8.1 Documentation
It is recommended that a set of, drawings, design sheets, testing certificates manufacturer’s catalogue, instructions for operation and maintenance schedules, trouble-shooting charts, warranties/guarantees, applicable permissions, NOCs from Electrical Inspector, Pollution Control Boards, Structural Stability certificate from structural engineer in respect of roof top installation, test report of electrical contractor shall be handed to owner and owner shall take note and preserve such documents as record.
8.2 Post Commissioning Care and Maintenance
397
Considering aspect of important aid in Life Safety, critical services, it is very important to follow the schedule of post commissioning checks depending on run time hours or period in months. Entering data in log sheets showing hours of use, cooling water temperature, lub-oil pressure and temperature level, alternator load parameters, carrying out scheduled maintenance, attending corrective measures will provide improved reliability, high uptime and service life longevity of DG set.
Section 2 Electrical Installations in Captive Sub-stations
This section of National Electrical Code of India (Part 2/Sec 2) is primarily intended to cover the requirements relating to captive distribution substations. Captive sub-station belongs to an individual consumer as a part of electrical installation and does not form a part of public electricity distribution system. The individual consumer who is owner of such installation is responsible for safety related aspects of complete installation, use, operation, maintenance, etc.
1 SCOPE
1.1 Scope of this section of the code (Part 2/Sec 2) includes design, installation, operation, maintenance and safety; related to the portion of installation from the point of supply at 33/22/11 kV to main controlling device after secondary side of transformer and includes apparatus, equipment, devices installed/provided with interconnecting cables, within the premises of substation.
1.2 The guidelines given under this section are applicable to distribution transformer(s) with individual capacity not exceeding 2.5 MVA and sub-station capacity up to 10 MVA and voltage level up to 33 kV.
1.3 Scope does not include the switching-stations and sub-stations in generating plants, electrical distribution system for public, owned by electric supply distribution company/licensee/authority.
2.1 Statutory Provisions
a) Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2010 (as amended to date);
b) Central Electricity Authority (Technical Standards for construction of Electric Plants and Electric Lines) Regulations, 2010 (as amended to date); and
c) Central Electricity Authority (Safety Requirements for Construction Operation and Maintenance of Electric Plants and Lines) Regulations, 2011 (as amended to date)
2.2 Standards
IS/IEC/ISO No.
1180 (Part 1) : 2014 Outdoor type oil immersed distribution transformers up to and including 2 500 kVA, 33 kV — Specification: Part 1 Mineral oil immersed
1180 (Part 3) : 2021 Outdoor/indoor type liquid immersed distribution transformers up to and including 2 500 kVA, 33 kV — Specification: Part 3 Natural/synthetic ester liquid immersed
1641 : 2013 Fire safety of buildings (general): General principles of fire grading and classification — Code of practice (second revision)
1642 : 2013 Fire safety of buildings (general): Details of construction — Code of practice (second revision)
1646 : 2015 Fire safety of buildings (general): Electrical installations — Code of practice (third revision)
1946 : 1961 Code of practice for use of fixing devices in walls, ceilings and floors of solid construction
IS/IEC/ISO No. Title
3034 : 1993 Fire safety of industrial buildings: Electrical generating and distributing stations Code of practice
3043 : 2018 Code of practice for earthing (second revision)
10028 (Part 2) : 1981 Code of practice for selection, installation and maintenance of transformers: Part 2 Installation
10028 (Part 3) : 1981 Code of practice for selection, installation and maintenance of transformers: Part 3 Maintenance
IS/IEC 62305 series Protection against lightning
IS/IEC 61936-1 : 2021 Power Installations exceeding 1 kV AC and 1.5 kV DC — Part 1 AC Installations
3 TERMINOLOGY
For the purpose of this Part, the definitions given in (Part 1/Sec 2) of this Code shall apply.