Note: Maximum Permissible FAR (MFAR) is calculated as per the provisions of purchasable FAR in Chapter-9
3.2.2.6 Community Facilities – Public Amenities
Sl.
Use Types
Ground Coverage (%)
Road Width (m)
Base FAR
Max. FAR
1(a)
Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Built up)
Max. coverage after ensuring setbacks
=>18 - 24m
2.0
4.0
Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Built up)
Max. coverage after ensuring setbacks
>24 - 45m
2.0
7.0
Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Built up)
Max. coverage after ensuring setbacks
More than 45m
2.0
Unrestricted
1(b)
Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Non-Built up)
Max. coverage after ensuring setbacks
=>18 - 24m
3.0
6.0
1(b)
Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Non-Built up)
Max. coverage after ensuring setbacks
=>24 - 45m
3.0
10.5
1(b)
Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Non-Built up)
Max. coverage after ensuring setbacks
More than 45m
3.0
Unrestricted
2 (a)
Auditorium / Convention Centre (Built-up)
Max. coverage after ensuring setbacks
=>18 - 24m
2.0
4.0
2 (a)
Auditorium / Convention Centre (Built-up)
Max. coverage after ensuring setbacks
>24 - 45m
2.0
7.0
2 (a)
Auditorium / Convention Centre (Built-up)
Max. coverage after ensuring setbacks
More than 45m
2.0
Unrestricted
2 (b)
=>24 - 45m
3.0
10.5
Sl.
Use Types
Ground Coverage (%)
Road Width (m)
Base FAR
Max. FAR
Auditorium / Convention Centre (Non-built-up area)
Max. coverage after ensuring setbacks
More than 45m
3.0
Unrestricted
3
Guest House
Max. coverage after ensuring setbacks
=>12 - 24m
1.5
3.0
3
Guest House
Max. coverage after ensuring setbacks
>24 - 45m
1.5
5.25
3.2.2.7 Other Uses
Note: Maximum Permissible FAR (MFAR) is calculated as per the provisions of purchasable FAR in Chapter-9
Sl.
Use Types
Ground Coverage (%)
Road width (m)
Base FAR
Max. FAR
Agriculture
1
Farmhouse
20% for non-farm activities
=>7
0.2
0.2
2
Dairy Farms
20%
=>7
0.2
0.2
Industrial
1
Industrial Buildings
Max. coverage after ensuring setbacks
Up to 12m
1.5
1.5
1
Industrial Buildings
Max. coverage after ensuring setbacks
>12 - 24 m
2.5
5.0
1
Industrial Buildings
Max. coverage after ensuring setbacks
>24 - 45 m
2.5
8.75
1
Industrial Buildings
Max. coverage after ensuring setbacks
> 45 m
2.5
Unrestricted
2
Flatted factories/ MSME
Max. coverage after ensuring setbacks
Up to 12m
3.0
3.0
2
Flatted factories/ MSME
Max. coverage after ensuring setbacks
>12 - 24 m
3.0
6.0
2
Flatted factories/ MSME
Max. coverage after ensuring setbacks
>24 - 45 m
3.0
9.0
2
Flatted factories/ MSME
Max. coverage after ensuring setbacks
> 45 m
3.0
Unrestricted
3
Data Centers
Max. coverage after ensuring setbacks
Up to 12m
3.0
3.0
3
Data Centers
Max. coverage after ensuring setbacks
>12 - 24 m
3.0
6.0
3
Data Centers
Max. coverage after ensuring setbacks
>24 - 45 m
3.0
9.0
3
Data Centers
Max. coverage after ensuring setbacks
> 45 m
3.0
Unrestricted
Mixed Use
As per 8.1
As per 8.1
As per 8.1
As per 8.1
Recreational
1
Stadium/ Sports Complex
20%
3.2.2.8 Exemptions from FAR calculations
Sl.
