Pirangut is positioned as a ‘Knowledge Hub’, and the key reasons for this are as follow:
-
Leverage the existing educational ecosystem in the area with the presence of premier university campuses and growing demand from educational institutes for expansion or relocation of their campuses from municipal corporation areas.
-
Need for an Integrated Design University to support emerging industries such as A l r Robotics, Green Mobility, Defence and Life sciences industriesGood regional accessibility through Mumbai-Bangalore National Highway and Pune-Kolad National Highway
-
established industrial cluster and proposed industrial zone as per RP 1997
| Village | 2011 | 2018 | 2031 | 2041 |
|---|---|---|---|---|
| Ambarwet | 2,472 | 4,546 | 5,685 | 5,970 |
| Ambegaon | 820 | 1,409 | 1,691 | 1,734 |
| Bavadhan BK | 10,438 | 29,319 | 40,023 | 42,689 |
| Bhare | 1,479 | 7,519 | 10,347 | 10,602 |
| Bhugaon | 5,949 | 22,821 | 60,926 | 93,025 |
| Bhukum | 2,859 | 6,544 | 20,848 | 33,613 |
| KasarAmboli | 5,397 | 15,897 | 31,040 | 45,296 |
| Lavale | 6,732 | 9,049 | 55,538 | 1,02,023 |
| Mukaiwadi | 989 | 1,504 | 2,430 | 3,321 |
| Nande | 1,622 | 2,208 | 2,654 | 2,869 |
| Pirangut | 14,174 | 35,255 | 59,018 | 77,247 |
| Sus | 4,862 | 18,906 | 25,770 | 26,664 |
| Uravade | 3,318 | 7,874 | 9,625 | 9,500 |
| Total | 61,111 | 1,62,853 | 3,25,594 | 4,54,553 |
The projected resident workforce based on the projected population through the URGD method is 2,14,442. Considering the proposed economic activities of all the growth centres, employment distribution was proposed based on the envisaged sectoral split for that Growth Centres. Accordingly, the employment to be generated for the Growth Centre for the year 2041 is estimated to be 97,652. The proposed residential density is about 125 PPH (12,500 persons/sq km).
Proposed Planning Divisions
For the planning of public facilities distribution, Pirangut Growth Center is divided into three sectors.
Sector one includes Bavdhan Bk, Bhugaon and Sus, Sector two include Lavale, Nande & Pirangut and Sector three contains Ambarwet, Ambegaon, Bhare, Bhukum, Kasar Amboli, Mukaiwadi and Uravade villages.
The boundaries of this planning division are shown on the Proposed Zoning Map. The projected sector-wise population statement is in Table 25.3.
| Sector | 2011 | 2018 | 2031 | 2041 |
|---|---|---|---|---|
| Sector 1 | 21,249 | 71,046 | 1,26,719 | 1,62,378 |
| Sector 2 | 22,528 | 46,513 | 1,17,210 | 1,82,138 |
| Sector 3 | 17,334 | 45,294 | 81665 | 1,10,037 |
| Total | 61,111 | 1,62,853 | 3,25,594 | 4,54,553 |
The proposed zoning would guide and determine the optimal and efficient land use for the next 20 years. The proposed zoning plan is an output of existing land use and physical conditions analysis, understanding of most pressing issues of the Growth Center, local knowledge of the place and deployment of five planning goals and allied physical planning strategies. The proposed zoning area statement is presented in Table 25.5.
