Following provisions shall be applicable for the bazaar streets proposed in the master plan. In case a bazaar street notified in master plan falls within the layouts approved or developed by the Authority the provisions of this chapter shall automatically apply on payment of prescribed fee. No separate change of layout shall be required and only the relevant corrections in the lease/sale deed shall be done.
5.1.2 Means of Access
(i) The right-of-way of the bazaar street shall be minimum 12-meters, or the width proposed in the master plan.
(ii) Commercial use on a bazaar street will be allowed on the entire depth of the plot.
5.1.3 Maximum Building Height
(i) There shall be no restriction on building height for bazaar streets. However, the maximum height of the building shall be governed by distance from the protected monument/ heritage site, airport funnel zone and other statutory restrictions.
(ii) Commercial use shall be permitted on the ground and first floors only, while residential use shall be allowed on the subsequent floors. Residential use on ground and first floor may be permitted on the request of the plot owner.
5.1.4 Ground Coverage and FAR
(i) Maximum ground coverage after ensuring minimum setbacks and open space requirements, if any, shall be permissible on plots in the bazaar street.
(ii) Purchasable and premium purchasable FAR shall be applicable as per the requirements of Chapter-9. Basis approach road width, the maximum permissible FAR (including Base FAR) for bazaar streets in built-up areas and the non-built-up areas shall be as follows:
FAR Commercial Buildings
Road Width (Upto12m)
Road Width (>12 -24m)
Road Width (>24 - 45m)
Road Width (>45m)
BFAR
PFAR
PPFAR
MFAR
PFAR
PPFAR
MFAR
PFAR
PPFAR
MFAR
PFAR
PPFAR
MFAR
Built-up Area
Bazaar Street
1.5
NA
NA
1.5
0.75
0.75
3.0
1.5
2.25
5.25
1.5
UR
UR
Non-Built-up Area
Bazaar Street
1.75
NA
NA
1.75
0.9
0.9
3.6
1.75
2.6
6.1
1.75
UR
UR
Note-1: BFAR – Base FAR, PFAR – Purchasable FAR, PPFAR – Premium Purchasable FAR, MFAR – Maximum Permissible FAR which includes Base FAR, UR – Unrestricted FAR.
Note-2: In green building, additional FAR over and above maximum permissible FAR shall be provided as per Chapter 9.3 of the building byelaws.
5.1.5 Minimum Setback
Based on the proposed road width, the minimum front setback for plots on the bazaar street shall be as follows:
Proposed width of road (metres)
Minimum open space in front (metres)
12
3.0
18
4.5
24
6.0
30
6.0
36
7.5
45
7.5
76
9.0
5.1.6 Parking Requirement
Parking requirements for bazaar street shall be as per paragraph 3.3.4 of the building byelaws.
5.1.7 Basement
The permissibility of basement in bazaar street plots shall be as per paragraph 3.3.3 of the building byelaws.
5.2Shops, Commercial Complex and Shopping Malls
5.2.1 Permission
The construction of commercial establishments viz., shops, commercial complexes and shopping malls shall be permitted according to the masterplan/zoning regulations.
5.2.2 Minimum Plot Size
The minimum area of the plot for construction of commercial establishments viz., shops, commercial complexes and shopping malls shall be as follows.
Commercial Establishments
Min. Plot Area (sqm)
1
Retails Shops
>10 to 100
2
Convenient Shopping / Commercial Units
=>100 to 300
2
Commercial Complex (including other commercial)
More than 300 - 3000
3
Shopping malls
More than 3000
5.2.3 Minimum Road Width
The minimum width of existing approach road to plots for construction of commercial establishments viz., shops, commercial complexes and shopping malls shall be as follows.
Commercial Facilities
Min. Road Width (m)
1
Retail Shops
6 (built up) 9 (non-built up)
2
Convenience Shopping /Commercial Units
12
3 Commercial Complex 12
3 Commercial Complex 12
3 Commercial Complex 12
3 Commercial Complex 12
3 Commercial Complex 12
3 Commercial Complex 12
4
Shopping malls
18
5
Other Commercial (plot size >300 sqm)
12
5.2.4 Maximum Building Height
There shall be no restriction on building height for commercial buildings i.e. shops, commercial complex, shopping malls. However, the maximum height of the building shall be governed by distance from the protected monument/ heritage site, airport funnel zone and other statutory restrictions.
5.2.5 Ground Coverage and FAR
(i) Maximum ground coverage after ensuring minimum setbacks and open space requirements, if any, shall be permissible on plots for commercial establishments i.e. shops, commercial complex, shopping malls.
