead of sealant (see 9.4).
8.2 The following are the requirements of a structural joint:
b) Recognition of the constraints imposed by the level of workmanship available;
c) Possibility of using different types of finishes;
d) Use of finishes and architectural treatment for the creation of a particular architectural character in individual buildings and in groups of buildings by the use of colour, texture, projections and recesses on surfaces, etc;
e) Incorporation of structural elements like joists, columns, beams, etc, as architectural features and the treatment of these for better overall performance and appearance;
f) Satisfactory finishing of surfaces; and
g) Use of light weight materials to effect economy in the structural system.
Some of the acceptable methods of finishes integral with the precasting are:
-
Concrete surface moulded to design/shape;
-
Laid-on finishing tiles fixed during casting;
-
Finishes obtained by washing, tooling, grinding, grooving of hardened concrete;
-
Exposed aggregates; and
-
Other integral finishes.
e) ±10 mm 6, 9,10ii) Thickness/cross-sectional dimensions:a) ± 3 mm 1b) ± 3 mm or 0.1 percent, whichever is greater 2, 8c) 1) ± 2 mm up to 300 mm wide 4, 5
- ± 3 mm greater than 300 mm wide
d) ± 2 mm 3, 7e) ± 4 mm 6, 9, 10iii) Straightness/Bow:a) ± 5 mm or 1/750 of length, whichever is greater 2, 4, 8b) ± 3 mm 1, 5c) ± 2 mm 7iv) Squareness — When considering the squareness of the corner, the longer of two adjacent sides being checked shall be taken as the base line, and the following tolerances shall apply:a) The longer side shall not vary in length from the perpendicular by more than 5 mm 2, 5, 8b) The shorter side shall not vary in length from the perpendicular by more than 3 mm 1, 7c) The shorter side shall not be out of square line for more than +2 -5 mm 4v) Twist — Any corner shall not be more than the tolerance given below from the plane containing the other three corners:a) 1) Up to 600 mm in width and up to 6 m in length 5 mm 2, 8
- Over 600 mm in width and for any length 10 mm
b) ± 1/1 500 of dimension or ± 5 mm. whichever is less 4c) ± 3 mm 1d) ± 1 mm 7vi) Flatness — The maximum deviation from 1.5 m straight edge placed in any position on a nominal plane surface shall not exceed:a) ± 5 mm 2, 8b) ± 3 mm 4c) ± 2 mm 1, 7d) ± 4 mm or maximum of 0.1 percent length 5Key No. for product reference:1 Channel unit.2 Ribbed slab unit/hollow slab.3 Waffle unit.4 Large panel prefabrication.5 Cellular concrete floor/roof slabs.6 Prefabricated brick panel.7 Precast planks.8 Ribbed/plain wall panel.k) Precast joists and trussed girders,
m) Light weight/cellular concrete slabs/wall panels,
n) Precast lintel and Chajjas,
p) Large panel prefabricates,
q) Reinforced/prestressed concrete trusses,
r) Reinforced/prestressed roof purlins,
s) Precast concrete L-panel unit,
t) Prefabricated concrete double-T unit,
u) Prefabricated brick panel unit,
w) Prefabricated sandwich concrete panels,
y) Precast concrete foundation, and
z) Precast concrete staircase.
There may be other types of components which may be used with the approval of the Authority.
NOTE — The elements may be cast at the site or off the site.
6.3.2 Open Prefabrication System
There are two categories of open prefab system depending on the extent of prefabrication used in the construction as given in 6.3.2.1 and 6.3.2.2.
6.3.2.1 Partial prefabrication system
This system basically uses precast roofing and flooring components and other minor elements like lintels, Chajjas, kitchen sills in conventional building construction. The structural system could be in the form of in-situ framework or load bearing walls.
6.3.2.2 Full prefabrication system
In this system almost all the structural components are prefabricated. The filler walls may be of brick/block masonry or of any other locally available material.
6.3.3 Large Panel Prefabrication System
This system is based on the use of large prefab components. The components used are precast concrete large panels for walls, floors, roofs, balconies, staircases, etc. The casting of the components could be at the site or off the site.
Depending upon the extent of prefabrication, this system can also lend itself to partial prefab system and full prefab system.
Structural scheme with precast large panel walls can be classified as given in 6.3.3.1 to 6.3.3.3.
6.3.3.1 Precast Walls
6.3.3.1.1 Based on the structural functions of the walls, the precast walls may be classified as:
a) Load bearing walls,
b) Non-load bearing walls, and
c) Shear walls.
6.3.3.1.2 Based on construction, the precast walls may be classified as:
a) Homogeneous walls — which could be solid, hollow or ribbed; and
b) Non-homogeneous walls — these could be composite or sandwich panels.
6.3.3.1.3 Based on their locations and functional requirements the precast walls may also be classified as:
a) External walls, which may be load bearing or non-load bearing depending upon the lay-out; these are usually non-homogeneous walls of sandwiched type to impart better thermal comfort; they can also act as shear walls to resist horizontal loads with appropriate design and
