(1) When the State Governments notifies the bye-laws and rules concurred by the Ministry of Environment, Forest and Climate Change, the Central Government may issue an order stating that no separate environmental clearance is required for buildings to be constructed in the States or local authority areas;
(2) The Authority shall certify the compliance of the environmental conditions prior to issuance of Completion Certificate, as prescribed in the Byelaws, as per the requirements stipulated for such buildings based on the recommendation of the Environmental Cell constituted in the local authority;
(3) For the purpose of certification regarding incorporation of environmental conditions in buildings, the Ministry of Environment, Forest and Climate Change may empanel through competent agencies, the Qualified Building Environment Auditors (QBEAs) to assess and certify the building projects, as per the requirements of this notification and the procedure for accreditation of Qualified Building Auditors and their role as given at Appendix-XV;
(4) In order to implement the integration of environmental condition in building bye-laws, the Authority shall constitute the Environment Cell (herein after called as Cell), for compliance and monitoring and to ensure environmental planning within their jurisdiction;
(5) The Cell shall monitor the implementation of the bye-laws and rules framed for Integration of environmental conditions for construction of building and the Cell may utilise the services of the Empanelled professionals as prescribed in Appendix-IA;
(6) The Cell shall function under the administrative control of the Authority;
(7) The composition and functions of the Cell are given at Appendix-XVI;
(8) The environmental concerns are integrated in the building bye-laws, as per their size of the project, and the Authority shall follow the procedure, as given below:
(9) No Environmental Clearance from Ministry of Environment, Forest and Climate Change and no Consent to Establish and Operate under the Water (Prevention and Control of Pollution) Act, 1974 and the Air (Prevention and Control of Pollution) Act, 1981 will be required from the State Pollution Control Boards for buildings up to 1,50,000 square metres.
15.1 Environmental conditions for compliance during Building approvals.- The Ministry of Environment, Forest and Climate Change has now decided to integrate the environmental concerns into building plan approval process and empowering the concerned local body to approve and certify compliance of stipulated requirements. The new building construction proposals, for the purpose of this chapter are classified in the following 3 categories: -
(1) Building Category ‘1’: Built-up Area 5,000Sq.m to < 20,000Sq.m;
(2) Building Category ‘2’: Built-up Area ≥ 20,000Sq.m to 50,000Sq.m; and
(3) Building Category ‘3’: Built-up Area ≥ 50,000Sq.m to 1,50,000Sq.m
Note: area mentioned against each building category is the total constructed area of the building including car parking area
15.1.1 BUILDINGS CATEGORY ‘1’ (5,000 to < 20,000 Square metres).- A Self Declaration Form to comply with the environmental conditions as stipulated in Table 15.1along with Form-IIb and certification by the Building Environment Auditor to be submitted by the project proponent as a common application for building licence to the local authority along with the specified fee in separate accounts. Thereafter, the authority may issue the building License incorporating the environmental conditions in it and allow the project to start based on the self-declaration and certification along with the application. After completion of the construction of the building, the project proponent may update Form-IIb based on audit done by the qualified Building Environment Auditor (BEA) and shall furnish the revised compliance undertaking to the local authority. Any noncompliance issues in buildings less than 20,000 square metres shall be dealt as prescribed in the rules framed under Section 76F and 76 FFF of Karnataka Town and Country Planning Act,1961.
15.1.2 BUILDINGS CATEGORY ‘2’ (>20,000 to <1,50,000 Square metres).- A Self Declaration Form to comply with the environmental conditions as stipulated in Table 15.2 along with Form-IIb and Compliance Report submitted by Environment Engineer on Record (EER) to be submitted by the project proponent as a common application for building licence to the Authority along with the specified fee in separate accounts. The fee for environmental appraisal will be deposited in a separate account. The Environment Cell shall process the Application after obtaining Evaluation Report of the Building Environment Auditor (of the compliance report submitted by the EER) and if the Application and drawings / details submitted are in order, forward the same to the CEO
If the Environment cell is of the opinion that the application/drawings submitted by the proponent is not in accordance with the provisions of these Byelaws (based on the evaluation report submitted by the Building Environment Auditor (BEA), the Environment Cell shall suggest the necessary changes to be made and forward the same to the CEO of the Authority. The CEO shall issue endorsement to the proponent as per the suggestions made by the Environment Cell and the proponent shall make the necessary changes and resubmit the application / drawings to the satisfactions of the Environment Cell and the Environment Cell shall accept the revisions made by the proponent.