Q: Is the structure included in FAR calculation? Key: Y= Yes, included in calculation N = No, not included in calculation NA = Not permitted thus not applicable
t i n u-ilMtu/legn<sup>i</sup>S-<sup>l</sup>i<sup>a</sup> <sup>t</sup>n diees R
g n <sup>i</sup>H<sup>sou</sup> poru G-<sup>l</sup>i<sup>a</sup> <sup>t</sup>n diees R
U<sup>es</sup> diex M/l<sub>i</sub><sup>a</sup>c e<sup>r</sup> mmo C
s <sup>g</sup>n <sup>i</sup>d <sup>l</sup><sub>i</sub>u B iffec O
l <sup>a</sup>n i<sup>o</sup> <sub>i</sub><sup>t</sup><sub>tt</sub>s<sup>u</sup> I<sup>n</sup>
l i<sup>a</sup> dtrsu I<sup>n</sup>
hter O
1
Mezzanine
Y
Y
Y
Y
Y
Y
Y
2
Pergola (if closed from three or more sides)
Y
Y
Y
Y
Y
Y
Y
3a
Lift Machine Room
N
N
N
N
N
N
N
3b
Lift Shafts (to be counted as covered area only once i.e. on ground floor)
Y
Y
Y
Y
Y
Y
Y
3c
Lift Lobby up to 10 square meters
N
N
N
N
N
N
N
4
Meter Room (as per electricity authority norms)
N
N
N
N
N
N
N
5
Cantilever projection at any level (in setbacks) 0.75m width (no construction of any type or any material shall be permitted over projections)
N
N
N
N
N
N
N
6
Porch/ Portico (Maximum 4-meter x 8 meter). It shall not interfere with Fire tender movement.
Y
Y
Y
Y
Y
Y
Y
7
Basement(s) within the setback line, if used for:
7a
Parking lot and garages
N
N
N
N
N
N
N
7b
Air conditioning equipment and other machines
N
N
N
N
N
N
N
7c
DG set room, meter room and electric panel room, Effluent Treatment Plant, suction tank, pump room
Chapter 3Standards for Land Development and Building Construction
3.1 General Land Development Requirements
2
Unrestricted
6(b)
Hotels (Non-Built up)
Max. coverage after ensuring setbacks
=>12 - 24m
2.5
5
>24 - 45m
2.5
8.75
> 45m
2.5
Unrestricted
7 (a)
Single Screen Cinema (Built-up/Non-built up)
Max. coverage after ensuring setbacks
=>12 - 24m
2
4
>24 - 45m
2
7
> 45m
2
Unrestricted
7(b)
Miniplex (Built-up/Non-built up)
Max. coverage after ensuring setbacks
=>12 - 24m
2
4
>24 - 45m
2
7
> 45m
2
Unrestricted
7(c)
Multiplex (Built up)
Max. coverage after ensuring setbacks
=>18 - 24m
2
4
>24 - 45m
2
7
> 45m
2
Unrestricted
7(d)
Multiplex (Non-Built up)
Max. coverage after ensuring setbacks
=>18 - 24m
3
6
>24 - 45m
3
9
> 45m
3
Unrestricted
8(a)
Petrol Filling Station w/o service station (Built up)
10%
=>12m
0.1
-
8(b)
Petrol Filling Station w/o service station (Non Built up)
10%
=>24m
0.15
8(c)
Petrol Filling Station with service station (Built up)
20%
=>12m
0.2
-
8(d)
Petrol Filling Station with service station (Non-Built up)
10%
=>24m
0.1
9
LPG / Gas Go down
25%
=>18m
0.25
0.25
10(a)
Service Apartment (Built-up)
Max. coverage after ensuring setbacks
=>12 - 24m
2
4
>24 - 45m
2
7
> 45m
2
Unrestricted
10(b)
Service Apartment (Non-Built up)
Max. coverage after ensuring setbacks
=>12 - 24m
2.5
5
>24 - 45m
2.5
8.75
> 45m
2.5
Unrestricted
11
Cold Storage
18m
12(a)
Storage/Warehousing (Built up)
Max. coverage after ensuring setbacks
12m
0.8
0.8
12(b)
Storage/Warehousing (Non-Built up)
Max. coverage after ensuring setbacks
12m
1.2
1.2
13
Fruit & Vegetable Market
Max. coverage after ensuring setbacks
12m
1
1
14(a)
Wholesale Business (Built)
Max. coverage after ensuring setbacks
12m
1.2
1.2
14(b)
Wholesale Business (Non-Built)
Max. coverage after ensuring setbacks
12m
1.5
1.5
15(a)
Office Buildings (Built up)
Max. coverage after ensuring setbacks
=>18 - 24m
2
4
