Appendix 14Format for Structural Design Basis Report (SDBR) (B.11.7)
This report to accompany the application for Building Permit.
In case information on items 3, 10, 17, 18 and 19 cannot be given at this time, it should be submitted at least one week before commencement of construction.
Part 1: General Data
Sl No
Description
Information
Notes
1
Address ofthe building • Name ofthe building • Plot number • Subplot number • TPS scheme a. Name b. Number • Locality/Township • District
2
Name ofowner
3
Name ofBuilder on record
4
Name ofArchitect/Engineer on record
5
Name ofStructural engineer on record
6
Use ofthe building
7
Number ofstoreys above ground level (including storeys to be added later, if any)
8
Number ofbasements below ground Level
9
Type ofstructure • Load bearing walls • R.C.C frame • R.C.C frame and Shear walls • Steel frame
10
Soil data • Type ofsoil • Design safe bearing capacity
IS: 1893 Cl. 6.3.5.2 IS: 1904
11
Dead loads (unit weight adopted) • Earth • Water • Brick masonry • Plain cement concrete • Reinforced cement concrete • Floor finish • Other fill materials • Piazza floor fill and landscape
IS: 875 Part 1
12
Imposed (live) loads
IS: 875 Part 2
• Piazza floor accessible to Fire Tender • Piazza Floor not accessible to Fire Tender. 11Floor loads. 11Roof loads
IS:4326 Cl. 7 read with IS: 1893 Bld/Zone II III IV V Ord. B C D E Important C D E E
2
Basement Provided
3
Number offloors including Ground Floor (all floors including stepped floors in hill slopes)
4
Type ofwall masonry
5
Type and mix ofMortar
IS:4326 Cl. 8.1.2
6
Re: size and position ofopenings (See note No.1) • Minimum distance (b5) • Ratio (b1+b2+b3)/l1 or (b6+b7)/l2 • Minimum pierwidth between consequent opening (b4) • Vertical distance (h3) • Ratio ofwall height to thickness4 • Ratio ofwall length between cross wall to thickness
IS:4326 Table 4, Fig.7
7
Horizontal seismic band • at plinth level
P IP NA
(see note no.2) IS:4326 Cl. 8.4.6
• at window sill level • at lintel level • at ceiling level • at eave level ofsloping roof • at top ofgable walls • at top ofridge walls
Horizontal bracings in pitched truss • in horizontal plane at the level of ties • in the slopes ofpitched Roofs
(b)
Part 3: Reinforced concrete framed buildings
Sl No
Description
Information
Notes
1
Type ofBuilding Regular frames Regular frames with Shear walls Irregular frames Irregular frames with shear walls Soft storey
IS: 1893 Cl. 7.1
2
Number ofbasements
3
Number offloors including ground floor
4
Horizontal floor system Beams and slabs Waffles Ribbed Floor Flat slab with drops Flat plate without drops
5
Soil data Type of soil Recommended type of foundation - Independent footings - Raft - Piles Recommended bearing capacity of soil Recommended, type, length, diameter and
IS: 1498
load capacity ofpiles Depth of water table Chemical analysis of ground water Chemical analysis of soil
Ductile detailing ofRC frame • Type ofreinforcement used • Minimum dimension ofbeams • Minimum dimension ofcolumns • Minimum percentage ofreinforcement of beams at any cross section • Maximum percentage ofreinforcement at any section of beam • Spacing oftransverse reinforcement in 2-d length of beams near the ends • Ratio ofcapacity ofbeams in shear to capacity of beams in flexure • Maximumpercentage ofreinforcement in column • Confining stirrups near ends ofcolumns and in beam-column joints a. Diameter b. Spacing • Ratio of shear capacity of columns to maximum seismic shear in the storey
IS: 456 Cl. 5.6 IS:13920 Cl. 6.1 IS:13920Cl. 7.1.2 IS: 456 Cl. 26.5.1.1(a) IS:13920 Cl.6.2.1IS: 456 Cl. 26.5.1.1(b) IS:13920 Cl.6.2.2IS: 13920 Cl. 6.3.5 IS: 456 Cl. 26.5.3.1 IS: 13920 Cl. 7.4
(c)
General Notes
A certificate to the effect that this report will be completed and submitted at least one month before commencement of Construction shall be submitted with the application for Building Development Permission.