According to the Proponent or the concerned EER, if the defects / changes suggested in the endorsement are incorrect, the proponent may file objection, to the CEO, stating the correctness of the drawings / details submitted.
If any such objection is received from the Proponent, the CEO of the Authority shall conduct joint enquiry along with the Applicant, the concerned EER, the Building Environment Auditor who has submitted the Evaluation Report and the Environment Cell which has suggested the changes in the drawings / details submitted (based on which the endorsement was issued), by giving notice to all, within seven days of receiving objection.
During the enquiry, the CEO of the Authority, after hearing the views of both the parties, shall either accept or reject the objection raised by the proponent and instruct the proponent accordingly in writing and sending a copy of the same to the Environment Cell and the decision of the CEO shall be final. The Proponent shall abide by the decision of the CEO and make necessary changes as instructed by the CEO, if any and resubmit the application.
After receiving the recommendation of the Environment Cell or after receiving the changes made as instructed by the CEO (as mentioned above), the building Licence and environmental clearance shall be issued in an integrated format by the Authority.
After executing all works in site as per the environmental clearance issued by the authority and certification of works by the empanelled professional, the completion certificate shall be issued as prescribed in clause 3.17.
The project proponent shall submit Performance Data and Certificate of Continued Compliance of the project for the environmental conditions parameters applicable after completion of construction, from Building Environment Auditors every year to the Environment Cell with special focus on the following parameters (as detailed in clause 11.2): -
(a) Energy Use (including all energy sources);
(b) Energy generated on site from onsite Renewable energy sources;
(c) Water use and waste water generated, treated and reused on site;
(d) Waste Segregated and Treated on site; and
(e) Tree plantation and maintenance.
After completion of the project, the Cell shall randomly check the projects compliance status including the yearly audit report. Penalties and action against the concerned persons for non-compliances of the environmental conditions and parameters shall be initiated as prescribed in the rules framed under Section 76F and 76 FFF of Karnataka Town and Country Planning Act,1961.
15.1.3 BUILDINGS CATEGORY ‘3’ (≥ 50,000 to < 1,50,000 Square metres).- All the process mentioned in Clause 15.1.2 shall be followed except that after completion of the project, the Cell shall check all the projects for compliance on a yearly basis including the yearly audit report submitted by the Building Environment Auditors.
Table 15.1: Environmental Conditions for Building and Construction
(Building Category ‘1’: 5,000Sqm to < 20,000Sqm)
| Sl. No. | Medium | Environmental conditions |
|---|---|---|
| 1 | Topography Natural Drainage | The natural drain system should be maintained for ensuring unrestricted flow of water. No construction shall be allowed to obstruct the natural drainage through the site. No construction is allowed on wetland and water bodies. Check dams, bio swales, landscape, and other sustainable urban drainage systems (SUDS) are allowed for maintaining the drainage pattern and to harvest rain water. Buildings shall be designed to follow the natural topography as much as possible. Minimum cutting and filling should be done. |
| 2 | Water conservations-Rain Water Harvesting and Ground Water Recharge | A complete plan for rain water harvesting, water efficiency and conservation should be prepared. The provisions on rain water harvesting and Ground water recharging prescribed in Chapter 10 and as notified by the Government should be followed. A rain water harvesting plan needs to be designed where the recharge bores of minimum one recharge bore per 5,000 Sq.m of built up area and storage capacity of minimum one day of total fresh water requirement shall be provided. In areas where ground water recharge is not feasible, the rain water should be harvested and stored for reuse. The ground water shall not be withdrawn without approval from the Competent Authority. All recharge should be limited to shallow aquifer. |