b) Internal walls providing resistance against vertical loads, horizontal loads, fire, etc; these are normally homogeneous walls.
6.3.3.2 Precast floors
6.3.3.2.1 Depending upon the composition of units, precast flooring units may be classified as:
a) Homogeneous floors — which may be of solid slabs, cored slabs, ribbed or waffle slabs and precast slabs with structural topping (60-75 mm thick) designed as a composite system; and
b) Non-homogeneous floors — which may be of multi-layered units with combinations of light weight concrete or reinforced/prestressed concrete, with filler blocks.
6.3.3.2.2 Depending upon the way the loads are transferred, the precast floors may be classified as one way, two way or cantilever systems:
a) One way system transfers loads to supporting members in one direction only. The precast elements which come under this category are channel slabs, hollow core slabs, channels and ties system, light weight/cellular concrete slabs, etc.
b) Two way systems transfers loads in both the directions imparting loads on the four edges. The precast elements under this category are room sized panels, two way ribbed or waffle slab systems, etc.
c) Cantilever components are supported on one
edge or two adjacent edges and other ends without supports.
6.3.3.3 Staircase systems
Staircase system may consist of single flights with in-built risers and treads in the element. The flights are normally unidirectional transferring the loads to supporting landing slabs or load bearing walls.
6.3.4 Box Type Construction
In this system, room size units are prefabricated and erected at site. Toilet and kitchen blocks may also be similarly prefabricated and erected at site.
NOTE — This system derives its stability and stiffness from the box units which are formed by four adjacent walls. Walls are jointed to make rigid connections among themselves. The box unit rests on foundation - conventional or precast.
7.1.5 In prefabricated construction, the possibility of gas or other explosions which can remove primary structural elements leading to progressive collapse of the structure shall be taken into account. It is, therefore, necessary to consider the possibility of progressive collapse in which the failure or displacement of one element of a structure causes the failure or displacement of another element and results in the partial or total collapse of the building.
7.1.6 Provision in the design to reduce the probability of progressive collapse is essential in buildings of over six storeys and is of relatively higher priority than for buildings of lower height.
7.1.7 It is necessary to ensure that any local damage to a structure does not spread to other parts of the structure remote from the point of mishap and that the overall stability is not impaired, but it may not be necessary to stiffen all parts of the structure against local damage or collapse in the immediate vicinity of a mishap, unless the design briefs specifically requires this to be done. The requirements as specified at 7.2 shall be followed to prevent progressive collapse of the structure.
7.1.8 Additional protection may be required in respect of damage from vehicles; further, it is necessary to consider the effect of damage to or displacement of a load-bearing member by an uncontrolled vehicle. It is strongly recommended that important structural members are adequately protected by concrete kerbs or similar method.
In areas with possibility of passenger vehicular impact, the precast components should be designed for a horizontal load of 27 kN, in any direction, acting at heights between 450 mm and 700 mm on an area not
larger than 300 mm × 300 mm to produce maximum load effect. This load is not required to act concurrently with any handrail or guard rail system loads.
7.1.9 In all aspects of erection that affect structural design, it is essential that the designer should maintain a close liaison with the builder/contractor regarding the erection procedures to be followed.
7.1.10 Failures that have occurred during construction appear to be of two types. The first of these is the pack-of-cards type of collapse in which the absence of restraining elements, such as partitions, cladding or shear walls, means that the structure is not stable during the construction period. The second is the situation in which one element falls during erection and lands on an element below. The connections of the lower element then give way under the loading, both static and dynamic, and a chain reaction of further collapse is set up.
7.1.10.1 A precaution against the first form of failure is that the overall stability of a building shall be considered in all its erection stages as well as in its completed state. All joints that may be required to resist moments and shears during the erection stage only, shall be designed with these in mind. Temporary works required to provide stability during construction shall be designed carefully.