In addition to the completed report following additional information shall be submitted, at the latest, one month before commencement of Construction.
2.1 Foundations
2.1.1 In case raft foundation has been adopted indicate K value used for analysis of the raft
2.1.2 In case pile foundations have been used give full particulars of the piles, type, diameter, length, capacity.
2.1.3 In case of high-water table indicate system of countering water pressure, and indicate the existing water table, and that assumed to design foundations.
2.2 Idealization for Earthquake analysis
2.2.1 In case of a composite system of shear walls and rigid frames, give distribution of base shear in the two systems on the basis of analysis, and that used for design of each system.
2.2.2 Indicate the idealization of frames and shear walls adopted in the analysis with the help of sketches.
2.3 Submit framing plans of each floor.
2.4 In case of basements, indicate the system used to contain earth pressures.
Part 4: Buildings in Structural Steel
1
Adopted method ofDesign
O Simple OSemi-rigid O Rigid
IS: 800; Cl. 3.4.4 IS: 800; Cl. 3.4.5 IS: 800; Cl. 3.4.6
2
Design based on
O Elastic analysis O Plastic analysis
IS: 800; Section-9 SP: 6 (6)
3
Floor Construction
O Composite ONon-composite O Boarded
4
RoofConstruction
O Composite ONon-composite O Metal O Any other
5
Horizontal force resisting system adopted
O Frames O Braced frames O Frames& shear walls
Note: Seismic force Asper IS: 1893Would depend on system
6
Slenderness ratios maintained
Members defined in Table 3.1, IS: 800
IS: 800; Cl. 3.7
7
Member deflection limited to
Beams, Rafters Crane Girders Purlins Top ofColumns
IS: 800; Cl. 3.13
8
Structural members
OEncased in Concrete O Not encased
IS: 800; Section-10
9
Proposed material
OGeneral weld-able O High strength OCold formed O Tubular
IS: 2062 IS: 8500 IS: 801, 811 IS: 806
10
Minimum metal thickness Specified for corrosionprotection
O Hot rolled sections OCold formedsections O Tubes
IS: 800, Cl. 3.8 Cl. 3.8.1 to Cl. 3.8.4 Cl. 3.8.5 Cl. 3.8.5
11
Structural connections
O Rivets O C T Bolts O S H F G Bolts O Black Bolts O Welding-Field Shop (Specify welding type proposed) O Composite
IS: 800; Section-8 IS: 1929,2155,1149 IS: 6639, 1367 IS: 3757, 4000 IS: 1363, 1367 IS: 816, 814, 1395,7280, 3613, 64196560, 813, 9595
Minimum Fire rating Proposed, with method
O Rating ---------- hours O Method proposed-- In tumescent Painting - Spraying - Quilting Fire retardant boarding
IS: 1641, 1642, 1643
Appendix-15: Use zones across different master plans
Sl. No.
