1 SCOPE
This Part lists the terms which are appearing in all the Parts/Sections of the National Building Code of India, along with their definitions. The terms have been arranged in their alphabetical order. The Part(s)/Section(s) in which these terms are appearing, have been indicated against the terms.
However, some common definitions are reproduced in this Part also, the definitions being placed immediately below the term concerned.
A
A95 — Part 8/Section 5A
Abandoned Sign — Part 10/Section 2
Ability — Part 3
Acceleration — Part 8/Section 5A, Part 8/Section 5B
*Access — Part 3, Part 12
Access Aisle — Part 3
Access Panel — Part 9/Section 1
Access Point — Part 8/Section 6
Accessible Site, Building, Facility or Portions — Part 3
Accessible Route — Part 3
Accessible Toilet — Part 3
Accessory — Part 8/Section 2
Accessory Use — Part 2, Part 3
Any use of the premises subordinate to the principal use and customarily incidental to the principal use.
Accidental Loads — Part 6/Section 6
Accompanying Load — Part 6/Section 6
Action — Part 6/Section 6
Action Effect or Load Effect — Part 6/Section 6
Actual Length — Part 6/Section 6
Adaptive Thermal Comfort — Part 11
Advertising Sign — Part 10/Section 2
*Ageing — Part 3, Part 12
Air Admittance Valve — Part 9/Section 2
Air Break — Part 9/Section 2
Air Change per Hour — Part 8/Section 1
Air Circuit Breaker (ACB) — Part 8/Section 2
Air Conditioning — Part 8/Section 3
Air Gap, Drainage — Part 9/Section 2
Air Gap, Water Distribution — Part 9/Section 1
Air System Balancing — Part 8/Section 3
* Definitions are different.
Air Valve — Part 9/Section 1
Allowable Load — Part 6/Section 2
Alteration — Part 2, Part 3
A change from one type of occupancy to another, or a structural change, such as an addition to the area or height, or the removal of part of a building, or any change to the structure, such as the construction of, cutting into or removal of any wall, partition, column, beam, joist, floor or other support, or a change to or closing of any required means of ingress or egress or a change to the fixtures or equipment.
Alternating Current Variable Voltage (ACVV)
Control — Part 8/Section 5A
Alternating Current Variable Voltage Variable
Frequency (ACVVVF) Control — Part 8/Section 5A
Altitude — Part 8/Section 1
Ambient Noise — Part 8/Section 4
Anaerobic Digestion — Part 9/Section 3
Anchor Pile — Part 6/Section 2
Anchorage Device — Part 6/Section 5B
Angle of Attack — Part 6/Section 1
Angle of Inclination — Part 8/Section 5B
Animated Sign — Part 10/Section 2
Annealed Fire Resistant Glass — Part 6/Section 8
Annealed Glass (see Glass) — Part 6/Section 8
Antenna — Part 8/Section 6
Anti-siphon — Part 9/Section 1
Apparatus — Part 8/Section 2
Appliance — Part 8/Section 2
Appliance Valve — Part 9/Section 4
Approved — Part 2, Part 3, Part 10/Section 2
Approved by the Authority having jurisdiction.
Approved Agency — Part 9/Section 4
Appurtenance — Part 9/Section 1
Area of Rescue Assistance — Part 3
Area of Special Control — Part 10/Section 2
As-built Information — Part 12
As-cut Finished Sizes — Part 6/Section 8
Aspect Ratio — Part 6/Section 8
Assembly Buildings — Part 6/Section 1
PART 1 DEFINITIONS
Asset — Part 12
Asset Life — Part 12
Asset Register — Part 12
Asset Type — Part 12
Asset/Facility Management — Part 12
Assisted Evacuation — Part 3, Part 4
Assistive Product/Device — Part 3
Atmospheric Pressure — Part 8/Section 3
Atrium — Part 4
Attenuation — Part 8/Section 6
Audible Frequency Range — Part 8/Section 4
Authorities Concerned — Part 4
An organization, office, or individual responsible for enforcing the requirements of a code or standard, or for approving or accepting equipment, materials, an installation, or a procedure.
Authority Having Jurisdiction — Part 0, Part 2,
Part 3, Part 6/Section 7A, Part 6/Section 7B,
Part 7, Part 9/Section 1, Part 9/Section 4,
Part 10/Section 2, Part 11
The authority which has been created by a statute and which, for the purpose of administering the Code/Part, may authorize a committee or an official or an agency to act on its behalf; hereinafter called the ‘Authority’.
Authorization — Part 9/Section 3
Automatic Door — Part 3
Automatic Fire Detection and Alarm System — Part 4
Automatic Operation — Part 8/Section 5A
Automatic Rescue Device — Part 8/Section 5A
Automatic Sprinkler System — Part 4
Automatic Water Spray Systems — Part 4
Auxiliary Brake — Part 8/Section 5B
Available Head — Part 9/Section 1
Avenue — Part 10/Section 1
A-Weighted Sound Pressure — Part 8/Section 4
A-Weighted Sound Pressure Level — Part 8/Section 4
Axial Flow Fan — Part 8/Section 1
Axis of Measurement — Part 8/Section 5A
Azimuth — Part 8/Section 1