(ii) Purchasable and premium purchasable FAR shall be applicable as per the requirements of Chapter 9. Basis approach road width, the maximum permissible FAR (including Base FAR) for bazaar streets in built-up areas and the non-built-up areas shall be as follows:
FAR Commercial Buildings
Road Width (Upto12m)
Road Width (>12 -24m)
Road Width (>24 - 45m)
Road Width (>45m)
BFAR
PFAR
PPFAR
MFAR
PFAR
PPFAR
MFAR
PFAR
PPFAR
MFAR
PFAR
PPFAR
MFAR
Built-up Area
Comm. Units up to100 sqm
1.5
0.3
0.3
2.1
0.75
0.75
3.0
1.5
2.25
5.25
1.5
UR
UR
Comm. Units >100 sqm
1.5
NA
NA
1.5
0.75
0.75
3.0
1.5
2.25
5.25
1.5
UR
UR
Shopping malls
2.0
NA
NA
2.0
1.0
1.0
4.0
2.0
3.0
7.0
2.0
UR
UR
Non-Built-up Area
Commercial Units* up to100 sqm
1.75
0.35
0.35
2.45
0.9
0.9
3.6
1.75
2.6
6.1
1.75
UR
UR
Commercial Units* >100 sqm
1.75
NA
NA
1.75
0.9
0.9
3.6
1.75
2.6
6.1
1.75
UR
UR
Shopping malls
3.0
NA
NA
3.0
1.5
1.5
6
3.0
4.5
10.5
5.2.6 Minimum Setback
Minimum setbacks for commercial establishments viz., shops, commercial complexes, and shopping malls shall be per paragraph 3.2.4 of the building byelaws.
5.2.7 Parking Requirements
Parking requirements for commercial establishments viz., shops, commercial complexes and shopping malls shall be as per paragraph 3.3.4 of the building byelaws.
5.2.8 Basement
The permissibility of basement in commercial establishments viz., shops, commercial complexes and shopping malls shall be as per paragraph 3.3.3 of the building byelaws.
3.0
UR
UR
*Commercial Units include Shops / Convenience Shopping / other commercial complexes etc.
Note-1: BFAR – Base FAR, PFAR – Purchasable FAR, PPFAR – Premium Purchasable FAR, MFAR – Maximum Permissible FAR which includes Base FAR, UR – Unrestricted FAR.
Note-2: In green building, additional FAR over and above maximum permissible FAR shall be provided as per paragraph 9.3 of the building byelaws.
(iii) Construction of skylighted Atrium shall be allowed in the shopping malls. Such atriums shall not be counted in FAR calculations. No permanent construction shall be allowed within the atrium space rather it shall be used for circulation. Temporary kiosks shall be permitted in maximum 20% of the
atrium area such that they do not hinder circulation area below atrium. area. The entry/ exits, passage areas within the shopping mall shall be free from any obstructions.
5.3Hotels
5.3.1 Permissibility
Permission for construction of hotels shall be as per the provisions of Master Plan/ Zoning Regulations.
5.3.2 Minimum Plot Size
The minimum number of rooms in hotel building shall be six (6). Up to 20 rooms there shall be no restriction on the minimum plot area for construction of hotels. For construction of hotels with more than 20 rooms, the minimum plot area shall be 500 sqm
5.3.3 Means of Access
In residential areas, the minimum width of the approach road for construction of hotels up to 20 rooms shall be 9 m. For hotels more than 20 rooms, the width of approach road shall be 12 m.
5.3.4 Maximum Building Height
There is no restriction on the maximum building height. However, the maximum height of the building shall be governed by distance from the protected monument/heritage site, airport funnel zone and other statutory restrictions.
5.3.5 Ground coverage and FAR.
(i) Maximum ground coverage after ensuring minimum setbacks and open space requirements, if any, shall be permissible.