1
2
3
4
5
#
Development Authority/ Use Zone
Ayodhya
Bareilly
Muzaffarnagar
Gorakhpur
Khurja
1
Built up
Built-up
Built-up
Built-up
Built-up
Built-up
2
Residential
Residential
Residential
Residential
Residential
Residential
3
Mixed Use 1&2
Mixed Use
NIL
NIL
NIL
NIL
4
Commercial 1-Retail /CBD /Sub-CBD /Bazaar Street
Commercial
C1- City Centre/ Sub- City Centre C3 -Bazaar Marg
Commercial Bazaar Marg
C1- Bazaar Marg/ Commercial Centre C2- City Centre/ Sub- City Centre
Commercial Bazaar Street
5
Commercial 2-Wholesale/ Godown
NIL
C2- Wholesale / Storage
NIL
C3- Wholesale / Storage/godown /Warehousing
Warehouse/Mandi
6
Small Industries
Industries
Small Industries
IT Park
Small Industries
NIL
7
Large Industries
NIL
Large Industries
Industries
Medium/Large Industries
Industries
8
Office Buildings
Offices
Offices
Offices
Offices
Offices
9
Public & Semi-public
Public & Semi-public Facilities Historical Places Religious Places
Community Facilities / Utilities Educational Institution Hospital Water works /Power Station Radio Station /Doordarshan Treatment Plant / Dumping Ground Sewage Farm
Public Facilities Public Utilities Ganna Shodh Kendra Medical/ Medicity Vidyut Kendra Landfill
1-Public & Semi-public Facilities (Educational, Healthcare Facilities, Hospital) 2-Social & Religious Institution-Community Facilities, Radio Station /Doordarshan 3-Public utilities & services-Sewage Farm, SWM, Electrical sub station
Public Semi-Public Facilities & Utilities
10
Transport 1&2, Parking
Transport Facility Bus Stand
T1 - Bus terminal/Truck terminal T2 - Marg Parking Areas
Bust Station Transport Nagar Railways
Transport centre/Bus terminal/ Truck terminal
Appendix-15 (part-2)
Sl. No. 6 7 8 9 10
#
Development Authority/ Use Zone
Bulandshahr
Basti
Meerut
Saharanpur
Moradabad
1
Built up
Built-up
Built-up
Built-up
Built-up
Built-up
2
Residential
Residential
Residential
Residential
Residential
Residential
3
Mixed Use 1&2
NIL
NIL
Mixed Use
NIL
NIL
4
Commercial 1-Retail /CBD /Sub-CBD /Bazaar Street
Commercial Bazaar Street
C1- Bazaar Marg/ Commercial Centre C2- City Centre/ Sub- City Centre
Commercial Bazaar Street Saghan Bazar
Bazaar Street/ Bazaar Area City Centre/ Sub- City Centre
(C-1)- City Centre/ Central Commercial (C-2)-Sub City Centre/Sub Central Commercial (C-4) -Bazaar Street
Bus Terminal/Truck Terminal Railway Yard/Railway Line
Transport 1 - Bus terminal/Truck terminal Marg
Bus terminal Air Strip/ Airport Transport Nagar Cargo Centre RRTS Depot
Appendix-15 (part-3)
Sl. No.
11
12
13
14
15
#
Development Authority/ Use Zone
Mathura-Vrindavan
Aligarh
Jhansi
Rampur
Firozabad-Shikohabad
1
Built up
Built-up
Built-up
Built-up
Built-up
Built-up
2
Residential
Residential
Residential
Residential
Residential
Residential
3
Mixed Use 1&2
NIL
NIL
NIL
NIL
NIL
4
Commercial 1-Retail /CBD /Sub-CBD /Bazaar Street
City Centre Sub- City Centre Bazaar Street
Commercial Bazaar Street
Bazar Street Commercial, Retail shops Sector/Neighbour Hood
(C-1) - City Centre (C-2) - Sub-City Centre (C-3) - Zonal Commercial (C-5) - Bazaar Street
Bazaar Street City Centre Sub city Centre
5
Commercial 2-Wholesale/ Godown
Wholesale
District Business Wholesale Business Centre
Wholesale/ Storage
(C-4) - Wholesale/ Storage
Wholesale Business
6
Small Industries
Small Industries IT industries
Small Industries
Small Industries
Small Industries
Small & Service Industries
7
Large Industries
