1. Eligibility:
i) The permission for the construction of towers for cellular/mobile/Basic Telephone services shall be granted on parks, barren lands, undeveloped sites or open sites, green verges or arable/cultivable land whereas in school & hospital buildings/premises , shall be prohibited and for other land uses such permission shall be granted by concerned competent authority/Development Authority Board.
ii) Permission for construction of towers on buildings shall be granted only if maps/drawings of such buildings have been approved by concerned authority /officer and a certificate by empanelled structural engineer is
mandatory certifying that the proposed tower as well as the building on which the tower is to be constructed is safe.
iii) Construction of towers shall not be permitted in narrow streets so as to minimise the possible losses in case of natural disasters. The minimum width of approach road in plain area must be 9 mt. keeping in view with the odd geographical condition of mountainous region e.g.-: Mountain Peaks, Cliff Tops etc, relaxation regarding the width of approach road & minimum plot area can be considered by the competent authority. However, in dense built up areas if sufficient road width is not available, the permission for the uses of only micro cell based stations for mobile services on a minimum of 5 mt. wide approach road under special circumstances can be considered subject to the fire brigade department issues an NOC that the available road width is sufficient for convenient movement of fire brigade vehicle to the concerned site.
iv) Area of Plot: The minimum plot for installation of such services will be 50 sq.mt. In case the construction is proposed on the rooftop of the building, the roof must have a minimum area of 50 sq.mt.
v) Land Covering & FAR: For the Construction of exchanged node sites or for ancillary buildings, the maximum ground coverage of the building should be 40% & the FAR shall be 1.0
vi) Only Antenna Towers will be exempted of FAR & height calculation.
vii) Set Back: The set back of the tower should be as per Appendix (A). The minimum distance of tower from overhead high, medium & low tension electric wires shall be as per NBC guidelines.
2. Norms regarding permission for installation
Permission shall be granted for installing towers for cellular/mobile/basic telephone services on following conditions provided standards pertaining to general construction norms aren’t violated:
i) Permission for installation to cellular/mobile/basic telephone service operators having license approved by Department of Telecommunication, Govt. Of India shall be available only for the construction of Antenna Towers, Radio, Equipment cell and Generator cell required for this service. Generators will only be of silent nature and be installed at suitable place after taking into account the safety concerns.
ii) Before installing the towers, the drawing of the proposed construction in the prescribed format will be prepared by an architect registered with Council of Architecture and an authorised structural engineer certifying that the proposed tower is all safe. In cases, there where the tower is to be installed on the rooftop of the building, the building along with the tower should structurally safe. Certification regarding strength of building based upon structural safety norms shall be required from authorised structural engineers or by IITs or Government Engineering institutions.
iii) If the tower is to be installed at the rooftop of the building, the base of the tower must be at least 3 mt. above roof. Besides, the safety of tower and building structure must be assured against Wind Load and Seismic Load.
iv) No Objection Certificate by Airport Authority of India must be produced before the installation of towers, wherever required.
v) No prior approval from the Pollution Control Board is required if the capacity of Diesel Generator used for the functioning of tower is less than 25 KVA, the generator is certified by Automotive Research Association of India and it is of silent nature.
vi) Before installation of towers, NOC from SACFA (Standing Advisory Committee on Frequency Allocation) is mandatory.
vii) The service providing company must produce an affidavit that in case of damage to the nearby livestock and property during the installation of towers, the company will solely be responsible for the compensation.
Viii) Following Acknowledge report issued by TERM Cell of Department of Telecommunication must be produced along with the application:
Acknowledge Receipt issued by TERM cell (DoT) of the self certificate submitted by Telecom Service Provider in respect of mobile Tower/BTS (ground based/rooftop/pole/wall mounted) in the format as prescribed by TEC, DoT, establishing/certifying that all the general public areas around the tower will be within safe EMR exposure limit. The operator shall get the Technical Audit done by TERM Cell annually and shall submit the same with the sanctioning authority at the time of renewal of the permission for mobile tower.
ix) Requisite Drawing/Plans, Affidavit and other relevant certificates along with license fee should be submitted in the office of the concerned competent authority before installation work. The amount received as license fee will be deposited in the “Infrastructure Development Fund” of the authority. For areas outside of the authority area, the same fee would be credited to prescribed fund of the govt. The license would be valid for 5 yrs. and an application for renewal must be submitted in the office of competent authority at least 1 month prior to the completion of the validity. The renewable fee will be 25% of the license fee or Rs. 2500 whichever is more.