| 2(a) | At least 30% of the open spaces (setback area)) shall be pervious. Use of Grass pavers, paver blocks with at least 50% opening, landscape etc. would be considered as pervious surface. | |
| 2(b) | Water efficient appliances shall be used. Low flow fixtures or sensors be used to promote water conservation. Details as notified by the Government shall be followed. | |
| 2(c) | Separation of grey and black water should be done by the use of dual plumbing system. In case of single stack system separate recirculation lines for flushing by giving dual plumbing system be done. Details as notified by the Government shall be followed. | |
| 3 | Solid Waste Management | Solid waste: Separate wet and dry bins must be provided in each unit and at the ground level for facilitating segregation of waste. The provisions of the Solid Waste (Management) Rules 2016 and the e-waste (Management) Rules 2016, and the Plastics Waste (Management) Rules 2016 shall be followed. Details as notified by the Government shall be followed. |
| 3(a) | All non-biodegradable waste shall be handed over to authorized recyclers for which a written tie up must be done with the authorized recyclers. | |
| 3(b) | Treatment of wet waste and sanitary waste on site (organic dry waste also is preferred) using Organic waste composter / Vermiculture pit or any other approved technology shall be installed with a minimum capacity of 0.3 kg /person/day must be installed. |
| Sl. No. | Medium | Environmental conditions |
|---|---|---|
| 1 | Topography Natural Drainage | The natural drain system should be maintained for ensuring unrestricted flow of water. No construction shall be allowed to obstruct the natural drainage through the site. No construction is allowed on wetland and water bodies. Check dams, bio swales, landscape, and other sustainable urban drainage systems (SUDS) are allowed for maintaining the drainage pattern and to harvest rain water. Buildings shall be designed to follow the natural topography as much as possible. Minimum cutting and filling should be done. |
| 2 | Water conservations-Rain Water Harvesting and Ground Water Recharge | A complete plan for rain water harvesting, water efficiency and conservation should be prepared. The provisions on rain water harvesting and Ground water recharging prescribed in Chapter 10 and as notified by the Government should be followed. A rain water harvesting plan needs to be designed where the recharge bores of minimum one recharge bore per 5,000Sq.m of built up area and storage capacity of minimum one day of total fresh water requirement shall be provided. In areas where ground water recharge is not feasible, the rain water should be harvested and stored for reuse. The ground water shall not be withdrawn without approval from the Competent Authority. All recharge should be limited to shallow aquifer. |
| 2(a) | At least 30% of the open spaces (setback area shall be pervious. Use of Grass pavers, paver blocks with at least 50% opening, landscape etc. would be considered as pervious surface. | |
| 2(b) | Water efficient appliances shall be used. Low flow fixtures or sensors be used to promote water conservation. Details as notified by the Government shall be followed. | |
| 2(c) | Separation of grey and black water should be done by the use of dual plumbing system. In case of single stack system separate recirculation lines for flushing by giving dual plumbing system be done. Details as notified by the Government shall be followed. | |
| 3 | Solid Waste Management | Solid waste: Separate wet and dry bins must be provided in each unit and at the ground level for facilitating segregation of waste. The provisions of the Solid Waste (Management) Rules 2016 and the e-waste (Management) Rules 2016, and the Plastics Waste (Management) Rules 2016 shall be followed. Details as notified by the Government shall be followed. |
| 3(a) | All non-biodegradable waste shall be handed over to authorized recyclers for which a written tie up must be done with the authorized recyclers. |