Large Industries
Large Industries Defence Industrial Corridor
Large / Medium Industries Logistic Park, Technology park; Crusher Zone
Large Industries
Large Industries
8
Office Buildings
Offices, Police Lines
Offices
Offices
Govt Semi-govt and other Offices
Offices
9
Public & Semi-public
Public Semi-Public Facilities Amusement park Knowledge park Medical & Health Care Tourist Facilitation Centre
Community Facilities Inter college; Graduate / Post Graduate College; Pravidhik sansthan Aligarh Muslim university Utilities & Services Police Station/ Thana Fire Station, Phone Booth Post Office, Sewage Farm/Treatment Plant Healthcare District Hospital; Other Main Hospitals
Public Semi-Public Facilities Dumping Ground Sewage Farm/ STP Regional/ Historical Place Shamshan / Kabristan Flood Area
(F1) - Community Facilities /Utilities, Public Services and Utilities (F2) - Electrical Sub-station (F3) - Sewerage Treatment Plant (F4) - Solid Waste Disposal Centre (F5) -Sewage Farm
Appendix-15 (part-4)
Sl. No. 16 17 18 19
#
Development Authority/ Use Zone
Varanasi-1
Varanasi-2
Agra
Hapur
1
Built up
Built-up
Built-up
Built-up
Built-up
2
Residential
Residential
Residential
Residential
Residential
3
Mixed Use 1&2
Mixed Use
Mixed Use
NIL
NIL
4
Commercial 1-Retail /CBD /Sub-CBD /Bazaar Street
City Centre Sub- City Centre Bazaar Street Other Commercial
City Centre Sub- City Centre Bazaar Street
Bazaar Street City Centre/ CBD Sub-city centre/Sub-CBD Neighbourhood, Tourism
Commercial/ Leather Mandi/ Business Centre Bazaar Street
5
Commercial 2-Wholesale/ Godown
Wholesale/ Warehousing/ Mandi
Wholesale/ Warehousing/ Mandi
Wholesale Business
NIL
6
Small Industries
Small & Service Industries
Small & Service Industries
Non polluting industries
7
Large Industries
Medium/Large Industries
Medium/Large Industries
Non polluting industries
NIL
8
Office Buildings
Govt Semi-govt and other Offices
Govt Semi-govt and other Offices
Offices
Offices
9
Public & Semi-public
Public Semi-Public Facilities Services and Utilities
Public Semi-Public Facilities and Services and Utilities
Community Facilities
10
Transport 1&2, Parking
Transport Services Airport/ Water Transport Terminal Railway Yard/ Railway Land
Transport Services Airport/ Water Transport Terminal Railway Yard/ Railway Land
Transport Nagar Bus stand
Traffic and Transportation
11
Forest
Garden
Garden
Forest area
NIL
12
Recreational 1&2
Park
Park
Sector Park, Regional Park, District Park, Zonal Park, Amusement Park, National Park, Riverfront Development
Recreational area
13
Green belt
Green Belt
Green Belt
Green Belt
Green Belt
Appendix-15 (part-5)
Sl. No. 20 21 22
#
Development Authority/ Use Zone
Kanpur
Mirzapur-Vindhyachal
Prayagraj
1
Built up
Built-up
Built-up
Built-up
2
Residential
Residential
Residential
Residential
3
Mixed Use 1&2
NIL
NIL
NIL
4
Commercial 1-Retail /CBD /Sub-CBD /Bazaar Street
City Centre/ CBD Sub-city centre Bazaar Street
Zonal Centre, City Centre Bazaar Street
District Centre, City Centre General Business, Bazaar Street
5
Commercial 2-Wholesale/ Godown
Warehousing/ Agricultural Produce Mandi
Wholesale/ Storage Godown/ Warehouse
Wholesale/ Storage
6
Small Industries
Small & Service Industries Cottage Industries
Small Industries
Small Industries/Cottage
7
Large Industries
Medium/Large Industries
NIL
Medium Industries Large Industries
8
Office Buildings
Offices
Govt Semi-Govt and Local Offices Private Offices/ Agent Offices Banks