>24 - 45m
2
7
> 45m
2
Unrestricted
15(b)
Office Buildings (Non-Built up)
Max. coverage after ensuring setbacks
=>18 - 24m
2.5
5
>24 - 45m
2.5
8.75
> 45m
2.5
Unrestricted
16(a)
Other Commercial (Built up)
Max. coverage after ensuring setbacks
Up to 12m
1.5
2.1
>12 - 24m
1.5
3.0
>24 - 45m
1.5
5.0
>45m
1.5
Unrestricted
16(b)
Other Commercial (Non-Built)
Max. coverage after ensuring setbacks
=>12 -24m
1.75
3.5
>24 -45m
1.75
6.0
>45m
1.75
Unrestricted
Note: Maximum Permissible FAR (MFAR) is calculated as per the provisions of purchasable FAR in Chapter-9
Unrestricted
6(a)
Medical College (Built up)
Max. coverage after ensuring setbacks
=>24 - 45m
1.5
5.25
> 45m
1.5
Unrestricted
6(b)
Medical College (Non-Built up)
Max. coverage after ensuring setbacks
=>24 - 45m
2.5
8.75
> 45m
2.5
Unrestricted
Note: Maximum Permissible FAR (MFAR) is calculated as per the provisions of purchasable FAR in Chapter-9
3
Guest House
Max. coverage after ensuring setbacks
More than 45m
1.5
Unrestricted
4
Utilities & Services
10%
0.1
5
Other institutional/ PSP
=>12 - 24m
2.0
4.0
5
Other institutional/ PSP
>24 - 45m
2.0
7.0
5
Other institutional/ PSP
More than 45m
2.0
Unrestricted
12m
0.4
0.4
2
Amusement Park
20%
12m
1.0
1.0
Transportation
Sl.
Use Types
Ground Coverage (%)
Road width (m)
Base FAR
Max. FAR
1
Multi-level Parking/ Bus Terminal/ Transportation Hub
Max. coverage after ensuring setbacks
=>12 - 24 m
1.5
3.0
>24 - 45 m
1.5
5.25
> 45 m
1.5
Unrestricted
Parks and Open Spaces
Open spaces (Built-up area)
5%
0.1*
Open spaces (Non-Built-up area)
5%
0.1*
Note: Maximum Permissible FAR (MFAR) is calculated as per the provisions of purchasable FAR in Chapter-9 *Note: Only for ancillary use.
N
N
N
N
N
N
N
7d
Storage of household goods or other goods or ordinarily non-combustible material incidental to principal use
N
N
N
N
N
N
N
7e
Storage not incidental to principal use.
Y
Y
Y
Y
Y
Y
Y
7f
Non-combustible storage rooms (stacking rooms) of libraries
Y
Y
Y
Y
Y
Y
Y
7g
Strong rooms, bank lockers, safe deposit vaults, laundry room, radio/laser therapy, post-mortem room, mortuary, medical shop and cold storage for hospital building etc.
Y
Y
Y
Y
Y
Y
Y
7h
Offices and commercial uses (if air-conditioned)
Y
Y
Y
Y
Y
Y
Y
7i
Commercial use in first basement in case of shopping center/ shopping malls.
Y
Y
Y
Y
Y
Y
Y
Sl.
Q: Is the structure included in FAR calculation? Key: Y= Yes, included in calculation N = No, not included in calculation NA = Not permitted thus not applicable
t i n u-ilMtu/legn<sup>i</sup>S-<sup>l</sup>i<sup>a</sup> <sup>t</sup>n diees R
g n <sup>i</sup>H<sup>sou</sup> poru G-<sup>l</sup>i<sup>a</sup> <sup>t</sup>n diees R
U<sup>es</sup> diex M/l<sub>i</sub><sup>a</sup>c e<sup>r</sup> <sup>m</sup><sub>m</sub>o C
s <sup>g</sup>n <sup>i</sup>d <sup>l</sup><sub>i</sub>u B iffec O
l <sup>a</sup>n i<sup>o</sup> <sub>i</sub><sup>t</sup><sub>tt</sub>s<sup>u</sup> I<sup>n</sup>
l i<sup>a</sup> dtrsu I<sup>n</sup>
hter O
7j
Nursing quarters as ancillary use to hospital in first basement, if proper ventilation is ensured.
Y
Y
Y
Y
Y
Y
Y
7k
Any other use related to ancillary use, e.g. toilets, if proper requirements of lighting, ventilation and fire safety are adhered to
Y
Y
Y
Y
Y
Y
Y
7l
In mixed use buildings, uses other than ancillary uses shall also be allowed after meeting lighting, ventilation and fire safety requirements.