7.1.10.2 To guard against the second form of failure, that is, the dropping of a unit during erection, particular attention shall be given to the details of all pre-formed units and their to ensure that they are sufficiently robust to withstand the maximum stresses that can arise from site conditions. Precast concrete construction generally shall be capable of withstanding the impact forces that can arise from bad workmanship on site.
7.1.11 The design shall take care of requirements owing to erection given at 10.11.
7.1.12 In case of buildings whose floors are capable of providing rigid horizontal diaphragm action, the total shear in any horizontal plane shall be distributed to the various vertical elements of lateral forces resisting system, assuming the floors to be infinitely rigid in the horizontal plane.
In case of building whose floor diaphragms cannot be treated as infinitely rigid in their own plane, the lateral shear at each floor shall be distributed to the vertical elements resisting the lateral forces, considering the in-plane flexibility of the diaphragms.
1 A floor diaphragm shall be considered to be flexible, if it deforms such that the maximum lateral displacement measured from the chord of the deformed shape at any point of the diaphragm is more than 1.5 times the average displacement of the entire diaphragm.
2 Reinforced concrete monolithic slab-beam floors or those consisting of prefabricated/precast elements with topping reinforced screed can be taken as a rigid diaphragm.
7.1.12.1 Floor systems play a key role in the lateral resistance of building structures by providing diaphragm action. Diaphragm action serves to,
a) transfer lateral loads at each level to the lateral load-resisting elements (walls, frames); and
b) unite individual lateral load-resisting elements into a single lateral load-resisting system.
These actions are crucial in allowing the lateral (load-resisting) system to perform as intended. Diaphragm action occurs by virtue of the in-plane stiffness inherent in the floor system. Accordingly, significant in-plane forces may develop in the diaphragm during lateral loading. In this regard, the panelled nature of floor systems in precast concrete construction can present challenges in the seismic design of diaphragms. These design challenges may pertain to providing adequate strength, stiffness and in cases, ductility in the diaphragm and diaphragm connections.
7.1.12.2 Standard analysis methods for diaphragm design
The magnitude of the inertia force at each floor level is estimated using a capacity design approach or a diaphragm design force distribution based on equivalent lateral loads. A key design step is to transform the diaphragm design forces into internal actions. For regular floor plans, a 'horizontal plate girder' analogy is typically used in design. In this approach, diaphragm design forces are typically applied at each level as a distributed in-plane load along the length of the diaphragm. The resulting girder internal forces are used to determine the amount of flexural reinforcement (chord steel), shear (web) reinforcement, and lateral system reaction load path reinforcement (collector steel). An irregular mass distribution in plan may require the design forces to take on a smeared load configuration as the mass distribution with respect to diaphragm depth has relevance in determining the proper web reinforcement.
For more complex diaphragm configurations, a strut-and-tie method can be used. However, there is compelling evidence that the strut-and-tie method accurately predicts the behaviour of floor diaphragms in general and may become the preferred method of diaphragm analysis. See Fig. 1 and Fig. 2.
where (gk + qk) is the sum of average characteristic dead and imposed floor loads, in kN/m², and lr is the
FIG. 1 STRUCTURAL MODELS USED TO ANALYSE FLOOR DIAPHRAGMS
greater of the distance between the centre of columns, frames or walls supporting any two adjacent floor spans in the direction of the tie under consideration.
The bars providing these ties may be distributed evenly in the slabs (see Fig. 6) or may be grouped at or in the beams, walls or other appropriate positions but at spacings generally not greater than 1.5lr.
7.2.3.3 Horizontal ties to column and wall
All external load-bearing members such as columns and walls should be anchored or tied horizontally into the structure at each floor and roof level. The design force for the tie is to be greater of,
a) 2Ft kN or ls × Ft / 2.5kN, whichever is less for a column or for each metre length if there
is a wall (ls is the floor to ceiling height in metre).
b) 3 percent of the total ultimate vertical load in the column or wall at that level.
For corner columns, this tie force should be provided in each of two directions approximately at right angles.
7.2.3.4 Vertical ties (for buildings of five or more storeys)
Each column and each wall carrying vertical load should be tied continuously from the foundation to the roof level. The reinforcement provided is required only to resist a tensile force equal to the maximum design ultimate load (dead and imposed) received from any one storey.