(i) The Depts./Company/Service Provider providing technologically higher quality mobile tower Antenna as compared to their counterparts shall be given priority towards construction of towers on the Govt./Autonomous/Corporate office buildings and on the available land in its premises. In such cases if the tower is found to be as per the above mentioned guidelines, a No Objection Certificate shall be granted by the concerned Head of The Office for the approval of drawing after the payment of prescribed fee to DM of the respective districts and discount of 10% shall be provided as an incentive in such cases.
(ii) Mobile Tower Company shall solely be responsible for the safety of Mobile Towers and will be responsible in case of mishaps.
3. Other Norms:
(i) No development charges other than the charges mentioned in the above point no. 2 (ix) will be levied for granting License for installation.
(ii) The affidavit will be attested by notary on a Rs. 10 non judicial stamp paper having applicant’s photograph.
(iii) After completing all formalities, a copy of application form shall be sent to the offices of District Magistrate and Senior Superintendent of Police each for information.
(iv) For checking harmful effects in the form of electromagnetic waves, vibration, sound pollution etc., the guidelines issued from time to time by GoI/State Govt. and other Govt. Agencies must be complied with.
(v) To curb unauthorised entry in Ground Based Towers, properly secured with provisions of arrangements viz. - boundary wall, barbed wire fence of at least 10 feet high, along must be provided for.
(vi) To check unauthorised entry in Roof Top Towers, the doors leading to the rooftop of the building must be secured.
(vii) The entry of the Tower Premises should have a signboard having warning signs where DANGER! R F Radiation, No Entry, is visible and such instructions should be in appropriate places.
(viii) The service provider company shall produce the original copy of the Registration Contract made with the owner of the land/plot along with necessary stamp fee.
(ix) The guidelines issued by TRAI (Telecom Regulatory Authority of India) and ARAI (Automobile Research Association of India) from time to time must be complied with.
(x) Audit should be done completing other norms as per Appendix (A) by TERM cell of DoT.
Compounding and Regularisation:-
(i) All such towers that have been installed before the promulgation of the policy guidelines and are otherwise suitable for Regularisation and application for permission had not been applied or license fee was not paid as per the policy applicable on the mentioned date, regularisation shall be done considering such cases as special case for which fee shall be paid as per item 2 (ix) as a single/one time payment.
(ii) In all towers installed/erected earlier where license fee was paid by Telecom Companies as per the approved policy but the concerned sanctioning authority/have certain reservations regarding the validity of site plan, Approved drawing of building, (in cases of rooftop towers on buildings), absence of copy of agreement with land owner and other related documents/maps with concerned application. In such matters, the concerned company shall apply to Authority for Compounding and Regularisation. Sanctioning the compounding and regularisation of such cases shall be done by the Sanctioning Authority within a maximum of 30 days from the date of application.
(iii) Buildings, having rooftop towers on it, and if the drawing of these buildings has been approved by Development Authority/Special Area Development Authority/Regulated Area or it is submitted in the Development Authority for approval, the mandatory provisions for completion certificate regarding erection of cellular mobile towers can be relaxed.
(iv) In cases where the towers have been erected on building but the drawings of such building are not approved, such building drawings shall be submitted in the concerned Authority for compounding. The scrutiny of such cases have to be done by the Sanctioning Authority within a period of 30 days from the date of such application submitted to the authority failing which the case will be deemed as approved for compounding and the prescribed fee shall be deposited as per the calculation of the concerned sanctioning authority.
(v) In cases where the matter doesn’t qualify for compounding and regularisation, necessary legal action shall be taken by the sanctioning authority.
(vi) In area falling outside Development Authority/Special Area Development Authority/ Regulated Areas, the scrutiny, approval and regularisation will be done as per the procedure laid down for Habitat Projects.
In case of complaint regarding mobile towers having radiation and related issues, the same shall be referred to a special agency appointed by GoI, “TERM cell” BSNL office presently located at 197, Rajpur Road, Dehradun, and scrutiny to be done as per the guidelines issued by the Ministry of Telecommunication, GoI from time to time. In case of a law and order problem, necessary directions and suggestions shall be taken from the concerned District Magistrates.
In the light of above guidelines mobile towers shall not be sealed by any Regional Authority on account of Radiation, until and unless such objections are not raised by “TERM cell” office of BSNL.