Y
Y
Y
Y
Y
Y
Y
8a
Stilt floor used for parking
N
N
N
N
N
N
N
8b
Stilt Floor used for any purpose other than parking
Y
Y
Y
Y
Y
Y
Y
9
Podium Parking (with max. 10% of permissible land cover utilized for Driver Restroom, Store, Sanitary Block and other similar services)
N
N
N
N
N
N
N
10
Separate Parking Block for Plot Area above 4000 sqm.
N
N
N
N
N
N
N
11
Locked Garages in Rear Setback
N
Y
Y
Y
Y
Y
Y
12a
Balconies up to 2.0 metres
N
N
Y
Y
Y
Y
Y
12b
Balconies beyond 2.0 metres
Y
Y
Y
Y
Y
Y
Y
13a
Staircase
Y
Y
Y
Y
Y
Y
Y
13b
Fire Escape/ External Staircase
N
N
N
N
N
N
N
14
Planters and Sun Control Devices
N
N
N
N
N
N
N
15
Jali of any material to cover AC/cooler units
N
N
N
N
N
N
N
16
Rockery, well & well structures, water pool, uncovered swimming pool, tree platform, tank, fountain, bench, open-top & unenclosed chabutra, compound wall, gate, slide, swing, underground water tanks, overhead water tanks on top of buildings, open shafts, culverts on drain
N
N
N
N
N
N
N
17
Open ramps with no area enclosed below it of usable height. If used for approach to the entrance of the building, then the height as per requirement may be considered. The space under the ramp shall not be used for any commercial purpose, however it can be landscaped with approval of the Authority on case-to-case basis.
N
N
N
N
N
N
N
18
Open ramps for movement of vehicles in side setback only
N
N
N
N
N
N
N
19a
Atriums in Commercial/ Office & PSP above 3000 sqm Plot Area
NA
NA
N
N
N
NA
NA
19b
Temporary Counters maximum up to 20% of the area of Atrium
NA
NA
N
N
N
NA
NA
20
Service Floors (max. up to 3 floors), allowed on every 4<sup>th</sup> floor in a multistorey building
NA
NA
N
N
N
N
N
21
Any other feature purely ornamental in nature and not enclosing or covering space of commercial use may be permitted by Vice Chairman on case-to-case basis.
NA
N
N
N
N
N
N
22
Loft up to 30% of room area (max. 1.5 metre height)
N
N
N
N
N
N
N
23
Mumty
N
N
N
N
N
N
N
24
Bay Windows and Almirahs/ Niche
N
N
N
N
N
N
N
25
Refuge Area (As per fire norms)
N
N
N
N
N
N
N
Sl.
Q: Is the structure included in FAR calculation? Key: Y= Yes, included in calculation N = No, not included in calculation NA = Not permitted thus not applicable
t i n u-ilMtu/legn<sup>i</sup>S-<sup>l</sup>i<sup>a</sup> <sup>t</sup>n diees R
g n <sup>i</sup>H<sup>sou</sup> poru G-<sup>l</sup>i<sup>a</sup> <sup>t</sup>n diees R
U<sup>es</sup> diex M/l<sub>i</sub><sup>a</sup>c e<sup>r</sup> <sup>m</sup><sub>m</sub>o C
s <sup>g</sup>n <sup>i</sup>d <sup>l</sup><sub>i</sub>u B iffec O
l <sup>a</sup>n i<sup>o</sup> <sub>i</sub><sup>t</sup><sub>tt</sub>s<sup>u</sup> I<sup>n</sup>
l i<sup>a</sup> dtrsu I<sup>n</sup>
hter O
26
Service Duct
N
N
N
N
N
N
N
27
Services such as air conditioning equipment and other machines, DG set room, meter room and electric panel room, Effluent Treatment Plant, suction tank, pump room - maximum up to 5% of permissible FAR or 50sqm (incase of Plot Area <= 4000 sqm) / 100 sqm (in case of Plot Area > 4000 sqm)
N
N
N
N
N
N
N
Note: A maximum of 5.0 percent of the permissible FAR shall be availed for various types of services like airconditioned plants, in front of the lift (except corridor outside the lift), up to10 square meters shall be allowed for lobby, machine room for lift, Mumty, shelves and windows (maximum 0.60-meter depth and 1.80-meters length), refuse area (as per NBC), service duct and community centre.