Chakan is envisioned as an “Automobile Hub and Regional Centre.” It is already an established automobile manufacturing centre. Future development of this area will be shaped by a number of infrastructure projects in the region, such as the joint alignment of PMRDA and MSRDC Ring Roads, Pune-Nashik High-Speed Railway Line and Crescent Railway Line.
A regional centre will fulfil the need of a central business district in the Northern part of PMR and support the business, financial and convention requirements of the industrial hub.
| Growth Centre Area | 169.08 sq km |
|---|---|
| Population(Excluding ITP/TPS) | 3,81,153 (2041); 278563 (2031), 1,04,372 (2011) |
| Population (including ITP/TPS) | 3,91,653 (2041); 2,83,813 (2031), 1,04,372 (2011) |
| Net Population Density | 125 PPH |
| Resident workforce | 2,01,831 (2041) |
| Employment | 2,74,401 (2041) |
| Households | 1,06,171 (2041) |
| Proposed Zones | Residential (4366.75 Ha.), Industrial (Including MIDC) (6140.52 Ha. ) Logistic (466.05 Ha.) , Commercial (290.67 Ha.) |
-
Open up vacant/agricultural lands abutting the industrial area for residential development and equip them with amenities to promote the Work-Live concept.
-
Consolidate industrial and logistic development around existing MIDC and proposed MIDC Phase- 5 for the efficient functioning of proposed industrial zoning.
-
Improve the efficiency of industrial activities by strengthening the logistics hubs through strong regional infrastructure projects such as - widening of existing Talegaon-Ahmedpur, Dis. Latur ( Via Shrigonda) National highway (NH-548D), developing logistics hubs along the combined PMRDA and MSRDC Ring Road.
-
Providing connectivity through the proposed Crescent Railway Line (freight line) connecting Miraj rail route with Lonavala rail route via UruliKanchan, Sanaswadi, Chakan and Ambi for cargo movement to decongest the rail network within PMC, PCMC and serve industrial estates located along it.
-
Develop a grid network of secondary and tertiary roads for a smooth movement within the Growth Centre.
-
Improve accessibility to industrial zone for workers/residents through proposed Pune-Chakan Metro Line and its offshoot until newly planned MIDC Phase-5.Establish green-blue links by designating green beltwithin blue line of the Indrayani River.
-
Promote self-sufficient town by proposing required amenities and utilities for the projected population.
-
For affordable housing, public housing are provided at Mhalunge, Sawardari,Yevalewadi, Chimbali, Kharabwadi, Nighoje.
-
Utilization of available Gairan and Government Land.
-
Multimodal hubs of total area of 5.27 ha at Kuruli and Khalumbare,
-
Two Regional Centres at Sadumbare (17.82 ha) and Mhalunge (33.22 ha)
-
Business Centre at Nighoje (11.95 ha)
-
Town Planning Scheme: TPS 1 - Industrial along with logistic and residential (695.28 ha), TPS 2 - Logistic along with industrial and commercial (476.67 ha), TPS 3 - Residential (540.27 ha), TPS 4 - Residential (828.17 ha)
-
Industrial research and training centre near MIDC at Sawardari (6.24 ha)
-
Sports University at Indori(23.94 ha)
-
Medical college and Hospital at Sudumbare (8.42 Ha.)
-
Spiritual Centre at Sudhavadi Village near Bhandara Dongar (14.68 ha)
-
Stadium at Sangurdi(13.15 ha).
-
Exhibition cum fair ground is proposed at Kanhewadi Tarf Chakan (6.8 Ha.)
-
Riverfront development proposed at Yewalewadi and Sangurdi of total area 44.11 Ha.
-
Truck Terminus of 2.5 Ha. Is proposed at Bhamboli.