(ii) Purchasable and premium purchasable FAR shall be applicable as per the requirements of Chapter 9. Basis approach road width, the maximum permissible FAR (including Base FAR) for hotels in builtup areas and the non-built-up areas shall be as follows:
FAR Hotels
Road Width (Upto12m)
Road Width (Upto12m)
Road Width (Upto12m)
Road Width (>12 -24m)
Road Width (>12 -24m)
Road Width (>12 -24m)
Road Width (>24 - 45m)
Road Width (>24 - 45m)
Road Width (>24 - 45m)
Road Width (>45m)
Road Width (>45m)
Road Width (>45m)
FAR Hotels
BFAR
PFAR
PPFAR
MFAR
PFAR
PPFAR
MFAR
PFAR
PPFAR
MFAR
PFAR
PPFAR
MFAR
Built-up Area
Hotels
2.0
NA
NA
2.0
1.0
1.0
4.0
2.0
3.0
7.0
2.0
UR
UR
FAR Hotels
Road Width (Upto12m)
Road Width (Upto12m)
Road Width (Upto12m)
Road Width (>12 -24m)
Road Width (>12 -24m)
Road Width (>12 -24m)
Road Width (>24 - 45m)
Road Width (>24 - 45m)
Road Width (>24 - 45m)
Road Width (>45m)
Road Width (>45m)
Road Width (>45m)
FAR Hotels
BFAR
PFAR
PPFAR
MFAR
PFAR
PPFAR
MFAR
PFAR
PPFAR
MFAR
PFAR
PPFAR
MFAR
Non-Built-up Area
Hotels
2.5
NA
NA
2.5
1.25
1.25
5.0
2.5
3.75
8.75
2.5
UR
UR
Note-1: BFAR – Base FAR, PFAR – Purchasable FAR, PPFAR – Premium Purchasable FAR, MFAR – Maximum Permissible FAR which includes Base FAR, UR – Unrestricted FAR.
Note-2: In green building, additional FAR over and above maximum permissible FAR shall be provided as per Chapter 9.3 of the building byelaws.
5.3.6 Minimum Setback
The minimum setback requirement for hotel buildings shall be as per paragraph 3.2.4 of the building byelaw.
5.3.7 Parking Requirements
Parking requirements for hotel buildings shall be as per paragraph 3.3.4 of the building byelaws.
5.3.8 Basement
The permissibility of basement in hotel buildings shall be as per paragraph 3.3.3 of the building byelaws.
5.3.9 Provisions for Hotels in Heritage Buildings
(i) As per UP Tourism Policy 2022, Heritage hotels will be defined as per the Ministry of Tourism, Government of India guidelines according to which the heritage value old buildings/ forts/havelis/kothis/castles constructed prior to 1950, on being operated as hotels will be included in the category of heritage hotels. Heritage hotels can be of any size and dimension. Heritage Homestay refers to those units wherein the tourist resides with the owner or any of his/her family member in the usual place of residence which must be a heritage building.
(ii) In buildings declared as heritage buildings by Toursim Department, adaptive reuse of existing residential/ non-residential buildings as hotels shall be permitted by the Authority. The provisions related to means of access, ground coverage, FAR, setbacks, means of access, parking etc. may be relaxed by the Authority on the recommendation of the Heritage Conservation Committee.
(iii) FAR incentive – Subject to the approval of competent authority, FAR incentives may be provided for heritage building owners who undertake restoration and conservation work, promoting preservation of historic structures. Higher FAR for heritage buildings being adaptively reused for compatible purposes, such as hotels, restaurants, or museums, to encourage their economic viability. Heritage features such as ornate facades, balconies, or courtyards, may be exempt from FAR calculations, allowing owners to preserve these essential elements. Heritage building owners incorporating green building features such as solar panels, rainwater harvesting, or energy efficient systems shall be offered FAR bonus of 0.25 or 0.50 over and above base FAR.
(iv) Road Width - Heritage buildings, proposed to be used as heritage hotels, shall be permissible on existing road width of atleast 5 meters in areas which have traditionally considered to be religious and spriritual hotspots wherein most of the roads are narrow. In case of non-heritage areas, minimum width of existing approach road shall be 7.5 meters.
(v) Parking - Heritage buildings proposed to be used as heritage hotels, situated on narrow roads in
urban areas which arrange for dedicated alternative parking on wider roads (more than 12-m) and provide for park and ride system from Hotel to parking place shall be permitted.
(vi) Commercial Use -. All heritage buildings, those are residential/institutional, heritage tourism units can commercially convert a maximum 1000 square meters or 10 percent of plinth area of the existing heritage building, whichever is less for purposes such as retail shops or souvinier shops.
(vii) Setback relaxations - The development authority may consider relaxation in the norms related to setbacks in high density areas. Towards facilitating the restoration and reuse of heritage buildings, the development authority may provide relaxations in setback and parking requirements for heritage buildings on case to case basis, acknowledging the unique challenges posed by their location and design.
(viii) The composition of the Heritage Conservation Committee shall be as follows:
a. Chairman, Vice-Chairman, Development Authority
b. Member – Commissioner, Municipal Corporation
c. Member – District level officer, Tourism Department
d. Member – District level officer of Culture Department
e. Member – Representative, Fire Department
f. Member – Representative, O/o Chief Town and Country Planner
g. Member Secretary – Chief Town Planner/ In-charge, Planning, Dev. Authority.
h. Any other subject matter expert nominated by the Chairman.