Govt Semi-Govt and Local Offices Private Offices/ Agent Offices Banks
9
Public & Semi-public
1. Public Semi-Public Facilities and Services and Utilities 2. Educational Institution, Healthcare Services, Knowledge Park, Technical/Specialized institutes 3. Jalkal, Power house, HT Line, Dumping Ground, STP, Fire Station, Police Station, Telecom
School, College University, Technical, Hitech, General Hospital Medical College Jalkal, Power, Sewage Farm
School, College University, Technical, Hitech, General Hospital Medical College Jalkal, Power, Sewage Farm
10
Transport 1&2, Parking
Transport Services Airstrip/ Airport/ Water Transport/ ISBT Bus Terminal/ Railway Yard/ Railway land/ Truck Terminal/ Multi-modal logistic park
Transport Nagar Bus Terminal Truck Terminal Water Transport
Transport Nagar Bus Terminal ; Truck Terminal Water Transport
11
Forest
Reserved Forest, Afforestation Bird Sanctuary
Protected Forests
Afforestation Grassland and Dairy Farm
12
Recreational 1&2
1. Parks and Open Spaces 2. Stadium/ Playground/ District Park/ Regional Park/ Amusement Park, Ecological Park/ Mela ground 3. Riverfront Development
Development Authority
Building Construction and Development Byelaws 2025
The quick brown fox jumps over the lazy dog.
Bus Terminal /Truck Terminal
11
Forest
NIL
Garden Forest
NIL
NIL
Forest
12
Recreational 1&2
Park and Open Spaces Fair Ground and Garden
P1 - Recreational Park / Zonal Park P2 - Park / District Park / Exhibition Park / Mela / Rally Ground
Park and Open Areas Baagh & Udyaan Regional Park Stadium
Park / Open Spaces/Recreational Area
Park & Open Spaces
13
Green belt
Green Belt
Green Belt
Green Belt
Green Belt
Green Belt
14
Rural Abadi
Rural Abadi
Rural Abadi
Rural Abadi
Rural Abadi
Rural Abadi; Future expansion
15
Agriculture
Agriculture
Agriculture
Agriculture
Agriculture
Agriculture
16
Highway Facilities
Highway Facility Zone
Highway Facility Zone
Highway Facility Zone
Highway Facility Zone
Highway Facility Zone
17
Additional Land use
Bus Terminal Truck Terminal Railway Area
(T-1) - Bus terminal (T-2)-Truck terminal (T-3)-Railway Notified Area (T-4)-Existing Road; (T-5)-Proposed Road (T-6)-Railway Line (T-9)-Proposed fly over
11
Forest
NIL
NIL
Forest
NIL
Garden; Forest
12
Recreational 1&2
Park & Open Spaces
Park/open spaces and playground
Park and Open Area/ Stadium Regional Park Amusement Park
Regional Park Park and Open Area
(P-1)-District Park (P-2)-Zonal Park; (P-3)-Park (P-4)-Riverfront Development (P-6)-non-conforming developed green area.
13
Green belt
Green Belt
Green Belt
Green Belt
Green Belt
Green Belt
14
Rural Abadi
Rural Abadi; Future expansion
Rural Abadi
Rural Abadi
Rural Abadi; Future expansion
Rural Abadi
15
Agriculture
Agriculture
Agriculture
Agriculture
Agriculture
Agriculture
16
Highway Facilities
Highway Facility Zone
Highway Facility Zone
Highway Facility Zone
Highway Facility Zone
Highway Facility Zone
17
Additional Land use
Inter College; Degree College Technical Institutes Hospital Police/Fire Station Post Office/ Telecom Centre Electric Station Water Works Sewage Treatment Plant Religious Place Knowledge Park
10
Transport 1&2, Parking
Transport Nagar Parking & Camping Area Bus Terminal
Transport 1 - (Bus terminal) Transport 2 - (Truck terminal) Parking Areas, Air Strip Existing roads, Proposed roads Railway lines/ Railway campus Dedicated Freight Corridor