NOTE — The floor deck is assumed to act as the web of the continuous beam and the beams at the floor periphery are assumed to act as the flanges of the continuous beam
FIG. 2 DESIGN FORCES ON A DIAPHRAGM

In situation where provision of vertical ties cannot be done, the element should be considered to be removed and the surrounding members designed to bridge the gap.
7.2.4 Key Elements
For buildings of five or more storeys, the layout should be checked to identify key elements. A key element is such that its failure would cause the collapse of more
than a limited area close to it.
The limited area defined above may be taken equal to 70m² or 15 percent of the area of the storey, whichever is lesser.
If key elements exist, it is preferable to modify the layout so that the key element is avoided.

NOTE — If there are cantilever slabs, supporting external cladding, projecting in front of the columns and these are more than 1.2 m, than peripheral tie shall go in the slab.
FIG. 4 POSITION FOR PERIPHERAL TIE

NOTE — If the peripheral tie consists of bars in an edge beam, then the bottom bars in the slabs will not be at the same level as the peripheral tie bars. It is suggested that either an additional bar be used for the peripheral tie or the internal tie bars be extended and anchored around the top bar in the beam.
FIG. 5 ANCHORING OF TIES IN SLABS

NOTE — For continuity in continuous slabs, bars are distributed evenly in a floor slab by means of lapping some bottom steel at supports, either by extending existing bars or by the addition of splice bars.
FIG. 6 CONTINUITY REQUIREMENT FOR SLAB
a) It shall be capable of being designed to transfer the imposed load and moments with a known margin of safety;
b) It shall occur at logical locations in the structure and at points which may be most readily analyzed and easily reinforced;
c) It shall accept the loads without marked displacement or rotation and avoid high local stresses;
d) It shall accommodate tolerances in elements;
e) It shall require little temporary support, permit adjustment and demand only a few distinct operation to make;
f) It shall permit effective inspection and rectification;
g) It shall be reliable in service with other parts of the building; and
h) It shall enable the structure to absorb sufficient energy during earthquakes so as to avoid sudden failure of the structure (see Note). The joint should be ductile.
NOTE — If required, tests may be carried out on prototypes to assess against the above requirement.
8.2.1 Precast structures may have continuous or hinged connections subject to providing sufficient rigidity to withstand horizontal loading. When only compressive forces are to be taken, hinged joints may be adopted. In case of prefabricated concrete elements, load is transmitted via the concrete. When both compressive force and bending moment are to be taken, rigid or welded joints may be adopted; the shearing force is usually small in the column and can be taken up by the friction resistance of the joint. Here load transmission is accomplished by steel inserted parts together with concrete. In precast structures, it is critical to minimize
relative movements of precast components under loads. Hence, connection details that rely solely on the frictional resistance under gravity loads are not permitted. The connections shall be designed using either the pure shear capacity of the connection element or based on the shear friction theory that takes the advantage of the frictional resistance of concrete components under gravity loads.
8.2.2 When considering thermal shrinkage and heat effects, provision of freedom of movement or introduction of restraint may be considered.
8.3 Following connections and jointing techniques/materials may be employed:
a) Welding of cleats or projecting steel,
b) Overlapping reinforcement, loops and linking steel grouted by concrete,
c) Reinforced concrete ties all round a slab,
f) Cement/lime grout with non-shrink additive,
g) Polymer slurry grouting at dowel cast bolts and nuts connection,
h) Rebar fastener, chemical fastener and expansion fastener,
j) Reinforcement coupler,
k) Combination of the above, and
m) Any other method proven by test.
8.4 Precast Joint details
Some of the typical precast joint details have been illustrated in Fig. 7 to Fig. 24.

SECTION AT JOINT
NOTE — Overlapping bars in grout-filled conduit are extended full-height through the structural element.
FIG. 7 LAPPED SPLICES IN LARGE CONDUIT

NOTE — Vertical bars in conduit are spliced and the system is grouted.
FIG. 8 MECHANICAL CONNECTION IN CONDUIT

FIG. 9 DIFFERENT TYPES OF MECHANICAL SPLICES FOR CONNECTION OF VARIOUS CONFIGURATIONS OF PRECAST WALLS AND FLOORS

FIG. 10 SOME MECHANICAL SPLICES USING HIGH-STRENGTH NON-SHRINK GROUT

FIG. 11 VARIATIONS OF SPLICES AND CAST-IN-PLACE CLOSURE PLACEMENTS TO CREATE VERTICAL JOINTS BETWEEN PRECAST CONCRETE ELEMENTS