| Sl. No. | Medium | Environmental conditions |
|---|---|---|
| 1 | Topography Natural Drainage | The natural drain system should be maintained for ensuring unrestricted flow of water. No construction shall be allowed to obstruct the natural drainage through the site. No construction is allowed on wetland and water bodies. Check dams, bio swales, landscape, and other sustainable urban drainage systems (SUDS) are allowed for maintaining the drainage pattern and to harvest rain water. Buildings shall be designed to follow the natural topography as much as possible. Minimum cutting and filling should be done. |
| 2 | Water conservations-Rain Water Harvesting and Ground Water Recharge | A complete plan for rain water harvesting, water efficiency and conservation should be prepared. The provisions on rain water harvesting and Ground water recharging prescribed in Chapter 10 and as notified by the Government should be followed. A rain water harvesting plan needs to be designed where the recharge bores of minimum one recharge bore per 5,000 Sq.m of built up area and storage capacity of minimum one day of total fresh water requirement shall be provided. In areas where ground water recharge is not feasible, the rain water should be harvested and stored for reuse. The ground water shall not be withdrawn without approval from the Competent Authority. All recharge should be limited to shallow aquifer. |
| 2(a) | At least 30% of the open spaces (setback area shall be pervious. Use of Grass pavers, paver blocks with at least 50% opening, landscape etc. would be considered as pervious surface. | |
| 2(b) | Water efficient appliances shall be used. Low flow fixtures or sensors be used to promote water conservation. Details as notified by the Government shall be followed. | |
| 2(c) | Separation of grey and black water should be done by the use of dual plumbing system. In case of single stack system separate recirculation lines for flushing by giving dual plumbing system be done. | |
| 3 | Solid Waste Management | Solid waste: Separate wet and dry bins must be provided in each unit and at the ground level for facilitating segregation of waste. The provisions of the Solid Waste (Management) Rules 2016 and the e-waste (Management) Rules 2016, and the Plastics Waste (Management) Rules 2016 shall be followed. Details as notified by the Government shall be followed. |
| 3(a) | All non-biodegradable waste shall be handed over to authorized recyclers for which a written tie up must be done with the authorized recyclers. |
By Order and in the name of the Governor of Karnataka
NAGARAJ Under Secretary to Government Urban Development Department
Annexure-A
Occupancy Categorization of Buildings for Water and Other Requirement for Fire fighting
| Zone-I | Zone-II | Zone-III |
|---|---|---|
| GROUP 'A': RESIDENTIAL | GROUP 'E': BUSINESS | GROUP 'G': INDUSTRIAL |
| A-1 Lodging and Rooming HouseA-2 One or two family privateA-3 DormitoriesA-4 Apartment HousesA-5 HotelsA-6 Starred hotels | E-2 Laboratories, outpatient clinics, research establishments, libraries and test housesE-3 Electronic data processing centres, computer installations, information technology parks and call centresE-4 Telephone exchangesE-5 Broadcasting stations, T.V. stations and air traffic control towers | G-3 Buildings used for High hazard industries |
| GROUP 'B': EDUCATIONAL | GROUP 'G' INDUSTRIAL | GROUP 'H' STORAGE BUILDINGS |
| B-1 Schools up to senior secondary levelB-2 All others/ training institutions | G-1 Buildings used for Low hazard industriesG-2 Buildings used for Moderate hazard industries | This shall include any building or part of a building used primarily for the storage or sheltering of goods, ware or merchandise, vehicles or animals etc. |
| GROUP'C' INSTITUTIONAL | GROUP 'J' HAZARDOUS BUILDINGS | |
| C-1 Hospitals and SanatoriaC-2 Custodial InstitutionsC-3 Penal and mental Institutions | These shall include any building or part thereof which is used for the storage, handling, manufacture or processing of highly combustible or explosive materials or products which are liable to burn with extreme rapidity and/or which may produce poisonous fumes or explosions | |