Chapter 25: Growth Centre: Pirangut
Figure 25.4: Proposed Zoning Map

| Land use category | Area (ha) | Proportion of Total Developed Area (%) | Proportion of Total Area (%) |
|---|---|---|---|
| Residential | 3415.09 | 58.96% | 31.16% |
| Gaothan | 55.96 | 0.97% | 0.51% |
| Commercial | 179.43 | 3.10% | 1.64% |
| Industrial | 829.31 | 14.32% | 7.57% |
| Logistic Zone | 86.53 | 1.49% | 0.79% |
| Public and semi public | 315.31 | 5.44% | 2.88% |
| Public Utility | 30.58 | 0.53% | 0.28% |
| Transportation | 880.23 | 15.20% | 8.03% |
| Total Developed Area | 5792.44 | 100.00% | 52.85% |
| Agriculture | 2265.50 | 20.67% | |
| Afforestation | 46.34 | 0.42% | |
| Water bodies | 278.11 | 2.54% | |
| Hilltop Hill Slope | 2013.19 | 18.37% | |
| Recreational | 133.60 | 1.22% | |
| Forest | 231.32 | 2.11% |
| Tourism Development Zone | 103.75 | 0.95% |
|---|---|---|
| Green Belt | 95.93 | 0.88% |
| Total Un-developed Area | 5167.75 | 47.15% |
| Total Area | 10960.19 | 100.00% |
Translating Goals into the Plan
Proposed zoning ensures that the sectoral development goals are clearly conveyed through it. Proposed sectoral goals and their corresponding physical planning strategies are mentioned in Table 25.5.
| Goals | Development Sector Addressed | Physical Planning Strategies |
|---|---|---|
| Prudent | Employment and housing | Work- Live Hubs |
| Convenient | Roads and mass transport | Movement Lattice |
| Resilient | Environment protection | Green- Blue connectors |
| Efficient | Infrastructure and utilities | Decentralized resource management |
| Self- sufficient | Social facilities | Walk able Neighbourhoods |
For Pirangut Growth Center, the Work-Live concept is applied by:
-
Pirangut Growth Centre is divided into three nodes - first is industrial on the west side along the SH-115 and SH-130, which includes Pirangut, Kasar Amboli and Bhare. The second is residential usage on the east side of the planning area, covering Bavdhan Bk., Sus and Bhugaon. The third is the Public Semi-Public (educational) area in the middle of the planning area in Lavale village and south of planning area at Bhukum village
-
Designating residential zones within 500 m around industrial, logistics and commercial zones to minimize work-related trips for at least 30% of the resident workforce.
-
Allocating industrial, logistics, and commercial zones along the proposed mass transit corridors to reduce travel time for workforce commuting from other Growth Centers.
Land requirement for the residential zone is estimated based on a net residential density of 125 PPH. Further, 45% add-on is considered to account for amenity (15%), open spaces (10%) and roads (20%). Accordingly, the total gross area required for the projected GC population of 4,54,553 by 2041 is estimated to be 4006 Ha..
The total population of ITP in the Growth Centre is 1,59,790, while the projected population for the rest of the Growth Centre is 2,94,763. Accordingly, the total gross area required for the total projected GC population of 4,54,553 is estimated to be 4006 Ha.
Considering the projected population, net residential density, proposed role and existing growth trends within the Growth Centre 3415.09 Ha. of gross residential zone is proposed.
As per the Work Live hub concept, consolidated residential zoning is proposed in the Growth Centre. Bottom up approach is adopted to allocate residential zone. Existing gaothans such as Bhukum, Pirangut, Kasar Amboli, Uravade, Lavale, and Nande are considered as social nucleus and residential real estate hot spots. To drive their
Chapter 25: Growth Centre: Pirangut
future growth, a residential zone is allocated at these villages. As mentioned earlier, development potential is almost saturated in fringe villages of PMC such as Bhugaon, Bavdhan, and Sus where only infill residential development is envisaged through zoning.
Out of the total proposed industrial zone of 186.6 sq.km, 9.3 sq.km of industrial development is envisaged at Pirangut growth centre, based on 50 workers/Ha.
Pirangut Growth Centres would enhance the future growth of the Study Area’s industrial sector with a new employment generation estimated to be 97,652. Considering the existing industrial development scenario, strategic infrastructure proposals within the Growth Centre and the planning intent of RP 1997, industrial zone over an area of 829.31 ha. is proposed.. It is arrived at by considering worker density of 50 workers/ha and increasing it by 30% to account for roads (15%), open spaces (10%) and amenity (5%).
The industrial zone as per ELU was 240 Ha while 495 Ha were proposed in RP 1997. Thus considering the existing scenario of industrial development, the strategic infrastructure proposals and planning intent of Regional Plan, 829.31 ha of industrial zone is proposed. The planning intent is to consolidate industrial zone around existing industrial development and industrial zone proposed in RP 1997 at Ambarwet, Kasar Amboli, and Pirangut.