| GROUP 'D' ASSEMBLY | ||
| D-1 Buildings having a theatrical or motion picture or any other stage and fixed seats for over 1000 personsD-2 Buildings having a theatrical or motion picture or any other stage and fixed seats up to 1000 personsD-3 Buildings without a permanent stage having accommodation for 300 or more persons but no permanent seating arrangementD-4 Buildings without a permanent stage having accommodation for less than 300persons with no permanent seating arrangement |
Annexure-BI
| Zone-I | Zone-II | Zone-III |
|---|---|---|
| D-5 All other structures including temporary structures designed for assembly of people not covered by D-1 to D-4, at ground level D-6 Buildings having mixed occupancies of assembly and mercantile (for example, shopping malls providing facilities such as shopping, cinema theatres, multiplexes and restaurants/ food courts) D-7 Underground and elevated mass rapid transit system | ||
| GROUP 'E' BUSINESS | ||
| E-1 Offices, Banks, professional establishments, like offices of architects, engineers, doctors, lawyers, post offices and police stations | ||
| GROUP 'F' MERCANTILE | ||
| F-1 Shops, Stores, departmental stores, markets (any with covered area upto 500m<sup>2</sup>) F-2 Shops, Stores, departmental stores, markets (any with covered area more than 500m<sup>2</sup>) F-3Underground shopping centres |
Fire Protection Requirements for Buildings in Zone-I Category
| Sl. No | Measures | Group-A: Residential A-3, A-4, A-5, A-6 (see Note 3) | Group-A: Residential A-3, A-4, A-5, A-6 (see Note 3) | Group-A: Residential A-3, A-4, A-5, A-6 (see Note 3) | Group-A: Residential A-3, A-4, A-5, A-6 (see Note 3) | Group-A: Residential A-3, A-4, A-5, A-6 (see Note 3) | Group-A: Residential A-3, A-4, A-5, A-6 (see Note 3) | Group-B: Educational B-1, B-2 (see Note 3 and23) | Group-B: Educational B-1, B-2 (see Note 3 and23) | Group-C: Institutional al C-1, C-2, C-3 (see Note 3 and23) | Group-C: Institutional al C-1, C-2, C-3 (see Note 3 and23) | Group-C: Institutional al C-1, C-2, C-3 (see Note 3 and23) |
| Sl. No | Measures | I | II | III | IV | V | VI | VII | VIII | VII | VIII | IX |
| 1 | Access | P | P | P | P | P | P | P | P | P | P | P |
| 2 | Means of Escape | P | P | P | P | P | P | P | P | P | P | P |
| 3 | Compartmentation | P | P | P | P | P | P | P | P | P | P | P |
| 4 | Refuge Area | X | X | X | P | P | P | X | P | X | P | P |
| 5 | Emergency Lights | P | P | P | P | P | P | P | P | P | P | P |
| 6 | Exit Signs | P | P | P | P | P | P | P | P | P | P | P |
| 7 | Manually Operated Electronic Fire Alarm System (MOEFA) with Talk Back and PA system (see Note 1) | p | p | p | p | P | P | P | P | P | P | P |
| Sl. No | Measures | Group-A: Residential A-3, A-4, A-5, A-6 (see Note 3) | Group-A: Residential A-3, A-4, A-5, A-6 (see Note 3) | Group-A: Residential A-3, A-4, A-5, A-6 (see Note 3) |
Fire Protection Requirements for Buildings in Zone-I Category
| Sl. No | Measures | Group-D: Assembly D-1 to D-6 (see Note 22 and 23) | Group-D: Assembly D-1 to D-6 (see Note 22 and 23) | Group-D: Assembly D-1 to D-6 (see Note 22 and 23) | Group-D: Assembly D-1 to D-6 (see Note 22 and 23) | Group-E: Business E-1 (see Note 22) | Group-E: Business E-1 (see Note 22) | Group-E: Business E-1 (see Note 22) | Group-E: Business E-1 (see Note 22) | Group-F: Mercantile F-1, F-2 and F-3 (see Note 3 and 23) | Group-F: Mercantile F-1, F-2 and F-3 (see Note 3 and 23) | Group-F: Mercantile F-1, F-2 and F-3 (see Note 3 and 23) |
| Sl. No | Measures | X | VII | VIII | XI | X | VII | VIII | VI | VII | VIII | XII |
| 1 | Access | P | P | P | P | P | P | P | P | P | P | P |
| 2 | Means of Escape | P | P | P | P | P | P | P | P | P | P | P |
| 3 | Compartmentation | P | P | P | P | P | P | P | P | P | P | P |
| 4 | Refuge Area | X | X | P | P | X | X | P | P | X | P | P |
| 5 | Emergency Lights | P | P | P | P | P | P | P | P | P | P | P |
| 6 | Exit Signs | P | P | P | P | P | P | P | P | P | P | P |
| 7 | Manually Operated Electronic Fire Alarm System (MOEFA) with Talk Back and PA system (see Note 1) | P1 | P | P | P | P | P | P | P | P | P | P |
| 8 | Fire Extinguishers | P | P | P | P | P | P | P | P | P | P | P |
| 9 | First Aid Hose Reel | P |